Emergency alert symbol

COVID-19

For the latest COVID-19 health guidance, statistics and resources, visit Coronavirus.wa.gov.

Return to Map

Silver Alert
Statewide - This is an activation of the Washington State-wide silver Alert Plan, The Washington State Patrol is asking for public's assistance in locating the following vehicle, a Gold Mazda Protege with Washington License Plate: BPE2921. If you have any information, call 911 immediately. Last Updated: 9/21/2020 10:05 PM

HIGHEST IMPACT
I-5 Southbound - Road work on I-5 southbound at milepost 135 near E Bay St/SR 167 beginning at 9:02 pm on September 21, 2020 until further notice. Blocking ramp to Bay st. Last Updated: 9/21/2020 9:05 PM More Info
At milepost 135
HIGHEST IMPACT
SR 8 Westbound - Collision on SR 8 westbound at milepost 0 near US 12 beginning at 8:39 pm on September 21, 2020 until further notice. The westbound lanes are blocked. Traffic being diverted to SR12 off-ramp and back on SR8. Last Updated: 9/21/2020 8:44 PM More Info
At milepost 0
HIGHEST IMPACT
I-5 Both Directions - From 12:01 a.m. Saturday, Sept. 19 until 11:59 p.m. Sunday, Sept. 27: Crews will close the northbound span of the Interstate Bridge to replace mechanical parts that help lift and lower the bridge. During the nine-day closure, travelers crossing the Interstate Bridge in both directions will share the three existing lanes and sidewalk on the southbound bridge. Last Updated: 9/14/2020 8:11 AM More Info
At milepost 0
HIGHEST IMPACT
SR 410 Both Directions - On SR 410 eastbound & westbound from 323rd Ave SE (MP 29) to 583rd Ave E (MP 43) all lanes are closed. Last Updated: 9/11/2020 4:00 PM More Info
From milepost 29 to milepost 43
HIGH IMPACT
I-5 Southbound - Road work on I-5 southbound at milepost 123.59 near Thorne Lane SW beginning at 9:38 pm on September 21, 2020 until about 4:30 am on September 22, 2020. Both ramps are closed, "To" and "From" Thorne Lane. Last Updated: 9/21/2020 9:42 PM More Info
At milepost 124
HIGH IMPACT
SR 162 Both Directions - Road work on SR 162 both directions from milepost 8.93 near Whitehawk Blvd to milepost 9.5 near Calistoga St beginning at 9:33 pm on September 21, 2020 until about 5:00 am on September 22, 2020. Last Updated: 9/21/2020 9:40 PM More Info
From milepost 9 to milepost 10
HIGH IMPACT
SR 410 Eastbound - Road work on SR 410 eastbound at milepost 9.32 near E Main Ave/Traffic Ave beginning at 9:11 pm on September 21, 2020 until about 6:00 am on September 22, 2020. Last Updated: 9/21/2020 9:14 PM More Info
At milepost 9
HIGH IMPACT
I-5 Northbound - Road work on I-5 northbound at milepost 120.88 near Joint Base Lewis-Mcchord Main Gate beginning at 9:02 pm on September 21, 2020 until about 4:30 am on September 22, 2020. Last Updated: 9/21/2020 9:06 PM More Info
At milepost 121
HIGH IMPACT
I-5 Southbound - Road work on I-5 southbound from milepost 138 near 70th Ave E to milepost 135 near E Bay St/SR 167 beginning at 8:55 pm on September 21, 2020 until about 5:00 am on September 22, 2020. Last Updated: 9/21/2020 8:59 PM More Info
From milepost 138 to milepost 135
HIGH IMPACT
US 101 Westbound - Road work on US 101 westbound at milepost 250 near Baker St beginning at 8:48 pm on September 21, 2020 until about 4:00 am on September 22, 2020. Last Updated: 9/21/2020 8:50 PM More Info
At milepost 250
HIGH IMPACT
SR 305 Both Directions - Road work on SR 305 both directions at milepost 7.01 near Agate Pass Bridge beginning at 8:46 pm on September 21, 2020 until about 8:00 am on September 22, 2020. Last Updated: 9/21/2020 8:48 PM More Info
At milepost 7
HIGH IMPACT
