Northeast Washington Cameras

Alerts

As of 3/29/2020 12:01 AM
Blocking Incidents
  • Lane closure with temporary traffic signal on SR 231 MP 74.5 near US 395, just South of Chewelah, beginning at 10:45 am on January 28, 2020 until further notice. Motorists should expect delays.
  • Collision is blocking SR 291 in both directions at milepost 18 approximately 4 miles South of Tum Tum. A detour is in place. Beginning at 11:12 pm on March 28, 2020 until further notice.
Construction Closures
  • Construction on SR 21 both directions at milepost 145.6 near W Fork Sanpoil River until further notice. Drivers will need to be alert approaching the bridge as the temporary structure is a single lane bridge with alternating traffic.
  • The City of Spokane: Starting Wednesday, Nov. 20, contractor crews working for the Washington State Department of Transportation will begin constructing the North Spokane Corridor (NSC) Wellesley Avenue interchange. During this time, Wellesley Avenue between Market Street and Freya Street will be closed to pedestrian, bicycle and vehicular traffic. The closure and interchange work will last until the end of 2022. Please use alternate routes.
  • City of Spokane, the Post Street Bridge is closed to vehicular traffic starting immediately, through Spring of 2020. Use other routes.
  • Spokane County: Geiger Road is closed between Thomas Mallen and Soda Road, through the winter. Detour using Hayford, 53rd and Electric. Amazon access via Thomas Mallen and Geiger Road.
Special Events
  • None reported