Return to Map

MODERATE IMPACT
US 97 Northbound - US-97 northbound milepost 75 Union Gap: Until mid-October, the US-97 northbound ramp to westbound I-82 is closed with a detour for travelers wanting to proceed on I-82 westbound. The northbound US-97 off-ramp to Main Street Union Gap is open. A signed detour will direct drivers through the project area. Businesses in south Union Gap will remain open through construction. Last Updated: 9/16/2019 12:04 AM More Info
At milepost 75
MODERATE IMPACT
US 97 Both Directions - On US 97 at Beebe Bridge (south of the junction with SR 150) on Tuesday and Wednesday, between 7:30 a.m. and 4 p.m., expect flagger controlled traffic with delays of 20 minutes while the bridge crew inspects the structure. Last Updated: 9/13/2019 4:31 PM More Info
At milepost 235
MODERATE IMPACT
US 97 Both Directions - At US 97 Blewett Pass at milepost 159 in both directions near Swauk Creek campground, Monday through Friday 6 a.m. to 6 p.m., expect flagger-controlled traffic with delays up to 20 minutes as the contractor prepares the site for winter suspension. The contractor is in the process of shifting traffic back to the original highway alignment, at which time the reduced speed limit and oversized load restrictions will be lifted. Last Updated: 9/13/2019 4:09 PM More Info
From milepost 159 to milepost 160