Hood Canal Bridge Area Traffic Alerts and Cameras

Traveler Notice

Series of 6-hour SR 104 night closures planned
Crews will close the Hood Canal Bridge to vehicular traffic at 10 p.m. Tuesday, Nov. 27 each night through Saturday, Dec. 1 for construction until 4 a.m. each following morning, and again at 10 p.m. Saturday, Dec. 1 through 7 a.m. Sunday, Dec. 2. During this time, the bridge will be closed and no intermittent openings to traffic will be conducted due to the nature of their work. Drivers are encouraged to plan ahead.

Hood Canal Bridge Mt Walker, SR-101@ 301.5 3 SR 104 - Climbing Hill East SR 104 - Climbing Hill West SR 104 - West of Hood Canal Bridge SR 104 - Wheeler St East SR 104 - Wheeler St West SR 3 - Big Valley Rd North SR 3 - Big Valley Rd South SR 3 - Bridge Way North SR 3 - Bridge Way South SR 3 - Christopherson SR 3 - Equestrian Dr North SR 3 - Equestrian Dr South SR 3 - Hard Rock Way North SR 3 - Hard Rock Way South SR 3 - Pioneer Hill Rd North SR 3 - Pioneer Hill Rd South SR 3 - Scenic Drive North SR 3 - Scenic Drive South SR 3 - South of Hood Canal Bridge SR 3 - Tytler Rd North SR 3 - Tytler Rd South

Scheduled Openings

As of 11/20/2018 12:03 AM

By law, WSDOT is required to open the Hood Canal Bridge drawspan to mariners within one hour’s notice, and motorists are advised to expect up to 60-minute delays with each opening. If no drawspan openings are listed immediately below, no non-military drawspan openings are scheduled.

Listed openings are for maintenance and commercial and pleasure craft only

Hood Canal Bridge

Updated: Tuesday November 20, 2018 12:00 AM

Surface Temp:
Air Temp:
24hr High/Low:
Pressure:
Elevation:
41ºF / 5ºC
42ºF / 6ºC
54ºF / 41ºF
N/A
0ft/0m
Humidity:
Dew Point:
Visibility:
Wind Speed:
Wind Dir:
25%
9ºF
N/A
2 mph
S
Location: 47.86, -122.62
REST OF TONIGHT
Mostly Cloudy
TUESDAY
Partly Cloudy
TUESDAY NIGHT
Rain
WEDNESDAY
Rain