US 101 Southbound - Road work on US 101 southbound at milepost 89 near Hoquiam North City Limits beginning at 8:31 pm on September 21, 2020 until about 6:00 am on September 22, 2020. Last Updated: 9/21/2020 8:37 PM More Info
At milepost 89
HIGH IMPACT
I-5 Southbound - Road work on I-5 southbound from milepost 111 near Carpenter Rd NE to milepost 109 near Martin Way E beginning at 8:27 pm on September 21, 2020 until about 5:00 am on September 22, 2020. Last Updated: 9/21/2020 8:31 PM More Info
From milepost 111 to milepost 109
HIGH IMPACT
I-5 Southbound - Road work on I-5 southbound from milepost 122 near Lakewood South City Limits to milepost 121 near Joint Base Lewis-Mcchord Main Gate beginning at 8:24 pm on September 21, 2020 until about 5:00 am on September 22, 2020. Last Updated: 9/21/2020 8:27 PM More Info
From milepost 122 to milepost 121
HIGH IMPACT
SR 510 Both Directions - From 8 p.m. Friday, Sept. 25 to 5 a.m. Monday, Sept. 28, Marvin Road overpass will close to all travelers between Quinault Drive NE and Britton Parkway NE/Willamette Drive NE. All Marvin Road ramps to and from I-5 will also close. Last Updated: 9/15/2020 9:10 AM More Info
From milepost 0 to milepost 1
HIGH IMPACT
I-5 Southbound - During the closure of the Interstate Bridge, from 12:01 a.m. Saturday, Sept. 19 until 11:59 p.m. Sunday, Sept. 27, crews will close the SR 14/Washington Street on-ramp to southbound I-5 in Vancouver for traffic control and safety in the work zone. Last Updated: 9/14/2020 12:03 PM More Info
At milepost 0
HIGH IMPACT
I-5 Northbound - During the closure of the Interstate Bridge, from 12:01 a.m. Saturday, Sept. 19 until 11:59 p.m. Sunday, Sept. 27, crews will close the northbound I-5 off-ramp to eastbound SR 14 in Vancouver for traffic control and safety in the work zone. Last Updated: 9/14/2020 12:02 PM More Info
At milepost 0
HIGH IMPACT
SR 26 Both Directions - On SR 26 at milepost 57 Bridge 118 (Providence Coulee Bridge), Monday through Thursday from 6 a.m. to 6 p.m., expect traffic control with automated flagger assistance device (AFAD). There will be 12 ft. width restriction 24/7 during the span of the project. Over-width loads are encouraged to use an alternate route. Work may take up to three weeks, depending on conditions. Last Updated: 9/12/2020 3:49 PM More Info
At milepost 57
HIGH IMPACT
SR 119 Both Directions - Closure on SR 119 both directions at milepost 10.89 beginning at 12:00 am on August 22, 2020 until about September 30, 2020. The roadway is closed after Mount Rose Village. There is no public access to Lake Cushman and Staircase Mountain. Last Updated: 8/21/2020 1:50 PM More Info
At milepost 11
HIGH IMPACT
SR 302 Both Directions - This project project removes and replaces outdated culverts under SR 302 with fish passable structures, repaves 8 miles highway, and rebuilds sidewalks and ramps at the Key Center intersection of SR 302/SR 16. Expect daytime lane and shoulder closures through fall of 2021. Repairs to the Purdy Spit Bridge will require up to three weekend closures and a signed detour will be provided. Last Updated: 7/22/2020 12:41 PM More Info
From milepost 11 to milepost 17
HIGH IMPACT
US 101 Both Directions - Crews are removing multiple barriers to fish under US 101 between Sequim and Port Angeles at Bagley and Siebert Creeks for improved fish passage which will require around-the-clock construction, shifted lanes and reduced speeds through fall of 2021. Any highway closures will be announced in advance. Last Updated: 7/22/2020 11:29 AM More Info
From milepost 253 to milepost 257
HIGH IMPACT
SR 506 Both Directions - Beginning at 7 a.m. on Tuesday, June 18, until further notice: Both directions of SR 506, between Telegraph Road and the end of the Lacamas Creek Bridge, will be fully closed, for bridge replacement work.
