As of 6/24/2019 2:15 AM
Blocking Incidents
  • None reported
Construction Closures
  • High Impact - Sunday, June 23, to the morning of Monday, June 24 – All lanes of the southbound I-5 mainline just south of James Street be closed from 10 p.m. to 4:30 a.m. nightly.
  • US 97A in Chelan, Monday though Friday, 6:30 a.m. to 5:30 p.m. there will be shoulder closures and single lane, flagger controlled traffic with minor delays at the intersection of US 97A and Webster Avenue where the contractor is installing the warning system’s electrical components and concrete sidewalk ramps.
  • On SR 153 near Methow (MP 11.83) Monday through Friday, between 7 a.m. and 7 p.m. there will be flagger controlled, single lane traffic with delays over Bridge #10 (southern most bridge near Methow) where the contractor is completing phase 3 of rehabilitation work on the three bridges between Methow and Carlton. Work is primarily under and around the bridge, so delays will be minimal, primarily when the crew is moving and staging equipment.
  • Sunday, June 23, to the morning of Friday, June 28 - A single lane of westbound 164th Street Southwest at I-5 will close from 9 p.m. to 5 a.m. nightly.
  • Sunday, June 23, to the morning of Friday, June 28 - Up to three lanes of northbound I-5 between SR 104 and 164th Street Southwest will close from 10 p.m. to 7 a.m. nightly.
  • Sunday, June 23, to the morning of Friday, June 28 - The northbound I-5 off-ramp to 220th Street Southwest will close from 11 p.m. to 6 a.m. nightly.
  • Sunday, June 23, to the morning of Friday, June 28 - The SR 104 collector ramp to northbound I-5 will close from 11 p.m. to 5 a.m. nightly.
Special Events
  • None reported