WA State Highway Alertshttp://www.wsdot.wa.gov/traffic/api/HighwayAlerts/rss.aspxHighway AlertsOITWebAppTeam@wsdot.wa.govHighway Alerts444572http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=444572&action=2On SR 17 between milepost 43 and 50.4 (south of I-90 to Road 5 SE), Monday and Tuesday from 8 a.m. to 6 p.m., expect flagger controlled traffic with delays up to 20 minutes where the contractor is crack sealing the highway. Contact Project Engineer Brian Pearson 509-667-2881<div>Medium Impact</div><div>On SR 17 between milepost 43 and 50.4 (south of I-90 to Road 5 SE), Monday and Tuesday from 8 a.m. to 6 p.m., expect flagger controlled traffic with delays up to 20 minutes where the contractor is crack sealing the highway. Contact Project Engineer Brian Pearson 509-667-2881</div><div>SR 17 Strategic Pavement Preservation #9624 County: Grant Highway: SR 17 Region: North Central Location: MP 42-51 (south of I-90 to Road 5 SE) Description: Central Washington Asphalt, Inc. is the contractor for the region’s 2021 Strategic Pavement Preservation project. Work will include crack seal, pothole repair, and chipseal. Locations selected for this season are US 2 (MP 78-90), SR 17 (MP 42-51), SR 24 (43-63), SR 26 (MP 18-32), US 97A (MP 236-240), SR 170 (MP 2-4), SR 172 (MP 0-18). Work schedule: Monday and Tuesday from 8 a.m. to 6 p.m., expect flagger controlled traffic with delays up to 20 minutes where the contractor is crack sealing the highway. Contact: Project Engineer Brian Pearson 509-667-2881</div>2021-03-05T12:01:31-08:00437527http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=437527&action=2SR 20, the North Cascades Highway, is closed for the season in both directions between milepost 134, approximately 12 miles east of Newhalem and milepost 177 at Early Winters.<div>High Impact</div><div>SR 20, the North Cascades Highway, is closed for the season in both directions between milepost 134, approximately 12 miles east of Newhalem and milepost 177 at Early Winters.</div><div></div>2021-01-06T07:45:39-08:00431538http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=431538&action=2SR-26 from Colfax to Washtucna: bare and dry.<div>Low Impact</div><div>SR-26 from Colfax to Washtucna: bare and dry.</div>2021-03-06T22:20:41-08:00431539http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=431539&action=2SR-26 from US-395 to Washtucna: bare and dry.<div>Low Impact</div><div>SR-26 from US-395 to Washtucna: bare and dry.</div>2021-03-06T22:21:48-08:00431529http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=431529&action=2I-90 from Ritzville to SR-904: bare and dry.<div>Low Impact</div><div>I-90 from Ritzville to SR-904: bare and dry.</div>2021-03-06T23:27:51-08:00431530http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=431530&action=2I-90 from SR-904 to US-195. bare and dry.<div>Low Impact</div><div>I-90 from SR-904 to US-195. bare and dry.</div>2021-03-06T23:28:01-08:00431531http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=431531&action=2I-90 from US-195 to Broadway: bare and dry.<div>Low Impact</div><div>I-90 from US-195 to Broadway: bare and dry.</div>2021-03-06T23:28:11-08:00431532http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=431532&action=2I-90 from Broadway to Idaho State Line: bare and dry.<div>Low Impact</div><div>I-90 from Broadway to Idaho State Line: bare and dry.</div>2021-03-06T23:28:22-08:00431553http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=431553&action=2SR 20, Sherman Pass is: bare and dry, with ice in places. There are no restrictions at this time.<div>Low Impact</div><div>SR 20, Sherman Pass is: bare and dry, with ice in places. There are no restrictions at this time.</div>2021-03-06T23:29:01-08:00434512http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=434512&action=2The Echo and Wanapum viewpoints on both eastbound and westbound I-90 overlooking the Columbia River and Vantage are closed for the winter.<div>Low Impact</div><div>The Echo and Wanapum viewpoints on both eastbound and westbound I-90 overlooking the Columbia River and Vantage are closed for the winter.</div><div></div>2020-12-07T11:53:13-08:00417003http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=417003&action=2One-way alternating traffic in place following several feet of recent roadway settlement. WSDOT will continue to monitor the roadway for further settlement issues. Loads are restricted to no wider than 14 feet to provide clearance. A contract to repair the roadway following widespread damages throughout Washington due to natural disaster is currently underway. A timeline for permanent repairs has not been shared yet. This is the second, latest slide discovered along US 101 at Cosi Hill.<div>Medium Impact</div><div>One-way alternating traffic in place following several feet of recent roadway settlement. WSDOT will continue to monitor the roadway for further settlement issues. Loads are restricted to no wider than 14 feet to provide clearance. A contract to repair the roadway following widespread damages throughout Washington due to natural disaster is currently underway. A timeline for permanent repairs has not been shared yet. This is the second, latest slide discovered along US 101 at Cosi Hill.</div><div></div>2020-07-22T10:59:12-07:00424176http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=424176&action=2Crews are replacing three outdated culverts that run under US 101 at Steamboat Creek, Harlow Creek and Fisher Creek between Queets and Kalaloch. The culverts will be replaced with concrete girder bridges and are expected to open up nearly nine miles of potential fish habitat for salmon and resident fish. Work is expected to wrap up at all three sites fall of 2021. Travelers will encounter one-way alternating with a temporary signal around-the-clock.<div>Medium Impact</div><div>Crews are replacing three outdated culverts that run under US 101 at Steamboat Creek, Harlow Creek and Fisher Creek between Queets and Kalaloch. The culverts will be replaced with concrete girder bridges and are expected to open up nearly nine miles of potential fish habitat for salmon and resident fish. Work is expected to wrap up at all three sites fall of 2021. Travelers will encounter one-way alternating with a temporary signal around-the-clock.