Note: During construction, travelers will follow a signed detour using South Military Road and SR 505. The bridge closure and detour will remain in place until construction of the new bridge is complete. Last Updated: 6/14/2019 4:59 PM More Info
From milepost 8 to milepost 8
MODERATE IMPACT
I-90 Westbound - Left lanes closed in Spokane Valley on I-90 westbound at milepost 288 from Spaldings to Freya beginning at 8:00 pm on September 21, 2020 until about 5:00 am September 22, 2020. Last Updated: 9/21/2020 8:34 PM More Info
At milepost 288
MODERATE IMPACT
I-90 Both Directions - I-90 milepost 34 to 136 North Bend to Vantage: There are a number of maintenance and construction work zones between North Bend and Vantage. Motorists will experience minor delays this week due to lane closures. Pay attention and slow down as you enter and exit our work zones. Last Updated: 9/21/2020 7:57 PM More Info
From milepost 34 to milepost 136
MODERATE IMPACT
I-90 Both Directions - Advance Notice: I-90 Snoqualmie Pass closure scheduled for rock blasting on Wednesday night, Sept. 23 starting at 6 p.m. These closures are expected to last one hour or more. The eastbound lanes will be closed ten miles east of the summit at milepost 63 near Cabin Creek and the westbound lanes will be closed at milepost 70 near Easton. Last Updated: 9/21/2020 7:55 PM More Info
From milepost 63 to milepost 70
MODERATE IMPACT
I-90 Eastbound - Left lanes closed in Spokane on I-90 eastbound at milepost 283 from Freya to Argonne beginning at 7:45 pm on September 21, 2020 until about 5:00 am September 22, 2020. Last Updated: 9/21/2020 7:48 PM More Info
At milepost 283
MODERATE IMPACT
I-90 Both Directions - Ramp closures in Spokane Valley on I-90 both directions at the Barker Exit, milepost 293 beginning at 7:15 pm on September 21, 2020 until about 5:00 am September 22, 2020. The westbound ramps are closed and the eastbound off ramp is closed Last Updated: 9/21/2020 7:28 PM More Info
At milepost 293
MODERATE IMPACT
SR 203 Both Directions - Northbound & southbound traffic is alternating on SR 203 at NE 88th St (MP 9) due to roadwork. Last Updated: 9/21/2020 6:26 PM More Info
At milepost 8
MODERATE IMPACT
SR 9 Both Directions - Monday, Sept 21, to the morning of Thursday, Sept. 24 - Alternating traffic on SR 9 between 84th Street Northeast and 132nd Street Northeast from 8 p.m. to 5 a.m. nightly. Last Updated: 9/21/2020 5:03 PM More Info
From milepost 21 to milepost 24
MODERATE IMPACT
SR 522 Westbound - On SR 522 westbound at NE 137th St (MP 4) the right lane is closed due to roadwork. Last Updated: 9/21/2020 9:45 AM More Info
At milepost 4
MODERATE IMPACT
SR 532 Both Directions - Sunday, Sept. 20, to the morning of Friday, Sept. 25 - A single lane in each direction of SR 532 between 72nd Avenue Northwest and I-5, as well as between East Camano Drive and Smith Road, will close from 8 p.m. to 6 a.m. nightly. Last Updated: 9/18/2020 6:19 PM More Info
At milepost 2
MODERATE IMPACT
SR 524 Eastbound - Monday, Sept. 21 - A single lane of eastbound SR 524 near Yew Way will close from 8 p.m. to 12:00 a.m. Last Updated: 9/18/2020 5:40 PM More Info
At milepost 11
MODERATE IMPACT
I-5 Northbound - Monday, Sept. 21, to the morning of Friday, Sept. 25 - The northbound I-5 ramp to westbound SR 526 will close for expansion joint repairs 8 p.m. to 4 a.m. nightly. A signed detour will be in place. Last Updated: 9/18/2020 5:36 PM More Info
At milepost 189
MODERATE IMPACT
SR 99 Northbound - Sunday, Sept. 20, to the morning of Wednesday, Sept. 23 - Three lanes of northbound SR 99 between the First Avenue South on-ramp and the South Michigan Street off-ramp will close from 9 p.m. to 5 a.m. nightly. Last Updated: 9/18/2020 4:36 PM More Info
At milepost 27
MODERATE IMPACT
SR 282 Both Directions - On SR 282 between milepost 0 and 4.92 (Ephrata), Friday only, from 7 a.m to 4:30 p.m, expect flagger controlled traffic with pilot car and delays up to 20 minutes where the contractor is installing guideposts. Last Updated: 9/18/2020 3:54 PM More Info
From milepost 0 to milepost 5
MODERATE IMPACT
US 97 Both Directions - On US 97 milepost 152 (Lauderdale near Blewett Pass), Tuesday only, from 7 a.m. to 3 p.m., expect flagger controlled traffic with delays up to 10 minutes where a utility crew is installing fiber optic cable. Last Updated: 9/18/2020 3:48 PM More Info
From milepost 153 to milepost 153
MODERATE IMPACT
SR 20 Both Directions - On SR 20 between milepost 194 and 209 (Winthrop to junction of SR 20/153), Monday through Wednesday, from 7 a.m to 4:30 p.m, expect flagger controlled traffic with pilot car and delays up to 20 minutes where the contractor is installing guideposts. Last Updated: 9/18/2020 3:46 PM More Info
