SR 16 Eastbound - Road work on SR 16 eastbound from milepost 0.5 near S Sprague Ave to milepost 0.00 near I-5 beginning at 9:36 pm on September 19, 2018 until about 4:15 am on September 20, 2018. Last Updated: 9/19/2018 10:00 PM More Info
From milepost 0 to milepost 0
HIGH IMPACT
US 101 Both Directions - Road work on US 101 both directions from milepost 250 near Baker St to milepost 253 near Port Angeles East City Limits beginning at 9:52 pm on September 19, 2018 until about 3:15 am on September 20, 2018. Last Updated: 9/19/2018 9:55 PM More Info
From milepost 250 to milepost 253
HIGH IMPACT
US 101 Southbound - Road work on US 101 southbound from milepost 353.05 near SE Old Olympic Hwy to milepost 351 near Fredson Rd beginning at 7:55 pm on September 19, 2018 until about 6:00 am on September 20, 2018. Last Updated: 9/19/2018 7:57 PM More Info
From milepost 353 to milepost 351
HIGH IMPACT
SR 162 Both Directions - The SR 162 Spiketon Creek Bridge has been permanently closed due to recently discovered pier settlement. A detour is in effect using Mundy Loss Road, SR 410 and SR 165. View our blog for updates about the bridge's future. Last Updated: 9/19/2018 11:00 AM More Info
At milepost 20
HIGH IMPACT
SR 304 Eastbound - Road work on SR 304 eastbound at milepost 2 near Naval Ave beginning at 8:29 am on September 19, 2018 until about 3:00 pm on September 20, 2018. Last Updated: 9/19/2018 8:34 AM More Info
At milepost 2
HIGH IMPACT
US 395 Spur - NSC Southbound - US 395 Southbound at Milepost 167, lanes will be closed from 7 am to 3:30 pm on Wednesday, September 19th, and Thursday, September 20th for bridge deck sealing. Last Updated: 9/18/2018 11:51 AM More Info
At milepost 167
HIGH IMPACT
US 395 Spur - NSC Northbound - US 395 Northbound at Milepost 167, left lane will be closed from 7 am to 3:30 pm on September 18th for bridge deck sealing. Last Updated: 9/18/2018 11:50 AM More Info
At milepost 167
HIGH IMPACT
SR 409 Both Directions - Monday, Sept. 17 to the morning of Friday, Sept. 21: Both directions of SR 409/Puget Island Bridge will fully close overnight beginning at 9 p.m. Monday, Sept. 17 until 5 a.m. Friday, Sept. 21. Last Updated: 9/14/2018 4:00 PM More Info
From milepost 3 to milepost 4
HIGH IMPACT
I-90 Eastbound - Work is scheduled for Thursday, September 20 from 7 am to 4:30 pm. Roadway users should expect delays, and be alert for a short-term road closure of the Tyler Eastbound On-ramp planned from 8 am to noon. Last Updated: 9/14/2018 3:12 PM More Info
At milepost 257
HIGH IMPACT
SR 291 Both Directions - Survey operations on SR 291 northbound from milepost 9.0 near Nine Mile Rd to milepost 14.0 beginning at 10:00 am until about 2:00 pm on Wednesday, September 19, 2018. Flagging controlled operations with one-lane, two-way traffic. Expect delays up to 15 minutes. Last Updated: 9/14/2018 2:58 PM More Info
From milepost 9 to milepost 14
HIGH IMPACT
US 97 Both Directions - Tuesday, Sept. 18 to the morning of Wednesday, Sept. 19:
Both directions of US 97, between the SR 14/US 97 interchange (SR 14 - milepost 100.6 and US 97 - 0.17) and Hoctor Road (milepost 9.32) will close intermittently with flaggers, overnight, from 10 p.m. to 4 a.m., for transporting a windmill transformer. Last Updated: 9/14/2018 1:37 PM More Info
From milepost 0 to milepost 10
HIGH IMPACT
US 97 Both Directions - Monday, Sept. 17 to the morning of Tuesday, Sept. 18: Both directions of US 97 between the SR 14/US 97 interchange (milepost 100.6) and Toppenish (milepost 57.0) will close intermittently with flaggers, overnight, from 10 p.m. to 4 a.m., for transporting a windmill transformer. Last Updated: 9/14/2018 1:35 PM More Info
From milepost 57 to milepost 77
HIGH IMPACT
SR 14 Eastbound - Monday, Sept. 17 to the morning of Tuesday, Sept. 18: Eastbound SR 14 between Dallesport (milepost 84.0) and the SR 14/US 97 interchange (milepost 100.6) will close intermittently with flaggers overnight, from 10 p.m. to 4 a.m., for transporting a windmill transformer. Last Updated: 9/14/2018 1:34 PM More Info
From milepost 82 to milepost 101
HIGH IMPACT
SR 14 Both Directions - Monday, Sept. 17 to the morning of Tuesday, Sept. 18:
Both directions of SR 14 between Roosevelt (milepost 133.0) and the SR 14/US 97 interchange (milepost 100.6) will close overnight from 10 p.m. to 4 a.m., for transporting a windmill transformer. Last Updated: 9/14/2018 1:33 PM More Info
From milepost 134 to milepost 101
HIGH IMPACT
SR 14 Both Directions - Saturday, Sept. 15: The Bridge of the Gods on SR 14 (milepost 41.55) will be closed to traffic from 7:30-8 a.m., for the Bridge of the Goddess Half Marathon. Last Updated: 9/14/2018 1:31 PM More Info
From milepost 42 to milepost 42
HIGH IMPACT
I-5 Both Directions - Courtesy of ODOT:
Saturday, Sept. 15 to the morning of Friday, Sept. 21: Travelers on both directions of I-5 between the Interstate Bridge and the Moda Center, should expect intermittent single-lane and ramp closures, nightly, from 8 p.m. to 5 a.m., for paving work. Last Updated: 9/14/2018 1:29 PM More Info
At milepost 0
HIGH IMPACT
I-205 Both Directions - Courtesy of ODOT:
Saturday, Sept. 15 to the morning of Saturday, Sept. 22: Up to two lanes on both directions of I-205 between the Glenn Jackson Bridge and Glisan Street, will close nightly, from 8 p.m. to 5:30 a.m., for paving work. Last Updated: 9/14/2018 1:20 PM More Info
At milepost 27
HIGH IMPACT
US 395 Both Directions - Motorists should expect construction delays. Last Updated: 9/13/2018 11:52 AM More Info
From milepost 179 to milepost 181
HIGH IMPACT
I-90 Westbound - Schoessler Interchange: Effective Monday, September 10, all overheight loads must exit at the Sprague Rest Area between 8:00 AM and 3:00 PM, due to a ramp closure for pavement repair. There is no detour available. Last Updated: 8/30/2018 12:04 PM More Info
From milepost 227 to milepost 227
HIGH IMPACT
I-90 Westbound - Tokio Interchange: Effective Monday, September 10, all overheight loads must exit at the Sprague Rest Area between 8:00 AM and 3:00 PM, due to a ramp closure for pavement repair. There is no detour available. Last Updated: 8/30/2018 12:03 PM More Info
From milepost 231 to milepost 231
HIGH IMPACT
SR 4 Both Directions - Beginning Monday, Aug 27, 2018: Travelers on both directions of SR 4 near Stella will alternate through a single lane, around-the-clock, for slope restoration and fence replacement work.