</div><div></div>2020-11-25T08:22:31-08:00442999http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=442999&action=2Lane closure on US 101 northbound at milepost 1.2 between the Astoria Megler Bridge Signal and the Chinook Tunnel has alternating traffic with flaggers beginning at 6:36 pm on February 15, 2021 until further notice. Use caution in the area and obey flaggers' directions.<div>High Impact</div><div>Lane closure on US 101 northbound at milepost 1.2 between the Astoria Megler Bridge Signal and the Chinook Tunnel has alternating traffic with flaggers beginning at 6:36 pm on February 15, 2021 until further notice. Use caution in the area and obey flaggers' directions.</div>2021-02-15T18:51:21-08:00417006http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=417006&action=2Crews are removing <a href=" https://www.wsdot.wa.gov/projects/us101/bagley-creek-siebert-creek/home "> multiple barriers </a> to fish under US 101 between Sequim and Port Angeles at Bagley and Siebert Creeks for improved fish passage which will require around-the-clock construction, shifted lanes and reduced speeds through fall of 2021. Any highway closures will be announced in advance.<div>High Impact</div><div>Crews are removing <a href=" https://www.wsdot.wa.gov/projects/us101/bagley-creek-siebert-creek/home "> multiple barriers </a> to fish under US 101 between Sequim and Port Angeles at Bagley and Siebert Creeks for improved fish passage which will require around-the-clock construction, shifted lanes and reduced speeds through fall of 2021. Any highway closures will be announced in advance.</div><div></div>2020-10-08T10:49:05-07:00431535http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=431535&action=2US-195 from Idaho State line to Pullman: bare and dry.<div>Low Impact</div><div>US-195 from Idaho State line to Pullman: bare and dry.</div>2021-03-06T22:20:18-08:00431533http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=431533&action=2US-195 from Rosalia to Spokane bare and dry.<div>Low Impact</div><div>US-195 from Rosalia to Spokane bare and dry.</div>2021-03-06T22:21:09-08:00431534http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=431534&action=2US-195 from Pullman to Rosalia: bare and dry.<div>Low Impact</div><div>US-195 from Pullman to Rosalia: bare and dry.</div>2021-03-06T22:21:26-08:00409531http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=409531&action=2Right Lane Closure on US 195 SB at MP 81.5 near Cornwall Road for Bridge work near Spangle, expect slight delays, Maximum bridge weight 105,500 legal loads only, no over legal axle weights.beginning at 6:53 am on May 29, 2020 until further notice.<div>Medium Impact</div><div>Right Lane Closure on US 195 SB at MP 81.5 near Cornwall Road for Bridge work near Spangle, expect slight delays, Maximum bridge weight 105,500 legal loads only, no over legal axle weights.beginning at 6:53 am on May 29, 2020 until further notice.</div>2021-02-23T07:18:23-08:00410983http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=410983&action=2SR 290 closed for bridge replacement starting near MP 0.5 at the Spokane River, City of Spokane, EB 290 is closed at Hamilton Street, WB 290 is closed at Iron Court, commercial vehicles are diverted to Freya Street, all other traffic can use Mission Street, beginning at 6:18 am on June 3, 2020 until further notice. Follow signed detour route and expect delays. <div>Medium Impact</div><div>SR 290 closed for bridge replacement starting near MP 0.5 at the Spokane River, City of Spokane, EB 290 is closed at Hamilton Street, WB 290 is closed at Iron Court, commercial vehicles are diverted to Freya Street, all other traffic can use Mission Street, beginning at 6:18 am on June 3, 2020 until further notice. Follow signed detour route and expect delays. </div>2020-06-03T08:04:17-07:00417010http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=417010&action=2This <a href=" https://www.wsdot.wa.gov/projects/sr302/elgin-clifton-sr-16/home "> project </a> project removes and replaces outdated culverts under SR 302 with fish passable structures, repaves 8 miles highway, and rebuilds sidewalks and ramps at the Key Center intersection of SR 302/SR 16. Work is currently on winter suspension and will resume in spring of 2021. All work will be done by fall of 2021.<div>High Impact</div><div>This <a href=" https://www.wsdot.wa.gov/projects/sr302/elgin-clifton-sr-16/home "> project </a> project removes and replaces outdated culverts under SR 302 with fish passable structures, repaves 8 miles highway, and rebuilds sidewalks and ramps at the Key Center intersection of SR 302/SR 16. Work is currently on winter suspension and will resume in spring of 2021. All work will be done by fall of 2021.</div><div></div>2020-11-25T08:21:32-08:00431541http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=431541&action=2US-395 from Spokane to Clayton: bare and dry.<div>Low Impact</div><div>US-395 from Spokane to Clayton: bare and dry.</div>2021-03-06T23:28:33-08:00431540http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=431540&action=2US-395 from Clayton to Colville: bare and dry.<div>Low Impact</div><div>US-395 from Clayton to Colville: bare and dry.</div>2021-03-06T22:58:41-08:00444507http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=444507&action=2Closure SR 401 at milepost 1.1. The Dismal Nitch (Megler) Rest Area is closed, beginning at 4:02 pm on February 23, 2021 until further notice. <div>Medium Impact</div><div>Closure SR 401 at milepost 1.1. The Dismal Nitch (Megler) Rest Area is closed, beginning at 4:02 pm on February 23, 2021 until further notice. </div>2021-02-23T16:18:42-08:00444458http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=444458&action=2Closure on SR 401 both directions from milepost 0, near Astoria/ Megler Bridge to milepost 12.10 at SR 4. Use SR101 as an alternate route, from Astoria/Megler Bridge to the intersection of US101 and SR4. Local traffic can access SR401 between milepost 9.2, Knappton Rd and milepost 12.10, at SR4. beginning at 5:08 pm on February 22, 2021 until further notice.