From milepost 194 to milepost 209
MODERATE IMPACT
US 2 Both Directions - On US 2 Stevens Pass between milepost 64 and 71, Monday and Tuesday, from 8:30 a.m. to 4:30 p.m., expect flagger controlled traffic with delays where the contractor is applying grooved paint line. Last Updated: 9/18/2020 3:31 PM More Info
From milepost 64 to milepost 71
MODERATE IMPACT
US 2 Both Directions - On US 2 between milepost 71-78 (Stevens Pass), Monday through Friday from 7 a.m. to 5 p.m., expect flagger controlled traffic with delays where the contractor is installing guideposts and applying paint and plastic pavement markings. Last Updated: 9/18/2020 3:31 PM More Info
From milepost 71 to milepost 78
MODERATE IMPACT
I-5 Northbound - Monday, Sept. 21 to the morning of Tuesday, Sept. 22 – The northbound I-5 off-ramp to S 320th will close from 9 p.m. to 4:30 a.m. Last Updated: 9/18/2020 1:18 PM More Info
At milepost 144
MODERATE IMPACT
I-405 Southbound - Monday, Sept. 21 to the morning of Tuesday, Sept. 22 – The HOT lane of southbound I-405 at milepost 22.12 will close from 9 p.m. to 5 a.m. Last Updated: 9/18/2020 1:17 PM More Info
From milepost 22 to milepost 23
MODERATE IMPACT
I-405 Southbound - Monday, Sept. 21 to the morning of Tuesday, Sept. 22 – The HOT lane of southbound I-405 at 236th Street SE will close from 9 p.m. to 5 a.m. Last Updated: 9/18/2020 1:16 PM More Info
At milepost 26
MODERATE IMPACT
I-205 Both Directions - From 8 p.m. Tuesday, Sept. 22 until 5 a.m. Wednesday, Sept. 23:  Crews will intermittently close the on-ramp to southbound I-205 from eastbound Mill Plain Boulevard. Crews will also intermittently close the northbound I-205 off-ramp to eastbound Mill Plain Boulevard. Access to westbound Mill Plain Boulevard will remain open. Last Updated: 9/18/2020 11:10 AM More Info
At milepost 28
MODERATE IMPACT
SR 520 Westbound - Monday, Sept. 21 to the afternoon of Wednesday, Sept. 23 – The westbound SR 520 off-ramp to 148th Avenue NE will close from 10 p.m. to 5 a.m. nightly. Last Updated: 9/18/2020 10:54 AM More Info
At milepost 9
MODERATE IMPACT
SR 520 Westbound - Monday, Sept. 21 to the afternoon of Wednesday, Sept. 23 – The 148th Avenue NE on-ramp to westbound SR 520 will close from 10 p.m. to 5 a.m. nightly. Last Updated: 9/18/2020 10:53 AM More Info
At milepost 9
MODERATE IMPACT
SR 520 Westbound - Monday, Sept. 21 to the afternoon of Wednesday, Sept. 23 – The NE 40th Street on-ramp to westbound SR 520 will close from 10 p.m. to 5 a.m. nightly. Last Updated: 9/18/2020 10:52 AM More Info
At milepost 10
MODERATE IMPACT
SR 520 Westbound - Monday, Sept. 21 to the afternoon of Wednesday, Sept. 23 – The westbound SR 520 off-ramp to NE 40th Street will close from 10 p.m. to 5 a.m. nightly. Last Updated: 9/18/2020 10:51 AM More Info
At milepost 10
MODERATE IMPACT
SR 520 Westbound - Monday, Sept. 21 to the afternoon of Friday, Sept. 25 – Westbound SR 520 between NE 40th Street and 148th Avenue NE will close from 10 p.m. to 5 a.m. nightly. Last Updated: 9/18/2020 10:50 AM More Info
From milepost 10 to milepost 10
MODERATE IMPACT
US 101 Both Directions - Crews are replacing three outdated, damaged culverts that run under US 101 at Steamboat Creek, Harlow Creek and Fisher Creek between Queets and Kalaloch. The damaged culverts will be replaced with concrete girder bridges and are expected to open up nearly nine miles of potential fish habitat for salmon and resident fish. Work is expected to wrap up at all three sites fall of 2021. Travelers will encounter one-way alternating with a temporary signal around-the-clock. Last Updated: 9/17/2020 2:11 PM More Info
From milepost 146 to milepost 162
MODERATE IMPACT
US 101 Both Directions - Crews for Olympic National Park are replacing a damaged culvert under US 101 at Lake Crescent near La Poel Creek from earlier winter rains. Drivers should expect one-way alternating traffic with flaggers during weekday, daytime hours beginning Sept. 21 through Oct. 31. A temporary traffic signal will alternate traffic during weekend hours while work is underway. Any questions should be directed to ONP at https://www.nps.gov/olym/planyourvisit/conditions Last Updated: 9/17/2020 10:20 AM More Info
At milepost 224
MODERATE IMPACT
SR 410 Both Directions - Fire on SR 410 at milepost 29 near Mud Mountain Dam Rd beginning at 6:08 am on September 8, 2020 until further notice. Last Updated: 9/11/2020 3:58 PM More Info
From milepost 29 to milepost 43
MODERATE IMPACT
US 2 Both Directions - On US 2/97 near Cashmere (milepost 110), Sept. 16-30, a portion of Sunburst Lane north of the highway where the contractor is using the area to stage navigate a crane. Eastbound off ramp and westbound turn lane to W. Cashmere Bridge/Goodwin Rd. will be closed.