Daytime intermittent full roadway closures of 20 to 30 minutes may be needed, while crews remove large rocks off the hillside.
Use caution and slow down through the work zone.
NOTE: The speed limit through this area has been reduced to 25 mph. Last Updated: 8/24/2018 2:31 PM More Info
From milepost 49 to milepost 51
HIGH IMPACT
SR 409 Both Directions - Beginning Monday, June 25 until further notice: Traffic on both directions of the SR 409 Puget Island Bridge will alternate through a single lane around-the-clock for bridge painting and deck repair work. No overwidth loads permitted across the bridge during the single-lane closure.
Beginning Monday, July 30 until further notice: Full overnight bridge closures are possible Sunday through Thursday nights, from 9 p.m. to 5 a.m. Last Updated: 8/5/2018 4:52 PM More Info
From milepost 3 to milepost 4
HIGH IMPACT
US 12 Both Directions - Crews are replacing a culvert under US 12 west of Devonshire Rd near Montesano. Beginning July 23, drivers will encounter a traffic shift through the work zone. The highway will be reduced from four lanes to two and the speed lowered from 60 mph to 25 mph around the clock through late fall. Check the project web page for additional information. Last Updated: 7/18/2018 2:06 PM More Info
From milepost 9 to milepost 10
HIGH IMPACT
I-5 Southbound - Beginning Tuesday, May 29, until further notice: A single-lane of southbound I-5, between Todd Road and milepost 25, will be closed around-the-clock, for paving and bridge work. The speed limit through the work zone has been reduced to 60 mph. All southbound lanes of I-5 have been shifted through the work zone, there are no lane changes allowed through this area. The work is weather dependent. Last Updated: 6/22/2018 11:55 AM More Info
From milepost 28 to milepost 26
HIGH IMPACT
I-5 Both Directions - Wednesday, Sept. 19 – A Sounders game against Philadelphia that begins at 7:30 p.m. at CenturyLink Field will cause additional congestion on highways leading into Seattle, including I-5, I-90, SR 520 and SR 99. Last Updated: 1/16/2018 6:01 AM More Info
From milepost 162 to milepost 173
HIGH IMPACT
SR 504 Both Directions - Beginning Monday, Oct. 30, until further notice: Traffic on both directions of SR 504, near Wooster Creek at milepost 17.0, will be shifted to a temporary single-lane, by-pass route, controlled by an automated traffic signal, around-the-clock, during construction. NOTE: Users of the highway will need to watch for advanced signs notifying them of the single-lane detour ahead. NOTE: All work is weather dependent. Last Updated: 12/8/2017 12:27 PM More Info
From milepost 17 to milepost 18
HIGH IMPACT
SR 105 Both Directions - Beginning Monday, Sept. 18, until further notice: A single lane of the highway is closed between Eagle Hill Road and Panoramic Lane, around-the-clock, for erosion protection work.
NOTE: The speed limit has been reduced to 25 mph through this area. Last Updated: 11/21/2017 2:12 PM More Info
From milepost 19 to milepost 21
MODERATE IMPACT
SR 432 Eastbound - Construction on SR 432 eastbound at milepost 9.6 near Dike Road has the left lane closed beginning at 10:20 pm on September 19, 2018 until further notice. Last Updated: 9/19/2018 10:22 PM More Info
At milepost 10
MODERATE IMPACT
SR 503 Both Directions - Construction on SR 503 both directions at milepost 1.6 near 95th Street has the right lane closed beginning at 9:41 pm on September 19, 2018 until further notice. Last Updated: 9/19/2018 9:42 PM More Info
At milepost 2
MODERATE IMPACT
I-5 Southbound - Construction on I-5 southbound at milepost 35.8 near Owl Creek to milepost 28 near Todd Road, the left and center lane are closed beginning at 9:06 pm on September 19, 2018 until further notice. Last Updated: 9/19/2018 9:08 PM More Info
At milepost 36
MODERATE IMPACT
SR 409 Both Directions - Bridge work on SR 409 both directions at milepost 3.2 near Columbia River all lanes are closed beginning at 9:03 pm on September 19, 2018 until further notice. Last Updated: 9/19/2018 9:04 PM More Info
At milepost 3
MODERATE IMPACT
SR 6 Westbound - Construction on SR 6 westbound at milepost 4.4 near Camp One Road the right lane is closed beginning at 7:02 pm on September 19, 2018 until further notice. Last Updated: 9/19/2018 7:03 PM More Info
At milepost 4
MODERATE IMPACT
SR 92 Both Directions - Wednesday, Sept. 19: Traffic will alternate on SR 92 between North Machias Road and 44th Street Northeast from 8 p.m. to midnight. Last Updated: 9/19/2018 4:14 PM More Info
From milepost 3 to milepost 3
MODERATE IMPACT
I-90 Both Directions - I-90 North Bend to Vantage Bridge: Lane closures this week for construction activity 24/7 from North Bend to Denny Creek. Plan for added travel time. Night time lane closures east of Snoqualmie Pass. Maintenance work will require lane closures west of Ellensburg, Easton, Cle Elum, and Vantage vicinities. Last Updated: 9/19/2018 4:12 PM More Info
From milepost 34 to milepost 137
MODERATE IMPACT
US 12 Both Directions - US-12 milepost 158 to 167, both directions, east of White Pass: Friday, Sept. 21 at 6 A.M. US- 12 will be closed. The Tieton Reservoir Rd. will be utilized for a detour route. Full closure will be from Friday, Sept. 21 to Sunday, Oct. 7. Last Updated: 9/19/2018 4:08 PM More Info
From milepost 158 to milepost 167
MODERATE IMPACT
SR 520 Eastbound - Monday, Sept. 17, to the morning of Saturday, Sept. 22 - The eastbound SR 520 off-ramp to 148th Avenue Northeast will be closed from 10 p.m. to 5 a.m. nightly. Last Updated: 9/19/2018 3:38 PM More Info
At milepost 9
LOW IMPACT
I-90 Eastbound - Monday, Sept. 17 to Friday, Sept. 21 - The Rainier Avenue on-ramp to eastbound I-90 will be closed from 10 a.m. to 2 p.m. daily. Last Updated: 9/19/2018 3:25 PM More Info
At milepost 3
LOW IMPACT
I-90 Eastbound - Monday, Sept. 17 to Friday, Sept. 21 - The eastbound I-90 HOV off-ramp to Island Crest Way will be closed from 9 a.m. to 3 p.m. daily. Last Updated: 9/19/2018 3:23 PM More Info