<div>Highest Impact</div><div>Closure on SR 401 both directions from milepost 0, near Astoria/ Megler Bridge to milepost 12.10 at SR 4. Use SR101 as an alternate route, from Astoria/Megler Bridge to the intersection of US101 and SR4. Local traffic can access SR401 between milepost 9.2, Knappton Rd and milepost 12.10, at SR4. beginning at 5:08 pm on February 22, 2021 until further notice.</div>2021-02-23T19:14:32-08:00431622http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=431622&action=2SR-410 Chinook Pass is closed for the season due to adverse road and weather conditions. Eastbound traffic is closed at milepost 57, Crystal Mountain Boulevard, 12 miles west of the summit. Westbound traffic is closed at milepost 76.7 Lodgepole, 7 miles east of the summit.<div>Medium Impact</div><div>SR-410 Chinook Pass is closed for the season due to adverse road and weather conditions. Eastbound traffic is closed at milepost 57, Crystal Mountain Boulevard, 12 miles west of the summit. Westbound traffic is closed at milepost 76.7 Lodgepole, 7 miles east of the summit.</div><div></div>2021-03-03T23:11:03-08:00445106http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=445106&action=2On Tuesday, March 9 from 10 a.m. to 2 p.m., travelers can expect alternating conditions with flaggers for pavement repairs.<div>Medium Impact</div><div>On Tuesday, March 9 from 10 a.m. to 2 p.m., travelers can expect alternating conditions with flaggers for pavement repairs.</div><div></div>2021-03-04T16:11:48-08:00437085http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=437085&action=2The highway near Jim Creek experienced five separate slides with significant settlement that have prevented the roadway from opening safely to travelers. Drivers currently follow a signed detour using US 101 and SR 113 until further notice. More details <a href=" https://wsdotblog.blogspot.com/2021/02/plans-to-reopen-sr-112-in-clallam.html "> online </a>.<div>Medium Impact</div><div>The highway near Jim Creek experienced five separate slides with significant settlement that have prevented the roadway from opening safely to travelers. Drivers currently follow a signed detour using US 101 and SR 113 until further notice. More details <a href=" https://wsdotblog.blogspot.com/2021/02/plans-to-reopen-sr-112-in-clallam.html "> online </a>.</div><div></div>2021-02-08T09:02:55-08:00436618http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=436618&action=2Closure on SR 112 both directions from milepost 31.4 to milepost 38.9 near Bear Creek-W Twin River Rd beginning at 8:30 am on December 24, 2020 until further notice. This is due to multiple slides. <div>Highest Impact</div><div>Closure on SR 112 both directions from milepost 31.4 to milepost 38.9 near Bear Creek-W Twin River Rd beginning at 8:30 am on December 24, 2020 until further notice. This is due to multiple slides. </div>2021-01-01T19:51:21-08:00431731http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=431731&action=2SR-123 Cayuse Pass is closed for the season due to adverse road and weather conditions. The closure is from the Arch at the park boundary near milepost 2 to the junction of SR 123 and SR 410.<div>High Impact</div><div>SR-123 Cayuse Pass is closed for the season due to adverse road and weather conditions. The closure is from the Arch at the park boundary near milepost 2 to the junction of SR 123 and SR 410.</div><div></div>2020-11-12T12:49:44-08:00438483http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=438483&action=2Travelers will notice a new traffic signal at the intersection of Southeast Sedgwick Road (SR 160) and Phillips Road Southeast. The new traffic signal is intended to help reduce the risk of collisions at the intersection by regulating when drivers can turn to and from Phillips Road.<div>High Impact</div><div>Travelers will notice a new traffic signal at the intersection of Southeast Sedgwick Road (SR 160) and Phillips Road Southeast. The new traffic signal is intended to help reduce the risk of collisions at the intersection by regulating when drivers can turn to and from Phillips Road.</div><div></div>2021-01-14T10:01:19-08:00445255http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=445255&action=2Collision on SR 162 eastbound at milepost 4 near 96th St E beginning at 12:05 am on March 7, 2021 until further notice. The road is fully blocked.<div>Highest Impact</div><div>Collision on SR 162 eastbound at milepost 4 near 96th St E beginning at 12:05 am on March 7, 2021 until further notice. The road is fully blocked.</div>2021-03-07T00:08:24-08:00445215http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=445215&action=2Road work on SR 509 both directions at milepost 3.99 near Taylor Way beginning at 12:29 am on March 6, 2021 until about 4:00 am on March 7, 2021. <div>High Impact</div><div>Road work on SR 509 both directions at milepost 3.99 near Taylor Way beginning at 12:29 am on March 6, 2021 until about 4:00 am on March 7, 2021. </div>2021-03-06T00:31:48-08:00445256http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=445256&action=2Collision on SR 512 eastbound at milepost 2.22 near SR 7/Pacific Ave beginning at 12:12 am on March 7, 2021 until further notice. All lanes are blocked.<div>Highest Impact</div><div>Collision on SR 512 eastbound at milepost 2.22 near SR 7/Pacific Ave beginning at 12:12 am on March 7, 2021 until further notice. All lanes are blocked.</div>2021-03-07T00:15:07-08:00445230http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=445230&action=2On SR 520 eastbound & westbound from Montlake Blvd (MP 1) to 92nd Ave NE (MP 5) all lanes are closed.<div>Highest Impact</div><div>On SR 520 eastbound & westbound from Montlake Blvd (MP 1) to 92nd Ave NE (MP 5) all lanes are closed.</div><div></div>2021-03-06T09:13:06-08:00443146http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=443146&action=2Flammable cargo is prohibited on SR 520 eastbound & westbound from Montlake Blvd (MP 1) to 84th Ave NE (MP 5).