Contact: Chelan County Public Works 509-667-6415 Last Updated: 9/11/2020 1:24 PM More Info
From milepost 110 to milepost 110
MODERATE IMPACT
SR 231 Both Directions - Closure on SR 231 both directions from Valley at milepost 72 to US395 milepost 75 beginning at 10:00 pm on September 8, 2020 until October 5, 2020. Last Updated: 9/8/2020 9:55 PM More Info
At milepost 75
MODERATE IMPACT
SR 530 Both Directions - Eastbound & westbound traffic is alternating on SR 530 at 115th Ave NE (MP 25) due to roadwork. Last Updated: 9/1/2020 9:49 AM More Info
At milepost 25
MODERATE IMPACT
I-5 Northbound - Saturday, Aug. 29 - A single lane in each direction of I-5 will close from 8 a.m. to 3 p.m. Last Updated: 8/28/2020 5:27 PM More Info
At milepost 228
MODERATE IMPACT
SR 103 Both Directions - Beginning Monday, Aug. 31 to Wednesday, Sept. 30: Travelers in both directions of SR 103 between the intersection of US 101 and Stackpole Road, and along US 101 between 38th Place and the intersection of SR 103, will encounter intermittent, single lane closures with flaggers, daily, from 8 a.m. to 6:30 p.m. for paving work. Last Updated: 8/27/2020 3:16 PM More Info
From milepost 0 to milepost 20
MODERATE IMPACT
US 101 Both Directions - One-way alternating traffic in place following several feet of recent roadway settlement. WSDOT will continue to monitor the roadway for further settlement issues. Loads are restricted to no wider than 14 feet to provide clearance. A contract to repair the roadway following widespread damages throughout Washington due to natural disaster is currently underway. A timeline for permanent repairs has not been shared yet. This is the second, latest slide discovered along US 101 at Cosi Hill. Last Updated: 7/22/2020 10:59 AM More Info
At milepost 79
MODERATE IMPACT
US 97 Both Directions - Monday, July 13 until further notice: Travelers on both directions of US 97, between Indian Service Road and Wilson Charley Road, will encounter intermittent single lane closures with flaggers, daily, from 7 a.m. to 5 p.m., for construction of the new bridge.

Note: The speed limit through the work zone has been temporarily reduced from 65 mph to 40 mph. This speed limit reduction will remain in place throughout construction Last Updated: 7/16/2020 9:38 AM More Info
From milepost 31 to milepost 31
MODERATE IMPACT
US 101 Both Directions - Grays Harbor County Public Works announced they are closing Blue Slough Road just south of Aberdeen (a cut through between US 101 and SR 107) beginning July 6 through October 31 for road construction. Inquiries should be directed to Grays Harbor County Roads Department Supervisor Mike Zabiaka at 360-964-1645. Last Updated: 6/25/2020 2:05 PM More Info
At milepost 80
MODERATE IMPACT
I-90 Eastbound - The EB on-ramp to I-90 at Freya Street, MP 284 in the Spokane Valley is closed until further notice for construction, use an alternate route. Beginning at 10:50 am on June 22, 2020 until further notice. Last Updated: 6/23/2020 10:02 AM More Info
At milepost 284
MODERATE IMPACT
SR 290 Both Directions - SR 290 closed for bridge replacement starting near MP 0.5 at the Spokane River, City of Spokane, EB 290 is closed at Hamilton Street, WB 290 is closed at Iron Court, commercial vehicles are diverted to Freya Street, all other traffic can use Mission Street, beginning at 6:18 am on June 3, 2020 until further notice. Follow signed detour route and expect delays. Last Updated: 6/3/2020 8:04 AM More Info
From milepost 1 to milepost 2
MODERATE IMPACT
US 195 Southbound - Right Lane Closure on US 195 SB at MP 81.5 near Cornwall Road for Bridge work near Spangle, expect a slight delays, Maximum bridge weight 105,500 legal loads only, no over legal axle weights.beginning at 6:53 am on May 29, 2020 until further notice. Last Updated: 6/1/2020 9:06 AM More Info
At milepost 81
MODERATE IMPACT
SR 231 Both Directions - Lane closure with temporary traffic signal on SR 231 MP 74.5 near US 395, just South of Chewelah, beginning at 10:45 am on January 28, 2020 until further notice. Motorists should expect delays. Last Updated: 2/1/2020 10:30 PM More Info
At milepost 74
MODERATE IMPACT