At milepost 7
LOW IMPACT
I-90 Westbound - Monday, Sept. 17 to Friday, Sept. 21 - The Island Crest Way HOV on-ramp to westbound I-90 will be closed from 9 a.m. to 3 p.m. daily. Last Updated: 9/19/2018 3:23 PM More Info
At milepost 7
MODERATE IMPACT
I-5 Northbound - Sunday, Sept. 16, to the morning of Friday, Sept. 21 - The left lane of the northbound I-5 CD at the Dearborn ramp will be closed with a traffic shift from 9 p.m. to 5 a.m. nightly. Last Updated: 9/19/2018 3:13 PM More Info
At milepost 164
LOW IMPACT
SR 531 Both Directions - Wednesday, Sept. 19, to the evening of Thursday, Sept. 20 - A single lane in either direction of SR 531 between Lake Goodwin Road and 11th Avenue Northeast will be closed from 7 a.m. to 7 p.m. daily. Last Updated: 9/19/2018 11:49 AM More Info
From milepost 0 to milepost 6
MODERATE IMPACT
SR 202 Both Directions - Wednesday, Sept. 19, to the morning of Thursday, Sept. 20 - Two lanes eastbound and one lane westbound on SR 202 between SR 522 and NE 177th Street will be closed from 7 p.m. to 6 a.m. Last Updated: 9/17/2018 3:49 PM More Info
From milepost 0 to milepost 1
MODERATE IMPACT
SR 18 Westbound - Wednesday, Sept. 19, to the morning of Friday, Sept. 21 - The westbound SR 18 ramp to northbound SR 167 and westbound West Valley will be closed from 10 p.m. to 4:30 a.m. nightly. Last Updated: 9/17/2018 3:47 PM More Info
From milepost 3 to milepost 3
MODERATE IMPACT
SR 18 Westbound - Monday, Sept. 17, to the morning of Friday, Sept. 21 - The westbound West Valley ramp to westbound SR 18 will be closed from 9 p.m. to 5 a.m. nightly. Last Updated: 9/17/2018 3:46 PM More Info
At milepost 3
MODERATE IMPACT
SR 167 Southbound - * Monday, Sept. 17, to the morning of Friday, Sept. 21 – The southbound SR 167 ramp to northbound I-405 will be closed nightly from 10 p.m. to 4:30 a.m. A signed detour will be in place. Last Updated: 9/17/2018 3:12 PM More Info
At milepost 26
MODERATE IMPACT
I-405 Southbound - * Monday, Sept. 17, to the morning of Friday, Sept. 21 – The southbound I-405 off-ramp to southbound SR 167/Rainier Avenue South will be closed nightly from 10 p.m. to 4:30 a.m. A signed detour will be in place. Last Updated: 9/17/2018 3:11 PM More Info
At milepost 2
MODERATE IMPACT
I-405 Southbound - * Monday, Sept. 17, to the morning of Friday, Sept. 21 – The southbound I-405 off-ramp to southbound SR 167/Rainier Avenue South will be closed nightly from 10 p.m. to 4:30 a.m. A signed detour will be in place. Last Updated: 9/17/2018 3:09 PM More Info
At milepost 2
MODERATE IMPACT
SR 167 Northbound - * Monday, Sept. 17, to the morning of Friday, Sept. 21 – The northbound SR 167 ramp to northbound I-405 will be closed nightly from 10 p.m. to 4:30 a.m. A signed detour will be in place. Last Updated: 9/17/2018 3:06 PM More Info
At milepost 26
MODERATE IMPACT
I-405 Northbound - * Monday, Sept. 17, to the morning of Friday, Sept. 21 – The northbound I-405 off-ramp to northbound SR 167 will be closed nightly from 10 p.m. to 4:30 a.m. A signed detour will be in place. Last Updated: 9/17/2018 3:04 PM More Info
At milepost 2
MODERATE IMPACT
I-405 Northbound - * Monday, Sept. 17, to the morning of Friday, Sept. 21 – The northbound I-405 off-ramp to southbound SR 167 will be closed nightly from 10 p.m. to 4:30 a.m. A signed detour will be in place. Last Updated: 9/17/2018 3:03 PM More Info
At milepost 2
MODERATE IMPACT
I-5 Southbound - Monday, Sept. 17, to the morning of Friday, Sept. 21 - Two lanes of southbound I-5 between Corson and South Holgate Street will be closed from 9 p.m. to 5 a.m. nightly. Last Updated: 9/17/2018 2:35 PM More Info
From milepost 162 to milepost 164
MODERATE IMPACT
I-5 Northbound - Wednesday, Sept. 19, to the morning of Thursday, Sept. 20 - The I-405 HOV on-ramp to northbound I-5 will be closed from 9 p.m. to 5 a.m. Last Updated: 9/17/2018 1:47 PM More Info
At milepost 155
MODERATE IMPACT
I-90 Westbound - On I-90 westbound from SR 18 (MP 25) to just east of Jones Rd the left lane is closed due to roadwork. Last Updated: 9/17/2018 12:28 PM More Info
At milepost 25
MODERATE IMPACT
I-5 Northbound - Tuesday, Sept. 18, to the morning of Thursday, Sept. 20 - The northbound I-5 ramp to 116th Street Northeast will be closed from 10 p.m. to 6 a.m. nightly. This work is weather dependent. Last Updated: 9/17/2018 11:56 AM More Info
At milepost 202
MODERATE IMPACT
I-5 Northbound - Monday, Sept. 17, to the morning of Friday, Sept. 21 - The right lane of northbound I-5 between 88th Street Northeast and 136th Street will be closed from 8 p.m. to 9 a.m. nightly. This work is weather dependent. Last Updated: 9/17/2018 11:54 AM More Info
From milepost 200 to milepost 204
MODERATE IMPACT
I-5 Southbound - Monday, Sept. 17, to the morning of Friday, Sept. 21 - Up to two lanes of southbound I-5 between the Ebey Slough Bridge and King Thompson Road will be closed starting at 7 p.m. nightly. All lanes will reopen by 4:45 a.m. daily. This work is weather dependent. Last Updated: 9/17/2018 11:50 AM More Info
From milepost 198 to milepost 208
MODERATE IMPACT
SR 99 Both Directions - Monday, Sep. 17, to the morning of Friday, Sep. 21 – Traffic will be reduced to one lane in both directions of the SR 99 Aurora Bridge between Bridge Way North and Ray Street from 9 p.m. to 5 a.m. nightly. Last Updated: 9/17/2018 11:44 AM More Info
At milepost 34
MODERATE IMPACT
SR 99 Northbound - Wednesday, Sept. 19, to the morning of Friday, Sept. 21 - Two lanes of northbound SR 99 between North 50th Street and North 67th Street will be closed from 7 p.m. to 5 a.m. nightly. Last Updated: 9/17/2018 11:43 AM More Info
From milepost 35 to milepost 38
LOW IMPACT
SR 99 Both Directions - Wednesday, Sept. 19, to the afternoon of Thursday, Sept. 20 - The Business Access and Transit (BAT) lane in both directions of SR 99 between North 135th Street and North 145th Street will be closed from 9 a.m. to 3 p.m. daily. Last Updated: 9/17/2018 11:42 AM More Info