<div>Medium Impact</div><div>Flammable cargo is prohibited on SR 520 eastbound & westbound from Montlake Blvd (MP 1) to 84th Ave NE (MP 5).</div><div></div>2021-02-22T10:10:10-08:00431536http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=431536&action=2US-2 from Spokane to Newport: bare and dry.<div>Low Impact</div><div>US-2 from Spokane to Newport: bare and dry.</div>2021-03-06T23:27:16-08:00431537http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=431537&action=2US-2 from I-90 to Davenport: bare and dry.<div>Low Impact</div><div>US-2 from I-90 to Davenport: bare and dry.</div>2021-03-06T23:27:25-08:00441721http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=441721&action=2There is an emergency closure of US 2 northeast of Wenatchee from MP 142 to MP 144, just west of Waterville due to a rock slide in Pine Canyon. There is no detour available and motorists are encouraged to take an alternate route. This will be an extended closure and there is currently no estimated date for reopening.<div>High Impact</div><div>There is an emergency closure of US 2 northeast of Wenatchee from MP 142 to MP 144, just west of Waterville due to a rock slide in Pine Canyon. There is no detour available and motorists are encouraged to take an alternate route. This will be an extended closure and there is currently no estimated date for reopening.</div><div>US 2 Pine Canyon Emergency Slide Repairs #MS8489 County: Douglas Highway: US 2 Region: North Central Location: MP 143 (Orondo to Waterville) Description: A contractor is removing unstable rock, repairing anchors and netting, and removing debris from a rockslide that occurred in February. Work schedule: US 2 Pine Canyon is currently closed to traffic between Orondo and Waterville. There are no official detours, but alternative routes for non-freight travel are available on McNeil Canyon Rd. and Badger Mountain Rd. The road is scheduled to be reopened no later than March 25. Contact: Project Engineer James Reynolds 509-667-2861</div>2021-03-05T12:05:38-08:00445253http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=445253&action=2Road work on I-5 southbound from milepost 123.4 near Thorne Ln SW to milepost 122.2 near Lakewood South City Limits beginning at 10:30 pm on March 6, 2021 until about 5:30 am on March 7, 2021. <div>High Impact</div><div>Road work on I-5 southbound from milepost 123.4 near Thorne Ln SW to milepost 122.2 near Lakewood South City Limits beginning at 10:30 pm on March 6, 2021 until about 5:30 am on March 7, 2021. </div>2021-03-06T22:30:47-08:00445254http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=445254&action=2Road work on I-5 northbound at milepost 123.58 near Thorne Ln SW beginning at 10:35 pm on March 6, 2021 until about 5:30 am on March 7, 2021. The on ramp from Thorne Ln SW to I5 northbound is closed.<div>High Impact</div><div>Road work on I-5 northbound at milepost 123.58 near Thorne Ln SW beginning at 10:35 pm on March 6, 2021 until about 5:30 am on March 7, 2021. The on ramp from Thorne Ln SW to I5 northbound is closed.</div>2021-03-06T22:36:49-08:00445257http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=445257&action=2Update 12:41 AM : On I-5 northbound just south of SR 531 (MP 205) there is a collision blocking the right lane and the center lane. Medical Aid, Fire Assistance, the State Patrol, and Marysville Police have arrived on the scene.<div>Highest Impact</div><div>Update 12:41 AM : On I-5 northbound just south of SR 531 (MP 205) there is a collision blocking the right lane and the center lane. Medical Aid, Fire Assistance, the State Patrol, and Marysville Police have arrived on the scene.</div><div></div>2021-03-07T00:41:04-08:00437236http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=437236&action=2Beginning Monday, Jan. 4, until further notice: All freight trucks will encounter a traffic shift to use the center lane on northbound I-5 along the Lewis River Bridge, between mileposts 19.36 and 20.0, just south of Woodland. Note: All travelers should slow down through the area and freight traffic should watch for advanced signs advising them when to shift to use the center lane.<div>Medium Impact</div><div>Beginning Monday, Jan. 4, until further notice: All freight trucks will encounter a traffic shift to use the center lane on northbound I-5 along the Lewis River Bridge, between mileposts 19.36 and 20.0, just south of Woodland. Note: All travelers should slow down through the area and freight traffic should watch for advanced signs advising them when to shift to use the center lane.</div><div></div>2020-12-30T13:35:32-08:00441955http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=441955&action=2Travel Alert: Drivers on southbound I-5 using exit 133 to I-705 and State Route 7 will need to be in the right lane of SB I-5 in Fife before the Port of Tacoma Road overpass to access I-705 and SR 7. This temporary change to the exit location will be in place through spring 2021.<div>Medium Impact</div><div>Travel Alert: Drivers on southbound I-5 using exit 133 to I-705 and State Route 7 will need to be in the right lane of SB I-5 in Fife before the Port of Tacoma Road overpass to access I-705 and SR 7. This temporary change to the exit location will be in place through spring 2021.</div><div></div>2021-02-04T13:02:37-08:00427996http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=427996&action=2Beginning Oct. 5 through Sept. 13, 2021: Travelers in both directions of SR 6, near Twin Oaks Road can expect traffic switched to a 2-lane 25 mph detour bypassing the closure.  Work includes excavation for bridge piers, bridge construction and culvert removal/installation.<div>High Impact</div><div>Beginning Oct. 5 through Sept. 13, 2021: Travelers in both directions of SR 6, near Twin Oaks Road can expect traffic switched to a 2-lane 25 mph detour bypassing the closure.  Work includes excavation for bridge piers, bridge construction and culvert removal/installation.</div><div>Note: The speed limit through the area has been temporarily reduced to 25 mph through the work zone and will remain in place until construction is complete.