South Central Washington Cameras

Alerts

As of 8/20/2018 1:13 PM
Blocking Incidents
  • None reported
Construction Closures
  • I-82 milepost 132 Columbia River Bridge near Plymouth: Eastbound traffic is shifted to the westbound Columbia River bridge into Oregon. The speed limit is reduced to 40 mph. Westbound traffic is reduced to a single lane.
  • On SR 17 at Prior Farms between Othello and Moses Lake, Monday 8/20 ONLY 7 a.m. to 7 p.m., expect lane shifts with up to 20 minute delays for installation of plastic pavement markings.
  • On SR 24 from Vernita north 10 miles south of Othello, on Monday & Tuesday 8 a.m. to 5 p.m. expect short delays with single lane automated flagger controlled traffic where contractor crews are repairing fire damaged guardrail.
  • Monday, Aug. 20 to Friday, Aug. 24: Travelers on both directions of SR 14, between Cliffs Road and Wood Creek Bridge, will be alternated intermittently through a single lane with flaggers and a pilot car, daily from 7 a.m. to 5 p.m., for paving repair work.
  • On SR 243 from 2 miles south of Schawana to 3 miles north of Mattawa Monday through Thursday 7:30 a.m. to 4:30 p.m. expect short delays with alternating one way traffic using auto flaggers where our crew is installing rock to fill and restore the west shoulder.
  • Maintenance on SR 14 both directions at milepost 108 near Cliff's Road - Aluminum Plant. The crew will be alternating traffic through the work zone beginning at 7:11 am on August 20, 2018 until further notice.
  • US-12, MP 198, Nelson Bridges, west of Yakima, Through Aug. 31 Traffic will be reduced to a single lane 7 days a weeks, 24 hours a day. Traffic should anticipate minor delays.
  • I-182 Queensgate Drive Interchange Improvements
    Tuesday & Wednesday, Aug. 21 & 22 - Closure of I-182 eastbound off-ramp onto Queensgate for paving from 8 p.m. to 5 a.m.
  • I-82 MP 41 westbound: Monday Aug. 20 from 7 a.m. to 4 p.m. there will be signal lane closure for pavement repair work.
  • I-82 MP 31 to MP 32 both directions: Tuesday Aug. 21 and Wednesday Aug 22 Maintenance crews will be doing bridge inspections from 8 a.m. to 3:30 p.m. expect Lane closures in both directions.
  • US-12 MP 196 Mapleway RD, between Naches and Yakima: Monday, Aug. 20, No significant traffic impacts anticipated. Tuesday, Aug. 21: Thursday, Aug. 23, Left Lane Closure both Eastbound and Westbound 7 a.m. to 7 p.m. with the median crossover being closed between 8 a.m. to 3 p.m. Friday, Aug. 24, Left Lane Closure both Eastbound and Westbound 7 a.m. and 12 p.m. with the median crossover being closed between 8 a.m. to 12 p.m.
  • SR-241 MP 6.2 to MP 7.3 both directions: Monday, Aug. 20 to Friday, Aug. 24, from 7 a.m. to 5 p.m. there will be shoulder closures for utility work.
  • US-12 MP 189 to MP 202, Naches to I-82, in both directions: On Tuesday Aug. 21 and Wednesday Aug. 22, crews will be marking the highway with new paint from 7 a.m. to 4 p.m. Watch for slow moving vehicles.
  • US 97, MP 62 to MP 74 in both directions: On Monday Aug 20 through Thursday August 23, there will be a mobile striping operation from 6:30 a.m. to 4 p.m.
Special Events
  • None reported