From milepost 38 to milepost 41
LOW IMPACT
SR 527 Southbound - Monday, Sept. 17, to the afternoon of Friday, Sept. 21 - The right lane of southbound SR 527 between 15th Avenue Southeast and 183rd Street Southeast will be closed from 7 a.m. to 3 p.m. daily. Last Updated: 9/14/2018 5:36 PM More Info
From milepost 6 to milepost 6
LOW IMPACT
SR 527 Southbound - Monday, Sept. 17, to the afternoon of Friday, Sept. 21 - The right lane of southbound SR 527 between 151st Street Southeast and 156th Street Southeast will be closed from 7 a.m. to 3 p.m. daily. Last Updated: 9/14/2018 5:34 PM More Info
From milepost 8 to milepost 7
LOW IMPACT
SR 527 Northbound - Monday, Sept. 17, to the afternoon of Friday, Sept. 21 - The right lane of northbound SR 527 between 217th Place Southeast and Canyon Park will be closed from 7 a.m. to 3 p.m. daily. Last Updated: 9/14/2018 5:32 PM More Info
From milepost 3 to milepost 3
LOW IMPACT
SR 527 Southbound - Monday, Sept. 17, to the afternoon of Friday, Sept. 21 - The right lane of southbound SR 527 between 192nd Street Southeast and 201st Place Southeast will be closed from 7 a.m. to 3 p.m. daily. Last Updated: 9/14/2018 5:30 PM More Info
From milepost 5 to milepost 5
MODERATE IMPACT
SR 527 Northbound - Sunday, Sept. 16, to the morning of Friday, Sept. 21 - The right lane of northbound SR 527 between 217th Place Southeast and Canyon Park will be closed from 7 p.m. to 5 a.m. nightly. Last Updated: 9/14/2018 5:28 PM More Info
From milepost 3 to milepost 3
MODERATE IMPACT
SR 527 Southbound - Sunday, Sept. 16, to the morning of Friday, Sept. 21 - The right lane of southbound SR 527 between 192nd Street Southeast and 201st Place Southeast will be closed from 7 p.m. to 5 a.m. nightly. Last Updated: 9/14/2018 5:26 PM More Info
From milepost 5 to milepost 5
MODERATE IMPACT
SR 96 Westbound - Sunday, Sept. 16, to the morning of Friday, Sept. 21 - Two lanes and a left turn lane on westbound SR 96 between SR 527 and Seattle Hill Road will be closed from 9 p.m. to 5 a.m. nightly. Last Updated: 9/14/2018 5:07 PM More Info
From milepost 1 to milepost 4
MODERATE IMPACT
SR 99 Both Directions - Sunday, Sept. 16, to the morning of Friday, Sept. 21 - A single lane in both directions of SR 99 between South Director Street and East Marginal Way will be closed from 8 p.m. to 5 a.m. Last Updated: 9/14/2018 4:53 PM More Info
From milepost 25 to milepost 28
MODERATE IMPACT
SR 410 Both Directions - Saturday, Sept. 15, to the morning of Friday, Sept. 21 - Crews will alternate eastbound and westbound SR 410 traffic at White River Bridge from 8 p.m. to 5 a.m. nightly. Last Updated: 9/14/2018 4:43 PM More Info
At milepost 22
MODERATE IMPACT
SR 285 Both Directions - On SR 285 through Wenatchee Sunday through Thursday NIGHTS, 7:30 p.m. to 6:30 a.m., expect single and multi-lane closures on Mission St. and N. Wenatchee Ave. and some side streets.
Crews are paving Mission St. from 2nd St. to Miller.
Pavement grinding continues on Mission from Bridge St. to Kittitas.
Sidewalk and curb ramp work continues from Kittitas to 2nd.
Expect traffic signal work between Kittitas and 1st St.
Expect to see paint line spotting showing up throughout project limits. Last Updated: 9/14/2018 3:59 PM More Info
From milepost 1 to milepost 5
MODERATE IMPACT
SR 153 Both Directions - On SR 153 between Methow and Carlton Monday through Thursday 7 a.m. to 7 p.m. expect no delays for the under deck rehabilitation work on columns under the 5 bridges. Last Updated: 9/14/2018 3:57 PM More Info
From milepost 13 to milepost 23
MODERATE IMPACT
SR 4 Both Directions - Saturday, Sept. 15 to Thursday, Sept. 20: Travelers on both directions of SR 4, between County Line Park and Mill Creek Road will be alternated through a single-lane with flaggers, daily, from 7:30 a.m. to 3 p.m., for slide debris removal. Last Updated: 9/14/2018 3:44 PM More Info
From milepost 45 to milepost 48
MODERATE IMPACT
SR 20 Both Directions - Monday, Sept. 17, through Friday, Sept. 21 - Crews will close lanes nightly from 7 p.m. to 6 a.m. and daily from 9 a.m. to 3 p.m. near Sharpes and Howard's corners for striping, landscaping and signage work. Flaggers will help direct drivers through the open lanes. Last Updated: 9/14/2018 3:36 PM More Info
From milepost 47 to milepost 49
MODERATE IMPACT
I-5 Northbound - Tuesday, Sept. 18 to the morning of Friday, Sept. 21: Up to two lanes of northbound I-5 between Todd Road and the weigh station (milepost 44), will close nightly from 10 p.m. to 5 a.m. for paving work. NOTE: The speed limit through the work zone has been reduced to 50 mph. Travelers should use caution and slow down through the work zone. Last Updated: 9/14/2018 3:35 PM More Info
From milepost 28 to milepost 44
MODERATE IMPACT
I-5 Northbound - Sunday, Sept. 16, to the morning of Friday, Sept. 21 - Up to four lanes of northbound I-5 between SR 900 and Albro Place will be closed from 8 p.m. to 5 a.m. nightly. Last Updated: 9/14/2018 2:08 PM More Info
From milepost 157 to milepost 162
MODERATE IMPACT
SR 520 Eastbound - Monday, Sept. 17, to the morning of Friday, Sept. 21 - One right lane of eastbound SR 520 before Northeast 40th Street will be closed from 9 p.m. to 5 a.m. nightly. Last Updated: 9/14/2018 1:48 PM More Info
From milepost 9 to milepost 11
LOW IMPACT
I-5 Southbound - Monday, Sept. 17, to the morning of Friday, Sept. 21 - Up to three lanes of southbound I-5 between Mercer Street and I-90 will be closed from 11 p.m. to 5 a.m. nightly. Last Updated: 9/14/2018 1:35 PM More Info
From milepost 167 to milepost 164
MODERATE IMPACT
SR 500 Both Directions - Monday, Sept. 17 to Friday, Sept. 21: Travelers on both directions of SR 500 between Northeast Lake Road and Northeast 3rd Avenue will be flagged through a single lane, with a pilot car, from 7 a.m. to 7 p.m., for pavement repair and highway reconfiguration work.
NOTE: During construction, travelers should expect delays of up to 20 minutes, throughout the construction zone.