</div>2020-10-09T10:05:29-07:00445104http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=445104&action=2On Tuesday, March 9 from 9 a.m. to 4 p.m., travelers can expect an eastbound US 12 single lane closure just outside of Aberdeen for pavements repairs.<div>Medium Impact</div><div>On Tuesday, March 9 from 9 a.m. to 4 p.m., travelers can expect an eastbound US 12 single lane closure just outside of Aberdeen for pavements repairs.</div><div></div>2021-03-04T16:11:08-08:00445252http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=445252&action=2Road work on SR 16 westbound from milepost 3 near S 12th St to milepost 10.7 near Olympic Dr NW beginning at 10:15 pm on March 6, 2021 until about 3:00 am on March 7, 2021. <div>High Impact</div><div>Road work on SR 16 westbound from milepost 3 near S 12th St to milepost 10.7 near Olympic Dr NW beginning at 10:15 pm on March 6, 2021 until about 3:00 am on March 7, 2021. </div>2021-03-06T22:29:44-08:00432725http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=432725&action=2Alternating one-way traffic controlled by a temporary signal is in place around-the-clock through spring 2021 on the SR 107 Chehalis River Bridge near Montesano. Construction crews are rehabilitating the bridge.<div>Medium Impact</div><div>Alternating one-way traffic controlled by a temporary signal is in place around-the-clock through spring 2021 on the SR 107 Chehalis River Bridge near Montesano. Construction crews are rehabilitating the bridge.</div><div></div>2020-12-21T08:32:56-08:00436649http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=436649&action=2Beginning at dusk on Monday, Dec. 21, until further notice: The gates to the upper level of SR 504/Spirit Lake Memorial Highway, near Coldwater Lake, will be closed for the winter.<div>High Impact</div><div>Beginning at dusk on Monday, Dec. 21, until further notice: The gates to the upper level of SR 504/Spirit Lake Memorial Highway, near Coldwater Lake, will be closed for the winter.</div><div>Please note: The scenic byway will be closed from the Hummocks Trailhead to the Johnston Ridge Observatory, but Coldwater Lake still will be accessible as weather conditions allow. The gates to the upper level of the highway will reopen in Spring 2021.</div>2020-12-21T16:06:10-08:00431204http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=431204&action=2On US 2 at milepost 58 (east of Skykomish), the Iron Goat safety rest area is closed for the season as of Nov. 5, 2020.<div>Lowest Impact</div><div>On US 2 at milepost 58 (east of Skykomish), the Iron Goat safety rest area is closed for the season as of Nov. 5, 2020.</div><div></div>2020-11-05T10:58:44-08:00445162http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=445162&action=2On US 2 at milepost 104 (Peshastin), Tuesday through Friday from 8 a.m. to 4 p.m., be attentive to shoulder closures at the signalized intersection of US 2/Main Street near Peshastin where a technician will be conducting signal detection work on the signal mast arms.<div>Low Impact</div><div>On US 2 at milepost 104 (Peshastin), Tuesday through Friday from 8 a.m. to 4 p.m., be attentive to shoulder closures at the signalized intersection of US 2/Main Street near Peshastin where a technician will be conducting signal detection work on the signal mast arms.</div><div>US 2 Signal Detection (Peshastin) County: Chelan Highway: US 2 Region: North Central Location: MP 104 Description: A technician will be conducting signal detection work on the signal mast arms. Work schedule: Tuesday through Friday from 8 a.m. to 4 p.m., be attentive to shoulder closures at the signalized intersection of US 2/Main Street near Peshastin. Contact: NCR Communications 509-860-0000</div>2021-03-05T11:57:06-08:00445182http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=445182&action=2Monday, March 8 to the morning of Tuesday, March 9 – The northbound I-5 off-ramp to SR 99 will close from 9 p.m. to 5 a.m.<div>Medium Impact</div><div>Monday, March 8 to the morning of Tuesday, March 9 – The northbound I-5 off-ramp to SR 99 will close from 9 p.m. to 5 a.m.</div><div></div>2021-03-05T15:22:30-08:00445189http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=445189&action=2Monday, March 8 to the morning of Friday, March 12 – The northbound I-5 off-ramp to 236th Street will close from 11 p.m. to 5 a.m.<div>Medium Impact</div><div>Monday, March 8 to the morning of Friday, March 12 – The northbound I-5 off-ramp to 236th Street will close from 11 p.m. to 5 a.m.</div><div></div>2021-03-05T15:35:28-08:00434041http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=434041&action=2Monday, March 8, to the afternoon of Thursday, March 11 – The I-5 Silver Lake rest area will close from 8 a.m. Monday to noon Thursday for scheduled maintenance.<div>High Impact</div><div>Monday, March 8, to the afternoon of Thursday, March 11 – The I-5 Silver Lake rest area will close from 8 a.m. Monday to noon Thursday for scheduled maintenance.</div><div></div>2020-12-01T14:18:26-08:00445183http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=445183&action=2Monday, March 8 to the morning of Tuesday, March 9 – The northbound I-5 off-ramp to SR 527 will close from 9 p.m. to 5 a.m.<div>Medium Impact</div><div>Monday, March 8 to the morning of Tuesday, March 9 – The northbound I-5 off-ramp to SR 527 will close from 9 p.m. to 5 a.m.</div><div></div>2021-03-05T15:23:18-08:00430305http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=430305&action=2On SR 17 north of Soap Lake, the Blue Lake safety rest area is closed for the season as of Oct. 26, 2020. Contact: NCR Communications 509-667-2815<div>Lowest Impact</div><div>On SR 17 north of Soap Lake, the Blue Lake safety rest area is closed for the season as of Oct. 26, 2020. Contact: NCR Communications 509-667-2815</div><div></div>2020-10-30T11:55:58-07:00445196http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=445196&action=2Wednesday, March 10 – The left lane of northbound I-5 at Birch Bay Lynden Road will close from 8 a.m. to 3:30 p.m.