Wellesley Both Directions - The City of Spokane: Starting Wednesday, Nov. 20, contractor crews working for the Washington State Department of Transportation will begin constructing the North Spokane Corridor (NSC) Wellesley Avenue interchange. During this time, Wellesley Avenue between Market Street and Freya Street will be closed to pedestrian, bicycle and vehicular traffic. The closure and interchange work will last until the end of 2022. Please use alternate routes. Last Updated: 11/12/2019 8:53 AM More Info

MODERATE IMPACT
SR 116 Both Directions - Crews for WSDOT and NOSC are working to restore historic tidal channels and fish runs between southern Kilisut Harbor and Oak Bay by constructing a 440' concrete girder bridge along SR 116. During construction, travelers should expect weekday daytime delays as well as reduced speeds with one-way alternating traffic early August 2019 through fall 2020. Last Updated: 9/17/2019 2:30 PM More Info
At milepost 5
MODERATE IMPACT
SR 302 Both Directions - This project removes and replaces three, outdated fish barriers under SR 302 at Minter Creek with fish passable structures and repaves nearly 7 miles of highway along with ADA improvements and deck repairs for the Purdy Spit Bridge. Construction began Monday, Aug. 26 and drivers should expect daytime lane and shoulder closures through fall of 2020. Last Updated: 9/13/2019 12:02 PM More Info
From milepost 11 to milepost 17
MODERATE IMPACT
SR 6 Both Directions - Tuesday, Aug. 13 until further notice: Travelers on both directions of SR 6, between mileposts 22.60 and 22.69, will be shifted onto a temporary single-lane, bypass road. This detour allows travelers to safely bypass construction around-the-clock, and will be controlled with an automated signal.
Note: Travelers should expect delays of up to 20 minutes, for additional intermittent, daytime single-lane closures, as needed. Last Updated: 8/9/2019 2:41 PM More Info
From milepost 23 to milepost 23
MODERATE IMPACT
SR 21 Both Directions - Construction on SR 21 both directions at milepost 145.6 near W Fork Sanpoil River until further notice. Drivers will need to be alert approaching the bridge as the temporary structure is a single lane bridge with alternating traffic. Last Updated: 7/30/2019 8:42 AM More Info
At milepost 146
MODERATE IMPACT
SR 6 Both Directions - Beginning Monday, July 26, until further notice: Travelers on both directions of SR 6, near Jones Creek just east of Pe Ell, will be shifted onto a temporary single-lane, bypass road. This detour allows travelers to safely bypass construction around-the-clock, and will be controlled with an automated signal.
Note: Travelers should expect delays of up to 20 minutes, for additional intermittent, daytime single-lane closures, as needed. Last Updated: 7/26/2019 1:29 PM More Info
From milepost 31 to milepost 32
LOW IMPACT
SR 240 Both Directions - SR-240 milepost 33 Richland vicinity: Access to Duportail Rd to and from SR 240 is closed 24 hours a day, seven days a week for roadway construction improvements. Detours are in place. Expect SR 240 in both directions at Duportail Rd intersection to have a single lane closure and speed reduction. Last Updated: 9/21/2020 7:57 PM More Info
From milepost 33 to milepost 34
LOW IMPACT
US 12 Both Directions - US-12 both directions milepost 307 to 314 near Wallula Jct.: Tuesday Sept. 22 and Wednesday Sept. 23 be prepared for flaggers alternating one-way traffic or for one-way piloted traffic control during daytime hours. Traffic should anticipate delays. Last Updated: 9/21/2020 7:56 PM More Info
From milepost 307 to milepost 314
LOW IMPACT
I-82 Eastbound - I-82 eastbound milepost 114 Kennewick vicinity: Monday through Friday from 7 a.m. to 4 p.m. there will be a right lane closure with reduced speed limit 24 hours a day, 7 days a week. Last Updated: 9/21/2020 7:56 PM More Info
At milepost 114
LOW IMPACT
I-82 Eastbound - I-82 eastbound milepost 30 just north of Yakima, Tuesday Sept. 22 between the hours of 9 a.m. to 3:30 p.m. there will be a left lane closure for bridge maintenance and repairs. Travelers in this vicinity may experience some delays and added travel time.
I-82 eastbound milepost 31: Monday Sept. 21 to Wednesday Sept 23 each night start at 6 p.m. to 2:30 a.m. there will be a right lane closure for bridge work. Last Updated: 9/21/2020 7:56 PM More Info
From milepost 30 to milepost 31
LOW IMPACT
US 395 Both Directions - US-395 southbound milepost 18 Pasco/Kennewick, Lewis Street on ramp:Tuesday Sept. 22 between 8:30 a.m. and 3:30 p.m., there will be a right lane closure for bridge inspection.