NOTE: All work is weather dependent. Last Updated: 9/14/2018 1:22 PM More Info
From milepost 18 to milepost 20
MODERATE IMPACT
SR 503 Both Directions - Monday, Sept. 17 to Friday, Sept. 21: Travelers on both directions of SR 503/SR 503 Spur between Northeast Rock Creek Road and Williams Road will alternate through a single lane, with flaggers and a pilot car, daily from 6:30 a.m. to 7 p.m., for chip sealing and paving work.
NOTE: All work is weather dependent. Last Updated: 9/14/2018 1:21 PM More Info
From milepost 14 to milepost 31
MODERATE IMPACT
I-5 Northbound - Monday, Sept. 17, to the morning of Saturday, Sept. 22 - Two right lanes of northbound I-5 between South 272nd Street and Sea-Tac Airport/Burien will be closed from 9 p.m. to 5 a.m. nightly. Last Updated: 9/14/2018 1:09 PM More Info
From milepost 147 to milepost 154
MODERATE IMPACT
I-90 Eastbound - Monday, Sept. 17, to the morning of Friday, Sept. 21 - A single lane of eastbound I-90 between the Raging River Bridge and SR 18 will be closed from 8 p.m. to 1:30 p.m. nightly/daily. Last Updated: 9/14/2018 12:50 PM More Info
From milepost 23 to milepost 26
LOW IMPACT
I-90 Westbound - Monday, Sept. 17, to Friday, Sept. 21 - A single lane of westbound I-90 between Bellevue Way and East Mercer Way will be closed from 7 to 10 p.m. nightly. Last Updated: 9/14/2018 12:41 PM More Info
From milepost 9 to milepost 9
MODERATE IMPACT
I-5 Northbound - Monday, Sept. 17, to the morning of Friday, Sept. 21 - The three left lanes of northbound I-5 between Denny Way and SR 520 will be closed from 9 p.m. to 5 a.m. nightly. Last Updated: 9/14/2018 12:10 PM More Info
From milepost 166 to milepost 168
MODERATE IMPACT
I-5 Northbound - Monday, Sept. 17, to the morning of Friday, Sept. 21 - The three left lanes of northbound I-5 between the University Street on-ramp and the Mercer Street off-ramp will be closed from 9 p.m. to 5 a.m. nightly. Last Updated: 9/14/2018 12:10 PM More Info
From milepost 166 to milepost 168
MODERATE IMPACT
SR 290 Both Directions - Daytime work with lane closures and nighttime work for paving between 6 pm and 6 am. Last Updated: 9/13/2018 11:56 AM More Info
From milepost 1 to milepost 4
MODERATE IMPACT
US 195 Both Directions - Possible short term lane restrictions on US 195 both directions from milepost 49.8 near McMeekin Rd to milepost 72.2 near MP Marker 72. Potential shoulder and lane closures may be in place during work hours. Last Updated: 9/13/2018 11:55 AM More Info
From milepost 50 to milepost 73
MODERATE IMPACT
I-405 Southbound - Sunday, Sept. 16, to the morning of Friday, Sept. 21 - The southbound I-405 HOV ramp to westbound I-90 will be closed from 8 p.m. to 5 a.m. nightly. Last Updated: 9/10/2018 7:54 AM More Info
At milepost 11
MODERATE IMPACT
I-90 Eastbound - Wednesday, Sept. 19, to the morning of Friday, Sept. 21 - The eastbound I-90 HOV ramp to northbound I-405 will be closed from 8 p.m. to 5 a.m. nightly. Last Updated: 9/10/2018 7:52 AM More Info
At milepost 10
MODERATE IMPACT
SR 410 Both Directions - Saturday, Sept. 15, to the morning of Friday, Sept. 21 - Crews will alternate eastbound and westbound traffic at White River Bridge from 8 p.m. to 5 a.m. nightly. Last Updated: 9/7/2018 1:51 PM More Info
At milepost 22
MODERATE IMPACT
I-90 Westbound - Construction continues on the Hamilton/SR290 on-ramp to WB 90. The on-ramp is closed until further notice. Travelers will have several detour options to access westbound I-90 from Hamilton during this closure, though some depend on vehicle height. Last Updated: 8/9/2018 4:31 PM More Info
At milepost 282
MODERATE IMPACT
SR 508 Both Directions - Beginning Tuesday, April 24, 2018, until further notice: Travelers on both directions of SR 508, between Centralia Alpha Road and Kearney Creek, traffic will alternate through a single lane, around-the-clock, using a temporary traffic signal, for bridge replacement work.
NOTE: All work is weather dependent. Last Updated: 7/30/2018 11:25 AM More Info
From milepost 13 to milepost 14
MODERATE IMPACT
US 101 Both Directions - Beginning Wednesday, July 25 until further notice: The signal at the US 101 and SR 6 intersection will be removed, and travelers will be flagged through the intersection, around-the-clock, for roundabout construction work.
NOTE: During construction, travelers passing through the work zone should anticipate delays of us to 20 minutes.
