Central Washington Cameras

Alerts

As of 8/20/2018 1:13 PM
Blocking Incidents
  • The SR 162 Spiketon Creek Bridge in Buckley will close Aug. 16 through Sept. 20 around the clock for maintenance and repairs to the driving surface. Travelers will detour using Pioneer Way East to Mundy Loss Road, SR 410 and SR 165. Drivers should expect minor delays.
  • I-90 MP 38 east and westbound off ramp will be closed Monday, Aug. 20 and Tuesday, Aug. 21 from 6 a.m. to 3 p.m. each day for pavement repair work.
Construction Closures
  • I-90 North Bend to Vantage Bridge: Lane closures at various locations this week for construction activity between North Bend and Snoqualmie Pass 24/7. Lane closures in the Cle Elum, Ellensburg, and Vantage vicinity for maintenance work.
  • On SR 285 through Wenatchee Monday 8/20 ONLY, the Easy Street exit off SR 285 will be closed from 7 a.m. to 7 a.m. Tuesday morning while a contractor cuts an open trench for a new sewer line.
    Wednesday night 8/22 ONLY, 8 p.m. to 6 a.m., the city is closing Mission St from 5th to 7th St to install a water line before paving starts.
    Sunday 8/19 thru Thursday 8/23 nights 8 p.m. to 6 a.m., expect lane shifts with lane closures on Mission St. and N. Wenatchee Ave. and some side streets for paving
  • On US 97 north of Blewett Pass Monday through Wednesday 6 a.m. to 7 p.m., expect two way traffic with minimal delays with lane shifts in 3 lane sections, from 2 miles south to 10 miles north of the Blewett Summit for guardrail and guidepost installation.
  • Monday, July 30, to the morning of Friday, Aug. 3 - Up to two lanes of westbound I-90 at Raging River Bridge will be closed from 8 p.m. to 6 a.m. nightly.
  • On SR 24 from Vernita north 10 miles south of Othello, on Monday & Tuesday 8 a.m. to 5 p.m. expect short delays with single lane automated flagger controlled traffic where contractor crews are repairing fire damaged guardrail.
  • On US 97 south of Brewster Monday through Thursday 5:30 a.m. to 5 p.m., expect short delays with single lane flagger controlled traffic where our crew is installing two way left turn lanes.
  • On SR 243 from 2 miles south of Schawana to 3 miles north of Mattawa Monday through Thursday 7:30 a.m. to 4:30 p.m. expect short delays with alternating one way traffic using auto flaggers where our crew is installing rock to fill and restore the west shoulder.
  • Northbound & southbound traffic is alternating on SR 203 from NE 24th St (MP 5) to NE 32nd St (MP 5) due to roadwork.
  • Eastbound & westbound traffic is alternating on SR 900 just west of SE May Valley Rd (MP 17) due to maintenance.
  • US-12, MP 198, Nelson Bridges, west of Yakima, Through Aug. 31 Traffic will be reduced to a single lane 7 days a weeks, 24 hours a day. Traffic should anticipate minor delays.
  • I-82 MP 41 westbound: Monday Aug. 20 from 7 a.m. to 4 p.m. there will be signal lane closure for pavement repair work.
  • I-82 MP 31 to MP 32 both directions: Tuesday Aug. 21 and Wednesday Aug 22 Maintenance crews will be doing bridge inspections from 8 a.m. to 3:30 p.m. expect Lane closures in both directions.
  • SR=903 MP 2 to MP 10: Monday, Aug. 20 to Thursday, Aug. 23 - Single lane closures with piloted traffic between 7 a.m. to 7 p.m. each day for paving.
  • US-12 MP 196 Mapleway RD, between Naches and Yakima: Monday, Aug. 20, No significant traffic impacts anticipated. Tuesday, Aug. 21: Thursday, Aug. 23, Left Lane Closure both Eastbound and Westbound 7 a.m. to 7 p.m. with the median crossover being closed between 8 a.m. to 3 p.m. Friday, Aug. 24, Left Lane Closure both Eastbound and Westbound 7 a.m. and 12 p.m. with the median crossover being closed between 8 a.m. to 12 p.m.
  • US-12 MP 189 to MP 202, Naches to I-82, in both directions: On Tuesday Aug. 21 and Wednesday Aug. 22, crews will be marking the highway with new paint from 7 a.m. to 4 p.m. Watch for slow moving vehicles.
Special Events
  • None reported