US-395 northbound milepost 19 and Columbia Drive on ramp: Wednesday Sept. 23 and Thursday Sept. 24 between 8:30 a.m. and 3:30 p.m., travelers may experience some delay and added travel time due to a right lane closure for bridge inspection. Last Updated: 9/21/2020 7:55 PM More Info
From milepost 18 to milepost 19
LOW IMPACT
SR 11 Northbound - Wednesday, Sept. 21, to the afternoon of Friday, Sept. 25 - A single lane in each direction of SR 11 between I-5 and Chuckanut Crest Drive will close from 8 a.m. to 5 p.m. daily. Last Updated: 9/18/2020 6:14 PM More Info
At milepost 18
LOW IMPACT
SR 20 Both Directions - On SR 20 between milepost 149 and 150 (Rainy Pass), Monday through Friday from 7 a.m. to 5 p.m., expect shoulder closures and intermittent flagger controlled traffic with delays up to 20 minutes. Last Updated: 9/18/2020 3:36 PM More Info
From milepost 149 to milepost 150
LOW IMPACT
US 97 Both Directions - On US 97 Blewett Pass milepost 159-160 (near Swauk Creek Campground), Monday through Friday from 6 a.m. to 6 p.m., expect flagger controlled traffic with delays as the contractor prepares for winter shut down. Traffic has been shifted to a temporary bypass lane with a reduced speed limit and 12 ft. width restriction. Bypass lane has narrow shoulder. Last Updated: 9/18/2020 3:34 PM More Info
At milepost 160
LOW IMPACT
I-90 Both Directions - On I-90 between milepost 138 and 179 (Vantage to Moses Lake), Monday through Thursday from 8 p.m. to 6 a.m. expect shoulder closures from north of Vantage Bridge to Moses Lake where the contractor is removing and installing overhead signs on I-90. Last Updated: 9/18/2020 3:33 PM More Info
From milepost 138 to milepost 176
LOW IMPACT
I-90 Westbound - Monday, Sept. 21 to the afternoon of Friday, Sept. 25 – The right lane on westbound I-90 between SR 900 and 150th Avenue will close from 10 a.m. to 5 p.m. daily. Last Updated: 9/18/2020 10:49 AM More Info
From milepost 16 to milepost 12
LOW IMPACT
I-90 Eastbound - Monday, Sept. 21 to the afternoon of Wednesday, Sept. 23 – A lane on eastbound I-90 at SR 202 will close at 2 a.m. to 2 p.m. daily. Last Updated: 9/18/2020 10:48 AM More Info
At milepost 31
LOW IMPACT
Freya St Both Directions - Spokane County will have lane restrictions for road work on Freya Street between 55th and 57th Ave, until about September 30, 2020. Expect delays, use other routes. Last Updated: 9/15/2020 8:40 AM More Info

LOW IMPACT
North Kentuck Trails Rd Both Directions - Spokane County will have lane closures for bridge repairs between West Bradshaw Rd and Keevy Rd, starting on September 1 until about October 30, 2020. Expect delays. Last Updated: 9/15/2020 8:37 AM More Info

LOW IMPACT
Geiger Bv Both Directions - Spokane County will have Geiger Blvd closed between Soda Road and Electric Ave (Spokane City Limits) for road work starting on August 17th to November 30, 2020. Use other routes and expect delays. Last Updated: 9/15/2020 8:34 AM More Info

LOW IMPACT
Forker Rd Both Directions - Spokane County will have lane closures with flagged traffic for road work on Progress Road and Forker Rd. Expect delays, estimate road to open September 22, 2020. Last Updated: 9/15/2020 8:33 AM More Info

LOW IMPACT
Hallett Rd Both Directions - Spokane County will have lane closures for road work on Hallett Road between Assembly Rd and West Terrace St. Starting on September 3 to September 8, 2020. Expect delays. Last Updated: 9/6/2020 5:24 PM More Info

LOW IMPACT
US 195 Both Directions - Horn School Rest Area is closed until further notice on US 195 at milepost 60.5, two miles south of Rosalia, beginning at 10:19 am on September 4, 2020 until further notice. We apologize for any inconvenience this may cause you. Last Updated: 9/4/2020 10:40 AM More Info
At milepost 60
LOW IMPACT
I-90 Eastbound - Tuesday, Sept. 1 to the afternoon of Thursday, Sept. 3 – The right lane on eastbound I-90 between 150th Avenue and SR 900 will close from 7 a.m. to 2 p.m. daily. Last Updated: 8/28/2020 1:26 PM More Info
From milepost 12 to milepost 16
LOW IMPACT