NOTE: All work is weather dependent. Last Updated: 7/30/2018 11:19 AM More Info
From milepost 58 to milepost 59
MODERATE IMPACT
SR 21 Both Directions - Construction on SR 21 both directions from milepost 24.2 near Lind-Ralston Rd to milepost 37.9 I-90 until further notice. Roadway users should expect delays and be alert for flaggers and or pilot cars directing single-lane, alternating traffic with some delays when work is underway. Last Updated: 7/26/2018 5:01 PM More Info
From milepost 24 to milepost 38
MODERATE IMPACT
US 2 Both Directions - Construction on US 2 both directions from milepost 297.0 near Deer Rd to milepost 299.9 near Colbert Rd. Roadway users should be alert for possible lane restrictions during non-commute hours, Monday through Friday. Last Updated: 7/26/2018 4:55 PM More Info
From milepost 297 to milepost 300
MODERATE IMPACT
US 395 Both Directions - Construction on US 395 both directions from milepost 190.3 near R063 0 to milepost 206.7 near Chewelah us underway until further notice. Daytime work with lane closures. Last Updated: 7/23/2018 3:51 PM More Info
From milepost 190 to milepost 207
MODERATE IMPACT
SR 112 Both Directions - A one lane detour is in place controlled by a temporary signal around-the-clock through late fall. Crews will remove and replace a culvert under SR 112 near Olsen Creek. All work will take place during the daytime hours each Monday through Saturday. Check the project web page for additional information. Last Updated: 7/17/2018 4:28 PM More Info
From milepost 7 to milepost 8
MODERATE IMPACT
Mission Av Both Directions - Mission Ave will be closed from Flora Rd to Barker Rd for road work beginning June 20, 2018 until October 31, 2018. Select alternate route. Last Updated: 6/29/2018 8:20 AM More Info

MODERATE IMPACT
US 101 Both Directions - US 101 near Lake Crescent is reduced to one alternating lane of traffic controlled by flaggers when contractors are present. Expect delays of up to 30 minutes. Last Updated: 6/19/2018 4:24 PM More Info
From milepost 228 to milepost 230
MODERATE IMPACT
SR 8 Both Directions - SR 8 in the McCleary area is reduced to one lane in each direction around the clock until spring 2019 for a fish barrier removal project. The speed limit is also reduced from 60 mph to 45 mph. Check the project web page for additional information. Last Updated: 4/1/2018 5:29 PM More Info
From milepost 4 to milepost 7
MODERATE IMPACT
SR 108 Both Directions - The intersection of SR 8 and SR 108 in McCleary is closed to all traffic around the clock through spring 2019. During the closure, drivers will be directed to the Mox Chehalis Road interchange. Check the project web page for additional information. Last Updated: 3/29/2018 2:55 PM More Info
At milepost 0
MODERATE IMPACT
SR 21 Both Directions - SR 21 milepost 145.5 at Gold Creek, 17 miles south of Republic has a one-lane bridge with a 10 mile per hour speed limit until further notice. Follow traffic control in place and yield to on-coming traffic. Last Updated: 11/28/2017 10:08 AM More Info
At milepost 146
LOW IMPACT
I-82 Both Directions - I-82 milepost 132 Columbia River Bridge near Plymouth: Eastbound traffic is shifted to the westbound Columbia River bridge into Oregon. The speed limit is reduced to 40 mph. Westbound traffic is reduced to a single lane. Last Updated: 9/19/2018 4:12 PM More Info
At milepost 132
LOW IMPACT
US 12 Both Directions - US-12 MP 198 Nelson Bridges, west of Yakima: Traffic will be reduced to a single lane in both directions seven days a weeks, 24 hours a day, through Sept. 28. Traffic should anticipate minor delays. Last Updated: 9/19/2018 4:12 PM More Info
At milepost 198
LOW IMPACT
US 730 Both Directions - US-730 milepost 1 just north of the Oregon State Line: Monday Sept. 17 through Friday Sept. 21 between 7 a.m. and 5 p.m. Drivers will experience piloted single lane closures. Last Updated: 9/19/2018 4:11 PM More Info
From milepost 0 to milepost 2
LOW IMPACT
I-90 Eastbound - I-90 eastbound Ryegrass rest area milepost 126 will be closed to combination vehicles on Thursday, Sept. 20 from 6 AM to 6 PM to replace guardrail posts. The equipment being used will block half of the ramps to and from the rest area. Last Updated: 9/19/2018 4:11 PM More Info
At milepost 126
LOW IMPACT
US 395 Both Directions - US-395 Yelm St. milepost 17 to 18: Monday evening Sept. 17 at 7 p.m. through Friday morning Sept. 21 at 9 a.m. There will be single lane closures nightly for sidewalk upgrades. Last Updated: 9/19/2018 4:10 PM More Info
At milepost 17
LOW IMPACT
SR 22 Both Directions - SR-22 MP 25 to MP 36: Monday Sept. 17 through Thursday Sept. 20 from 7 a.m. to 4 p.m. Crews will be placing centerline rumble strips and fog seal. Piloted 1 lane closures will be in effect. Last Updated: 9/19/2018 4:10 PM More Info
From milepost 25 to milepost 36
LOW IMPACT
I-182 Eastbound - I-182 mileposts 7 to 13: Thursday, Sept. 20 from 9 p.m. to Friday, Sept. 21 at 5 a.m. The I-182 and 20th Street eastbound off-Ramp will be reduced to a single lane with a full closure possible after 11 p.m. for electrical work. Last Updated: 9/19/2018 4:09 PM More Info
From milepost 7 to milepost 13
LOW IMPACT
US 12 Both Directions - US-12 MP 138 to MP 166 in both directions: Wednesday Sept. 19 and Thursday Sept. 20 from 6:30 a.m. to 4 p.m. WSDOT crews will be inspecting and cleaning culverts along the highway shoulders. Shoulder work zones, minimal impacts anticipated. Last Updated: 9/19/2018 4:09 PM More Info
From milepost 138 to milepost 166
LOW IMPACT
US 12 Both Directions - US-12 milepost 328 to 340 in both directions: Monday Sept. 17 to Friday Sept. 21 during daylight hours traffic will be reduced to a single lane. Minimal impacts are anticipated. Last Updated: 9/19/2018 4:08 PM More Info
From milepost 328 to milepost 340
LOW IMPACT
I-82 Both Directions - I-82 milepost 69 to 73 both directions, Monday Sept 17 to Thursday Sept 20 from 7 a.m. to 4 p.m. crews will be pavement sealing the roadway. Expect one lane closures to be in effect. Last Updated: 9/19/2018 4:08 PM More Info
From milepost 69 to milepost 73
LOW IMPACT
I-182 Both Directions - I-182 milepost 4 to 5 at SR-240, George Washington Way Vicinity: Monday evening Sept. 17 at 7 p.m. through Friday morning Sept. 21 at 9 a.m. there will be single lane and ramp closures for striping work. Last Updated: 9/19/2018 4:07 PM More Info
From milepost 4 to milepost 5
LOW IMPACT
SR 128 Both Directions - SR-128 Snake River Red Wolf Bridge: Monday Sept. 17 – Friday, Sept. 21 from 6 a.m. to 6 p.m. daily the bridge will be reduced to a single lane. Last Updated: 9/19/2018 4:07 PM More Info
At milepost 0
LOW IMPACT
US 12 Both Directions - US-12 MP 142 to MP 189, both directions from 7 a.m. to 4 p.m. Monday Sept 17 through Thursday Sept 20 crews will be placing fog seal and performing other miscellaneous work. Piloted 1-lane closures will be in effect. Last Updated: 9/19/2018 4:06 PM More Info
From milepost 142 to milepost 189
LOW IMPACT
SR 432 Eastbound - Monday, Sept. 17 to the morning of Friday, Sept. 21: A single lane on eastbound SR 432/Cowlitz River Bridge will close nightly from 7 p.m. to 9 a.m. for bridge painting work. During the closure, crews will intermittently close the Dike Road on-ramp to eastbound SR 432.