<div>Medium Impact</div><div>Wednesday, March 10 – The left lane of northbound I-5 at Birch Bay Lynden Road will close from 8 a.m. to 3:30 p.m.</div><div></div>2021-03-05T17:45:03-08:00441473http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=441473&action=2Saturday, Feb. 6 – Traffic will alternate on SR 20 at milepost 123.47 from 7 a.m. to 3 p.m.<div>Medium Impact</div><div>Saturday, Feb. 6 – Traffic will alternate on SR 20 at milepost 123.47 from 7 a.m. to 3 p.m.</div><div></div>2021-01-29T10:24:59-08:00445188http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=445188&action=2Monday, March 8 to the morning of Friday, March 12 – The SR 104 on-ramp to northbound I-5 will close from 8 p.m. to 4 a.m. nightly.<div>Medium Impact</div><div>Monday, March 8 to the morning of Friday, March 12 – The SR 104 on-ramp to northbound I-5 will close from 8 p.m. to 4 a.m. nightly.</div><div></div>2021-03-05T15:31:10-08:00443233http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=443233&action=2Monday, Feb. 22, to the morning of Saturday, March 13 - The eastbound SR 520 off-ramp to 148th will close from 10 p.m. to 5 a.m. nightly.<div>Medium Impact</div><div>Monday, Feb. 22, to the morning of Saturday, March 13 - The eastbound SR 520 off-ramp to 148th will close from 10 p.m. to 5 a.m. nightly.</div><div></div>2021-02-19T11:40:58-08:00443235http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=443235&action=2Monday, Feb. 22, to the morning of Saturday, March 13 - The eastbound SR 520 off-ramp to 40th Street will close from 10 p.m. to 5 a.m. daily.<div>Medium Impact</div><div>Monday, Feb. 22, to the morning of Saturday, March 13 - The eastbound SR 520 off-ramp to 40th Street will close from 10 p.m. to 5 a.m. daily.</div><div></div>2021-02-19T11:54:30-08:00445186http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=445186&action=2Tuesday, March 9 to the morning of Wednesday, March 10 – The left lane of southbound SR 529 near Ross Avenue will close from 9 p.m. to 4 a.m.<div>Medium Impact</div><div>Tuesday, March 9 to the morning of Wednesday, March 10 – The left lane of southbound SR 529 near Ross Avenue will close from 9 p.m. to 4 a.m.</div><div></div>2021-03-05T15:28:59-08:00445184http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=445184&action=2Monday, March 8 to the morning of Tuesday, March 9 – The right lane of southbound SR 529 at Ross Avenue will close from 9 p.m. to 4 a.m.<div>Medium Impact</div><div>Monday, March 8 to the morning of Tuesday, March 9 – The right lane of southbound SR 529 at Ross Avenue will close from 9 p.m. to 4 a.m.</div><div></div>2021-03-05T15:26:09-08:00445185http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=445185&action=2Tuesday, March 9 to the morning of Wednesday, March 10 – The left lane of northbound SR 529 near Steamboat Slough Bridge will close from 9 p.m. to 4 a.m.<div>Medium Impact</div><div>Tuesday, March 9 to the morning of Wednesday, March 10 – The left lane of northbound SR 529 near Steamboat Slough Bridge will close from 9 p.m. to 4 a.m.</div><div></div>2021-03-05T15:27:18-08:00445095http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=445095&action=2Friday, March 5, to the morning of Sunday, March 7 - The southbound SR 99 Duwamish Bridge (also known as the First Avenue South bridge) will close from 9 p.m to 6 a.m. nightly.<div>High Impact</div><div>Friday, March 5, to the morning of Sunday, March 7 - The southbound SR 99 Duwamish Bridge (also known as the First Avenue South bridge) will close from 9 p.m to 6 a.m. nightly.</div><div></div>2021-03-04T14:43:54-08:00445097http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=445097&action=2Wednesday, March 10 to the afternoon of Monday, March 15 - Two lanes of the southbound SR 99 Duwamish Bridge (also known as the First Avenue South bridge) will be closed 24 hours a day from noon Wednesday to noon Monday.<div>High Impact</div><div>Wednesday, March 10 to the afternoon of Monday, March 15 - Two lanes of the southbound SR 99 Duwamish Bridge (also known as the First Avenue South bridge) will be closed 24 hours a day from noon Wednesday to noon Monday.</div><div></div>2021-03-04T14:45:58-08:00445197http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=445197&action=2Wednesday, March 10 to the afternoon of Monday, March 15 - Two lanes of the southbound SR 99 Duwamish Bridge (also known as the First Avenue South bridge) will be closed 24 hours a day from noon Wednesday to noon Monday.<div>Medium Impact</div><div>Wednesday, March 10 to the afternoon of Monday, March 15 - Two lanes of the southbound SR 99 Duwamish Bridge (also known as the First Avenue South bridge) will be closed 24 hours a day from noon Wednesday to noon Monday.</div><div></div>2021-03-05T17:46:09-08:00443041http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=443041&action=2Utility crews will close US 101 near Old Gardiner Road on 1 p.m., Wednesday, Feb. 24, for up to 10 minutes. The work is required to allow crews to place communication lines across the highway. Travelers are encouraged to expect delays and consider alternate routes.<div>Medium Impact</div><div>Utility crews will close US 101 near Old Gardiner Road on 1 p.m., Wednesday, Feb. 24, for up to 10 minutes. The work is required to allow crews to place communication lines across the highway. Travelers are encouraged to expect delays and consider alternate routes.</div><div></div>2021-02-16T14:59:06-08:00407084http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=407084&action=2On US 2/97 near Cashmere (milepost 110), the eastbound off ramp and westbound turn lane to W. Cashmere Bridge/Goodwin Rd. will be closed. Contact: Chelan County Public Works 509-667-6415<div>Medium Impact</div><div>On US 2/97 near Cashmere (milepost 110), the eastbound off ramp and westbound turn lane to W. Cashmere Bridge/Goodwin Rd. will be closed. Contact: Chelan County Public Works 509-667-6415</div><div>West Cashmere Bridge Replacement Project (Chelan County) County: Chelan Highway: US 2/97 Region: North Central Location: MP 110 Description: A contractor for Chelan County will remove and replace the failing W. Cashmere Bridge. Eastbound exit to bridge will be closed until project completion in 2021. Expect lane shift, speed reductions and intermittent flagger controlled traffic as the project progresses. Work schedule: The eastbound off ramp and westbound turn lane to W. Cashmere Bridge/Goodwin Rd. will be closed. Contact: Chelan County Public Works 509-667-6415 https://www.co.chelan.wa.us/public-works/pages/west-cashmere-bridge-replacement-crp-693</div>2020-10-06T14:58:37-07:00445163http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=445163&action=2On US 2 between milepost 105 and 119 (Don Senn Memorial Interchange to Wenatchee), Monday through Thursday from 8 a.m. to 3:30 p.m., expect flagger-controlled traffic and lane shifts with some delays where the crew is repairing guardrail on the highway.