SR 500 Both Directions - Monday, June 8, until further notice: Travelers on both directions of Northeast Everett Street/SR 500, at the Northeast Lake Road intersection will encounter flaggers directing traffic through a single lane, daily from 7 a.m. to 5 p.m., for intersection improvements work. Last Updated: 7/16/2020 10:02 AM More Info
From milepost 18 to milepost 19
LOW IMPACT
SR 4 Both Directions - Beginning on Saturday, Feb. 8 until further notice: Travelers on both directions of the highway will alternate through a single lane around the clock with a temporary traffic signal until the project is complete. For safety, the speed limit through the area is reduced to 25 mph. Last Updated: 3/28/2020 3:48 PM More Info
From milepost 22 to milepost 26
LOWEST IMPACT
US 12 Both Directions - US-12 milepost 165 to milepost 166, east of White Pass: Monday Sept. 21 to Wednesday Sept. 23 from 7 a.m. to 5 p.m. expect flagged traffic control. Work depends of fire conditions. Last Updated: 9/21/2020 7:57 PM More Info
From milepost 165 to milepost 167
LOWEST IMPACT
US 12 Westbound - US-12 westbound approximately eight miles west of Yakima, from Locust Lane to Allan Road, between milepost 192 and milepost 191, Monday Sept. 21 through Friday Sept. 25 between the hours of 6 a.m. and 6 p.m., drivers may experience minor delays as utility crews will have a single lane closure through the work zone. Last Updated: 9/21/2020 7:56 PM More Info
From milepost 192 to milepost 191
LOWEST IMPACT
I-82 Eastbound - I-82 eastbound milepost 33, Fair Avenue and the I-82 on ramp: Monday through Friday from 3 a.m. to 7 p.m., the work zone on Fair Ave. will be limited to a single lane at times and drivers may experience minor delays. The intersection of the I-82 Exit 33A off ramp and Fair Avenue will be flagger controlled between the hours of 3 a.m. and 3 p.m. I-82 mainline is not affected. Last Updated: 9/21/2020 7:56 PM More Info
At milepost 33
LOWEST IMPACT
US 395 Both Directions - US 395 milepost 17 Kennewick, N. Ely St., W. Clearwater Ave., Vista Way Intersections: Thursday, Sept. 24, from 9 p.m. to 11 p.m., the work zone will be limited to a single lane at times and drivers may experience minor delays. Last Updated: 9/21/2020 7:55 PM More Info
At milepost 17
LOWEST IMPACT
US 12 Both Directions - US-12 milepost 347 to 350 both directions east of Walla Walla: Monday Sept. 21 through Thursday Sept. 24 between 7 a.m. and 4 p.m. travelers will experience some delay and added travel time due to flagger controlled alternating one lane traffic control for pavement repair and preservation work. Last Updated: 9/21/2020 7:54 PM More Info
From milepost 347 to milepost 350
LOWEST IMPACT
US 12 Both Directions - US-12 milepost 358 Waitsburg: Drivers can expect shoulder closures and intermittent single-lane closures with flagged traffic control Monday through Wednesday during daylight hours. Last Updated: 9/21/2020 7:54 PM More Info
At milepost 358
LOWEST IMPACT
US 12 Both Directions - US-12 both directions milepost 175 Windy Point vicinity to milepost milepost 185 Jct. of US-12 and SR-410: Monday Sept. 21 to Thursday Sept. 24, between 7 a.m. and 4:30 p.m. travelers should expect single lane pilot car controlled traffic control with 10 minute delays and added travel time for pavement sealing and preservation work. This work is contingent on weather and fire status. Last Updated: 9/21/2020 7:49 PM More Info
From milepost 175 to milepost 185
LOWEST IMPACT
SR 506 Both Directions - Beginning on Tuesday, September 22: The roadway and Lacamas Creek Bridge will open to travelers unless it is postponed due to rain or smoke.

Note: Crews have some additional weather-dependent work to finish before the project is complete. Last Updated: 9/17/2020 3:15 PM More Info
From milepost 8 to milepost 9
LOWEST IMPACT
I-5 Northbound - Beginning Monday, Aug. 10 until further notice: Travelers on southbound I-5, between mileposts 58.9 and 59.3 will encounter single lane closures, nightly, from 8 p.m. to 6 a.m, for rigging work above and below the bridge deck. Also, the exit 59 southbound off-ramp will also be closed. Last Updated: 8/6/2020 6:59 AM More Info
From milepost 59 to milepost 60
LOWEST IMPACT
SR 410 Northbound - Cleared: SR 410 and SR 123 between Enumclaw and Packwood over Cayuse Pass Last Updated: 5/21/2020 3:58 PM More Info
From milepost 25 to milepost 66