NOTE: All work is weather dependent. Last Updated: 9/17/2018 2:30 PM More Info
From milepost 10 to milepost 10
LOW IMPACT
SR 167 Southbound - Monday, Sept. 17, to the morning of Friday, Sept. 21 – Three lanes of southbound SR 167 between I-405 and South 180th Street will be closed nightly from midnight to 5 a.m. Last Updated: 9/17/2018 12:58 PM More Info
From milepost 26 to milepost 25
LOW IMPACT
SR 167 Southbound - Monday, Sept. 17, to the morning of Friday, Sept. 21 – Two lanes of southbound SR 167 between I-405 and South 180th Street will be closed nightly from 10 p.m. to 5 a.m. Last Updated: 9/17/2018 12:56 PM More Info
From milepost 26 to milepost 25
LOW IMPACT
I-405 Southbound - Monday, Sept. 17, to the morning of Friday, Sept. 21, and Sunday, Sept. 23, to the morning of Monday, Sept. 24 – Two lanes of southbound I-405 between the Benson Bridge and SR 167 will be closed nightly from 11 p.m. to 4 a.m. Last Updated: 9/17/2018 12:48 PM More Info
From milepost 3 to milepost 3
LOW IMPACT
I-405 Northbound - Monday, Sept. 17, to the morning of Friday, Sept. 21 – Three lanes of northbound I-405 between SR 167 and Talbot Road South will be closed nightly from midnight to 4:30 a.m. Last Updated: 9/17/2018 12:45 PM More Info
From milepost 2 to milepost 3
LOW IMPACT
I-405 Northbound - Monday, Sept. 17, to the morning of Friday, Sept. 21 – Two lanes of northbound I-405 between Talbot Road South and SR 900 will be closed nightly from midnight to 4:30 a.m. Last Updated: 9/17/2018 12:42 PM More Info
From milepost 3 to milepost 5
LOW IMPACT
SR 167 Northbound - Monday, Sept. 17, to the morning of Friday, Sept. 21 – Two lanes of northbound SR 167 between South 180th Street and I-405 will be closed nightly from 11 p.m. to 4:30 a.m. Last Updated: 9/17/2018 12:40 PM More Info
From milepost 24 to milepost 27
LOW IMPACT
US 97 Both Directions - US 97 over Blewett Pass is open. Finish work on the culvert replacement project continues. Expect some occasional lane closures as needed through the end of the month. Last Updated: 9/17/2018 11:30 AM More Info
From milepost 150 to milepost 185
LOW IMPACT
US 2 Eastbound - On US 2 at School Street Monday through Thursday NIGHTS, 8 p.m. to 6 a.m., expect the right lane to be closed where a Wenatchee City contractor is installing a sewer line in the right shoulder. Last Updated: 9/14/2018 4:06 PM More Info
From milepost 118 to milepost 118
LOW IMPACT
SR 14 Both Directions - Monday, Sept. 17 to Friday, Sept. 21: Travelers on both directions of SR 14 a half-mile east of Cape Horn will alternate through a single lane daily, from 7 a.m. to 5 p.m., for debris fence repair work. Last Updated: 9/14/2018 3:57 PM More Info
At milepost 25
LOW IMPACT
US 101 Both Directions - Monday, Sept. 17 to Friday, Sept. 21: Travelers on both directions of US 101 between Chinook Valley Road and Port of Willapa Road, will alternate through a single lane daily, from 6 a.m. to 6 p.m., for rumble strip installation work. Last Updated: 9/14/2018 3:56 PM More Info
From milepost 9 to milepost 58
LOW IMPACT
SR 4 Both Directions - Monday, Sept. 17 to Friday, Sept. 21: Travelers on both directions of SR 4 between the US 101/SR 4 intersection and Greenwood Road will alternate through a single lane daily, from 6 a.m. to 6 p.m., for rumble strip installation work. Last Updated: 9/14/2018 3:54 PM More Info
From milepost 0 to milepost 36
LOW IMPACT
SR 6 Both Directions - Monday, Sept. 17 to the morning of Sunday, Sept. 23: Travelers on both directions of SR 6, between Twin Oaks Road and Bunker Creek Road will be alternated through a single-lane with flaggers, nightly, from 7 p.m. to 6 a.m., for bridge work.
NOTE: All work is weather dependent.
NOTE: Travelers should expect delays of up to 20 minutes. Last Updated: 9/14/2018 3:47 PM More Info
From milepost 46 to milepost 47
LOW IMPACT
SR 433 Both Directions - Sunday, Sept. 16 to the morning of Friday, Sept. 21: Travelers on both directions of the SR 433/Lewis and Clark bridge will be alternated intermittently through a single lane, with flaggers, nightly, from 9 p.m. to 5 a.m., for utility inspection work along the bridge. Last Updated: 9/14/2018 3:42 PM More Info
From milepost 0 to milepost 0
LOW IMPACT
SR 503 Both Directions - Monday, Sept. 17 to Friday, Sept 21: Travelers on both directions of SR 503/SR 503 Spur between Northeast Rock Creek Road and Williams Road will alternate through a single lane, with flaggers and a pilot car, daily from 6:30 a.m. to 7 p.m., for chip sealing and paving work. NOTE: Travelers should expect delays of up to 20 minutes during construction on SR 503 and on the SR 503 Spur, and significantly longer delays on cross streets when paving occurs at the intersections. Last Updated: 9/14/2018 3:40 PM More Info
From milepost 14 to milepost 31
LOW IMPACT
SR 9 Both Directions - Monday, Sept. 17, through Wednesday, Sept. 19 - Crews will close one lane of SR 9 at Francis Road daily from 7 a.m. to 4 p.m. for light installation. Flaggers will alternate traffic through the open lane. Last Updated: 9/14/2018 3:31 PM More Info
At milepost 53
LOW IMPACT
SR 9 Both Directions - Monday, Sept. 17, through Friday, Sept. 21 - Crews could alternate traffic through SR 9 at milepost 48 between 7 a.m. and 5 p.m. Monday through Friday during fish passage improvement work. Flaggers will alternate traffic through the open lane. Last Updated: 9/14/2018 3:29 PM More Info
At milepost 48
LOW IMPACT
SR 548 Both Directions - Monday, Sept. 17, to Friday, Sept. 21 - Crews will close one lane at the intersection of SR 548 and Kickerville Road daily from 7 a.m. to 4 p.m. for landscaping and project cleanup work. Flaggers will alternate traffic through the open lane. Last Updated: 9/14/2018 3:26 PM More Info
At milepost 5
LOW IMPACT
SR 542 Both Directions - Monday, Sept. 17, through Friday, Sept. 21 - Crews will work on the Hedrick Creek fish passage project at milepost 32 on SR 542 from 7:30 a.m. to 4:30 p.m. Crews could close one lane of Mount Baker Highway during this work and have flaggers alternate traffic through the open lane. Last Updated: 9/14/2018 3:23 PM More Info
At milepost 32
LOW IMPACT
SR 503 Both Directions - Monday, Sept. 17 to the morning of Sunday, Sept. 23: Travelers on both directions of SR 503, between Northeast 87th Street and Northeast 95th Street will be shifted to a single-lane, nightly, from 6 p.m. to 5 a.m., for drainage replacement work.
NOTE: One lane in each direction will remain open.
NOTE: Pedestrians and cyclists should watch for advanced signage, and will be guided by traffic control to either the northbound or southbound side of the work zone, nightly, from 6 p.m. to 5 a.m. Last Updated: 9/14/2018 1:27 PM More Info
From milepost 1 to milepost 2
LOW IMPACT
SR 503 Both Directions - Monday, Sept. 17 to Friday, Sept. 21: Traffic on both directions of SR 503, between Northeast Caples Road and Northeast 154th Street, will be reduced to a single-lane, with flaggers, daily, from 6 a.m. to 6 p.m., for construction of bus/truck pullout lanes.
NOTE: During construction a single-lane on both directions of SR 503 will remain open through the work zone.
