Emergency alert symbol

COVID-19

For the latest COVID-19 health guidance, statistics and resources, visit Coronavirus.wa.gov.

Return to Map

HIGH IMPACT
I-205 Northbound - Collision on I-205 northbound at milepost 30 near Exit 30-Northbound / SR 500 has the right lane blocked by emergency vehicles beginning at 1:46 am on January 20, 2021 until further notice. Use caution in the area and move over for flashing lights. Last Updated: 1/20/2021 2:02 AM More Info
At milepost 30
HIGH IMPACT
I-5 Both Directions - Beginning Tuesday, Jan 12 through Thursday, Jan. 14: Crews will close the northbound and southbound I-5 Toutle River rest areas for annual maintenance including cleaning septic systems; beginning at 6:30 a.m. Tuesday, Jan. 12, and the facilities will remain closed until 5:00 p.m. Thursday, Jan. 14. Last Updated: 1/8/2021 11:26 AM More Info
At milepost 54
HIGH IMPACT
SR 504 Both Directions - Beginning at dusk on Monday, Dec. 21, until further notice: The gates to the upper level of SR 504/Spirit Lake Memorial Highway, near Coldwater Lake, will be closed for the winter. Last Updated: 12/21/2020 4:06 PM More Info
At milepost 45
HIGH IMPACT
SR 4 Both Directions - Beginning Tuesday, Nov. 17 until further notice: Travelers on both directions of SR 4 near the Cowlitz and Wahkiakum County line may encounter daytime single lane closures from 8:00 a.m.- 4:30 p.m. until the work is complete in spring 2021. Last Updated: 11/20/2020 10:23 AM More Info
From milepost 47 to milepost 48
HIGH IMPACT
SR 123 Both Directions - SR-123 Cayuse Pass is closed for the season due to adverse road and weather conditions. The closure is from the Arch at the park boundary near milepost 2 to the junction of SR 123 and SR 410. Last Updated: 11/12/2020 12:49 PM More Info
From milepost 2 to milepost 17
HIGH IMPACT
SR 6 Both Directions - Beginning Oct. 5 through Sept. 13, 2021: Travelers in both directions of SR 6, near Twin Oaks Road can expect traffic switched to a 2-lane 25 mph detour bypassing the closure.  Work includes excavation for bridge piers, bridge construction and culvert removal/installation. Last Updated: 10/9/2020 10:05 AM More Info
From milepost 46 to milepost 47
MODERATE IMPACT
SR 14 Eastbound - Maintenance on SR 14 eastbound from milepost 8 near 164th Avenue to milepost 10 near 192nd Avenue has the right lane closed intermittently for sweeping beginning at 11:25 pm on January 19, 2021 until further notice. Use caution in the area and move over for flashing lights. Last Updated: 1/19/2021 11:27 PM More Info
From milepost 8 to milepost 10
MODERATE IMPACT
SR 503 Southbound - Construction on SR 503 southbound at milepost 0.9 near 76th Street has the right lane blocked beginning at 8:47 pm on January 19, 2021 until further notice. Use caution in the area and move over for flashing lights. Last Updated: 1/19/2021 8:49 PM More Info
At milepost 1
MODERATE IMPACT
I-5 Northbound - Beginning Monday, Jan. 4, until further notice: All freight trucks will encounter a traffic shift to use the center lane on northbound I-5 along the Lewis River Bridge, between mileposts 19.36 and 20.0, just south of Woodland.
Note: All travelers should slow down through the area and freight traffic should watch for advanced signs advising them when to shift to use the center lane. Last Updated: 12/30/2020 1:35 PM More Info
From milepost 19 to milepost 20
MODERATE IMPACT
SR 6 Both Directions - Tuesday, Aug. 13 until further notice: Travelers on both directions of SR 6, between mileposts 22.60 and 22.69, will be shifted onto a temporary single-lane, bypass road. This detour allows travelers to safely bypass construction around-the-clock, and will be controlled with an automated signal.
Note: Travelers should expect delays of up to 20 minutes, for additional intermittent, daytime single-lane closures, as needed. Last Updated: 8/9/2019 2:41 PM More Info
From milepost 23 to milepost 23
LOWEST IMPACT
I-5 Northbound - Beginning Monday, Aug. 10 until further notice: Travelers on southbound I-5, between mileposts 58.9 and 59.3 will encounter single lane closures, nightly, from 8 p.m. to 6 a.m, for rigging work above and below the bridge deck. Also, the exit 59 southbound off-ramp will also be closed. Last Updated: 8/6/2020 6:59 AM More Info
From milepost 59 to milepost 60