<div>Lowest Impact</div><div>On US 2 between milepost 105 and 119 (Don Senn Memorial Interchange to Wenatchee), Monday through Thursday from 8 a.m. to 3:30 p.m., expect flagger-controlled traffic and lane shifts with some delays where the crew is repairing guardrail on the highway.</div><div>US 2 Guardrail Repair (Don Senn Memorial Interchange to Wenatchee) County: Chelan Highway: US 2 Region: North Central Location: MP 105-119 Description: A maintenance crew will install 200 feet of guardrail along the highway from east of the Don Senn Memorial Interchange/Big Y to Wenatchee. Work schedule: Monday through Thursday from 8 a.m. to 3:30 p.m., expect flagger-controlled traffic and lane shifts with some delays where the crew is repairing guardrail on the highway. Contact: NCR Communications 509-860-0000</div>2021-03-05T11:59:47-08:00444574http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=444574&action=2On SR 17 between milepost 48 and 50 (railroad crossing south of Road M), The road is closed at the work zone and will reopen no later than Monday, March 8 at 6 p.m. Monday through Thursday from 6:30 a.m. to 5 p.m., expect lane shifts and flagger controlled traffic with delays where the contractor is widening the east side of the highway. A speed limit reduction of 45 m.p.h. will be in place through the work zone.<div>High Impact</div><div>On SR 17 between milepost 48 and 50 (railroad crossing south of Road M), The road is closed at the work zone and will reopen no later than Monday, March 8 at 6 p.m. Monday through Thursday from 6:30 a.m. to 5 p.m., expect lane shifts and flagger controlled traffic with delays where the contractor is widening the east side of the highway. A speed limit reduction of 45 m.p.h. will be in place through the work zone.</div><div>SR 17 S. of Rd. M SE Railroad Crossing Improvements #9628 County: Grant Highway: SR 17 Region: North Central Location: MP 48 (south of I-90 near Road M) Description: This project will provide safety improvements to the rail crossing, adding pull out lanes for vehicles that are required by law to stop at RR crossings. Additionally, a new cantilever with railroad flashing LED lights, an active advanced warning system, beam guardrail, permanent signing, and pavement markings will be added. Work schedule: As of Friday, March 5, the road is closed with signed detour to allow a contractor for Columbia Basin Railroad to install a new concrete railroad crossing. The road will reopen no later than Monday, March 8 at 6 p.m. Monday through Thursday from 6:30 a.m. to 5 p.m., expect lane shifts and flagger controlled traffic with delays where the contractor is widening the east side of the highway. A speed limit reduction of 45 m.p.h. will be in place through the work zone. Contact: Project Engineer James Reynolds 509-667-2861</div>2021-03-05T12:04:20-08:00445166http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=445166&action=2On SR 170 from milepost 2 to 4 (City of Warden), Wednesday only from 8 a.m. to 6 p.m., expect flagger controlled traffic with delays up to 20 minutes where the contractor is crack sealing the highway.<div>Medium Impact</div><div>On SR 170 from milepost 2 to 4 (City of Warden), Wednesday only from 8 a.m. to 6 p.m., expect flagger controlled traffic with delays up to 20 minutes where the contractor is crack sealing the highway.</div><div>SR 170 Strategic Pavement Preservation #9624 County: Grant Highway: SR 170 Region: North Central Location: MP 2-4 (City of Warden) Description: Central Washington Asphalt, Inc. is the contractor for the region’s 2021 Strategic Pavement Preservation project. Work will include crack seal, pothole repair, and chipseal. Locations selected for this season are US 2 (MP 78-90), SR 17 (MP 42-51), SR 24 (43-63), SR 26 (MP 18-32), US 97A (MP 236-240), SR 170 (MP 2-4), SR 172 (MP 0-18). Work schedule: Monday only, from 8 a.m. to 6 p.m., expect flagger controlled traffic with delays up to 20 minutes where the contractor is crack sealing the highway. Contact: Project Engineer Brian Pearson 509-667-2881</div>2021-03-05T15:53:37-08:00445195http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=445195&action=2Wednesday, March 10 to the morning of Thursday, March 11– The right lane of northbound I-5 between SR 532 and 300th Street NW will close 10 p.m. to 5 a.m.<div>Medium Impact</div><div>Wednesday, March 10 to the morning of Thursday, March 11– The right lane of northbound I-5 between SR 532 and 300th Street NW will close 10 p.m. to 5 a.m.</div><div></div>2021-03-05T17:44:11-08:00445100http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=445100&action=2Saturday, March 6, to the morning of Sunday, March 7 - Two lanes of westbound I-90 between the east end of the Mount Baker Tunnel and Rainier Avenue will close from 9 p.m. to 5 a.m.<div>Medium Impact</div><div>Saturday, March 6, to the morning of Sunday, March 7 - Two lanes of westbound I-90 between the east end of the Mount Baker Tunnel and Rainier Avenue will close from 9 p.m. to 5 a.m.</div><div></div>2021-03-04T14:59:58-08:00445101http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=445101&action=2Thursday, March 11, to the morning of Friday, March 12 - Two lanes of westbound I-90 between the east end of the Mount Baker Tunnel and Rainier Avenue will close from 9 p.m. to 5 a.m.