NOTE: All work is weather dependent. Last Updated: 9/14/2018 1:25 PM More Info
From milepost 4 to milepost 5
LOW IMPACT
Little Spokane Dr Northbound - Spokane County: Install County sewer on Little Spokane Drive from Little Spokane from Little Spokane Lane to Shady Slope Rd. Little Spokane Drive will be closed at shady slope Rd until the end of October 2018. Expect delays and use other routes. Last Updated: 9/11/2018 3:06 PM More Info

LOW IMPACT
Liberty Dr Northbound - Spokane County: Starting on September 12, 2018, the County will have lane closures for removing and replacing pavement. Watch for flaggers and be prepared to stop. This project is scheduled through the end of October.
Expect delays Last Updated: 9/11/2018 2:52 PM More Info

LOW IMPACT
Whitworth Dr Northbound - Spokane County: Starting on September 12, 2018, the County will have lane closures on Whitworth Dr. from Hawthorne Rd to Wall Street, for removing and replacing pavement. Watch for flaggers and be prepared to stop. This project is scheduled through the end of October.
Expect delays Last Updated: 9/11/2018 2:42 PM More Info

LOW IMPACT
Regal Rd Both Directions - Spokane County: Starting on September 12, 2018, the County will have lane closures for removing and replacing pavement. Watch for flaggers and be prepared to stop. This project is scheduled through the end of October.
Expect delays Last Updated: 9/11/2018 2:37 PM More Info

LOW IMPACT
Bigelow Gulch Rd Both Directions - Spokane County: Improvement of the Bigelow Gulch Corridor connecting Forker Road to Progress Road via a new alignment north of the existing intersection. Expect delays. No truck traffic, truck traffic violators will be ticketed.
This work is expected to continue through December 31, 2018. Last Updated: 9/4/2018 12:11 PM More Info

LOW IMPACT
SR 409 Both Directions - Beginning Monday, June 25 until further notice: Traffic on both directions of the SR 409 - Puget Island Bridge, will alternate through a single lane around-the-clock, with a temporary traffic signal. Last Updated: 8/24/2018 2:50 PM More Info
At milepost 3
LOW IMPACT
Sunset Both Directions - City of Spokane: Sunset Blvd is reduced to one lane in each direction from Royal to Lindeke Street for grinding and paving. Expect delays. Last Updated: 8/19/2018 6:38 PM More Info

LOW IMPACT
Sprague Westbound - City of Spokane: Sprague Ave is closed Westbound between Jefferson Street and Cedar Street for road work on the combined sewer overflow. Expect delays. Last Updated: 8/19/2018 6:23 PM More Info

LOW IMPACT
Sharp Both Directions - City Of Spokane: Sharp Avenue is closed between Ruby and Hamilton Street for road work beginning June 22 until further notice. Last Updated: 8/19/2018 6:16 PM More Info

LOW IMPACT
Spokane Falls Both Directions - City Of Spokane - Spokane Falls Boulevard closed for utility construction from Lincoln to Monroe Streets with a signed detour in place. Lincoln St access to River Park Square parking garage is open. Last Updated: 8/19/2018 3:34 PM More Info

LOW IMPACT
Martin Luther King Jr. Both Directions - City Of Spokane - MLK Jr. Way is closed from Pine to Sherman Street. A detour is in place for the U District Pedestrian Bridge Project until further notice. Last Updated: 8/19/2018 3:32 PM More Info

LOW IMPACT
Monroe Rd Both Directions - Spokane County: Starting on Monday, May 14, 2018, Monroe Road will be closed at Dragoon Creek for bridge replacement. Motorist should use other routes. This project is scheduled until Oct. 31st 2018. Last Updated: 8/19/2018 2:46 PM More Info

LOW IMPACT
Palouse Hy Northbound - Spokane County will have lane restrictions for road improvements including sidewalks, curb ramps, storm sewer, and landscaping. Please watch for flaggers, there will be delays. This project is schedule through the end of November 2018. Last Updated: 8/19/2018 2:41 PM More Info

LOW IMPACT
US 195 Both Directions - Drivers should be alert for lane restrictions with possible delays at 4 new passing lane construction locations between Steptoe and Plaza. Last Updated: 4/30/2018 8:20 AM More Info
From milepost 56 to milepost 72
LOW IMPACT
US 2 Both Directions - US 2 is reduced to one lane in each direction with slow traffic, congestion, and possible delays. Last Updated: 4/26/2018 10:56 AM More Info
From milepost 295 to milepost 296
LOWEST IMPACT
I-182 Both Directions - I-182 milepost 3, near Queensgate Drive: Monday Sept. 17 through Friday Sept. 21 nightly from 8 p.m. to 5 a.m. Possible intermittent lane closures for illumination work. Last Updated: 9/19/2018 4:11 PM More Info
At milepost 3
LOWEST IMPACT
SR 397 Both Directions - SR-397 milepost 4 and milepost 15 vicinity: Monday Sept. 17 and Thursday Sept. 20, during daytime hours, drivers should be prepared for minor delays as flaggers will intermittently stop traffic on Monday Sept. 17 near MP 4 and Thursday Sept. 20 near MP 15. Last Updated: 9/19/2018 4:09 PM More Info
From milepost 4 to milepost 15
LOWEST IMPACT
US 12 Both Directions - US-12 MP 138 to MP 166, both directions, Wednesday Sept 19 to Thursday Sept 20 from 6:30 a.m. to 4 p.m. Crews will be inspecting and cleaning culverts along the highway shoulders, minimal impacts anticipated. Last Updated: 9/19/2018 4:07 PM More Info
From milepost 138 to milepost 166
LOWEST IMPACT
SR 397 Both Directions - SR-397 both directions milepost 3 to milepost 7: Thursday Sept. 20 from 7:30 a.m. to 3:30 p.m. traffic will be reduced to one lane for pavement sealing. Last Updated: 9/19/2018 3:42 PM More Info
From milepost 3 to milepost 7
LOWEST IMPACT
US 395 Both Directions - Construction on US 395 Spur - NSC both directions at the Freya Roundabouts Monday - Friday 6:00 am to 4:30 pm. Roadway users should be alert for occasional traffic control. Last Updated: 8/2/2018 12:51 PM More Info
At milepost 164
LOWEST IMPACT
SR 21 Both Directions - Construction on SR 21 both directions from milepost 74.0 near MP Marker 74 to milepost 91.8 near SR 2 until further notice. Roadway users should be alert for flaggers and or pilot cars directing single-lane, alternating traffic with some delays when work is underway. Last Updated: 7/26/2018 5:16 PM More Info
From milepost 74 to milepost 92
LOWEST IMPACT
SR 261 Both Directions - Construction on SR 261 both directions from milepost 44.8 near Sutton Rd to milepost 62.7 near SR 90-Weber Rd Off Ramp until further notice. Roadway users should be alert for flaggers and or pilot cars directing single-lane, alternating traffic with some delays. Last Updated: 7/26/2018 4:52 PM More Info
From milepost 45 to milepost 63