<div>Medium Impact</div><div>Thursday, March 11, to the morning of Friday, March 12 - Two lanes of westbound I-90 between the east end of the Mount Baker Tunnel and Rainier Avenue will close from 9 p.m. to 5 a.m.</div><div></div>2021-03-04T15:02:21-08:00445030http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=445030&action=27 a.m. to noon Thursday, March 18 - Flammable cargo will be prohibited in the I-90 Mount Baker Tunnel and Mercer Island Lid from 7 a.m. to noon on Thursday, March 18. Due to a long-term flammable cargo restriction on SR 520 in Montlake, drivers should use other alternate routes, like I-405 and SR 522, to travel around Lake Washington.<div>High Impact</div><div>7 a.m. to noon Thursday, March 18 - Flammable cargo will be prohibited in the I-90 Mount Baker Tunnel and Mercer Island Lid from 7 a.m. to noon on Thursday, March 18. Due to a long-term flammable cargo restriction on SR 520 in Montlake, drivers should use other alternate routes, like I-405 and SR 522, to travel around Lake Washington.</div><div></div>2021-03-03T15:34:35-08:00442511http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=442511&action=2Tuesday, Feb. 16, to the afternoon of Friday, March 12 - One right lane of eastbound I-90 between SR 900 and 150th Avenue SE will close from 5 a.m. to 2 p.m. daily on weekdays.<div>Medium Impact</div><div>Tuesday, Feb. 16, to the afternoon of Friday, March 12 - One right lane of eastbound I-90 between SR 900 and 150th Avenue SE will close from 5 a.m. to 2 p.m. daily on weekdays.</div><div></div>2021-02-12T14:22:05-08:00442512http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=442512&action=2Monday, Feb. 16, to the afternoon of Friday, March 12 - One right lane of westbound I-90 between SR 900 and 150th Avenue SE will close from 10 a.m. to 5 p.m. daily on weekdays.<div>Medium Impact</div><div>Monday, Feb. 16, to the afternoon of Friday, March 12 - One right lane of westbound I-90 between SR 900 and 150th Avenue SE will close from 10 a.m. to 5 p.m. daily on weekdays.</div><div></div>2021-02-12T14:23:05-08:00445098http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=445098&action=2Friday, March 5, to the morning of Monday, March 8 – Both directions of SR 520 between Montlake Boulevard and 92nd Avenue will close from 11 p.m. Friday and 5 a.m. Monday.<div>High Impact</div><div>Friday, March 5, to the morning of Monday, March 8 – Both directions of SR 520 between Montlake Boulevard and 92nd Avenue will close from 11 p.m. Friday and 5 a.m. Monday.</div><div></div>2021-03-04T14:57:15-08:00443234http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=443234&action=2Monday, Feb. 22, to the morning of Saturday, March 13 - The right lane of eastbound SR 520 between 148th Avenue and 40th Street will close from 10 p.m. to 5 a.m. nightly.<div>Medium Impact</div><div>Monday, Feb. 22, to the morning of Saturday, March 13 - The right lane of eastbound SR 520 between 148th Avenue and 40th Street will close from 10 p.m. to 5 a.m. nightly.</div><div></div>2021-02-19T11:53:25-08:00445181http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=445181&action=2Monday, March 8 to the morning of Friday, March 12 – The right lane of eastbound SR 526 between Seaway Boulevard and Airport Road will close from 9 p.m. to 1 a.m.<div>Medium Impact</div><div>Monday, March 8 to the morning of Friday, March 12 – The right lane of eastbound SR 526 between Seaway Boulevard and Airport Road will close from 9 p.m. to 1 a.m.</div><div></div>2021-03-05T15:19:35-08:00445180http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=445180&action=2Monday, March 8 to the morning of Friday, March 12 – The right lane of westbound SR 526 between Airport Road and Seaway Boulevard will close from 9 p.m. to 1 a.m.<div>Medium Impact</div><div>Monday, March 8 to the morning of Friday, March 12 – The right lane of westbound SR 526 between Airport Road and Seaway Boulevard will close from 9 p.m. to 1 a.m.</div><div></div>2021-03-05T15:18:35-08:00437853http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=437853&action=2Parking is prohibited on the shoulder of SR 542, vehicles will be towed.<div>Lowest Impact</div><div>Parking is prohibited on the shoulder of SR 542, vehicles will be towed.</div><div></div>2021-01-07T12:23:01-08:00386136http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=386136&action=2The City of Spokane: Starting Wednesday, Nov. 20, contractor crews working for the Washington State Department of Transportation will begin constructing the North Spokane Corridor (NSC) Wellesley Avenue interchange. During this time, Wellesley Avenue between Market Street and Freya Street will be closed to pedestrian, bicycle and vehicular traffic. The closure and interchange work will last until the end of 2022. Please use alternate routes.<div>Medium Impact</div><div>The City of Spokane: Starting Wednesday, Nov. 20, contractor crews working for the Washington State Department of Transportation will begin constructing the North Spokane Corridor (NSC) Wellesley Avenue interchange. During this time, Wellesley Avenue between Market Street and Freya Street will be closed to pedestrian, bicycle and vehicular traffic. The closure and interchange work will last until the end of 2022. Please use alternate routes.</div><div></div>2019-11-12T08:53:48-08:00421995http://www.wsdot.wa.gov/traffic/trafficalerts/default.aspx?refnum=421995&action=2Spokane County will have lane restrictions on Geiger Blvd between Soda Road and Electric Ave (Spokane City Limits) for road work starting on August 17th to about June 30, 2021. Thomas Mallon is open. Electric Ave. is open. Local businesses are open, please use extreme caution when travelling inside the work zone. Use other routes and expect delays.<div>Low Impact</div><div>Spokane County will have lane restrictions on Geiger Blvd between Soda Road and Electric Ave (Spokane City Limits) for road work starting on August 17th to about June 30, 2021. Thomas Mallon is open. Electric Ave. is open. Local businesses are open, please use extreme caution when travelling inside the work zone. Use other routes and expect delays.</div><div></div>2021-02-07T10:53:12-08:00