Emergency alert symbol

COVID-19

For the latest COVID-19 health guidance, statistics and resources, visit Coronavirus.wa.gov.

South Central Washington Cameras

Alerts

As of 9/30/2020 9:36 AM
Blocking Incidents
  • I-90 eastbound milepost 137 over the Vantage Bridge, there will be a right lane closure 24 hours a day until Thursday Oct. 1 at 3:30 p.m. Loads over 11 feet wide are prohibited.
  • I-82 both directions milepost 8 to milepost 15, eight miles east of Ellensburg: Through Thursday Oct. 1 from 7 a.m. to 3:30 p.m. each day there will be a left lane closure for shoulder repair work.
Construction Closures
  • Monday, Sept. 28 through Tuesday, Oct. 6: Both directions of SR 14 near Wind River Road, will be fully closed for 45 minutes in duration at the top of each hour, daily from 6 a.m. to 7 p.m., for slope stabilization work.
    Note: At 15 minutes to the hour, each hour, travelers on both directions of SR 14 will be moved through the closure with flaggers.
  • Monday, July 13 until further notice: Travelers on both directions of US 97, between Indian Service Road and Wilson Charley Road, will encounter intermittent single lane closures with flaggers, daily, from 7 a.m. to 5 p.m., for construction of the new bridge.

    Note: The speed limit through the work zone has been temporarily reduced from 65 mph to 40 mph. This speed limit reduction will remain in place throughout construction
  • Maintenance on US 97 northbound at milepost 30.1 near Indian Service Road . The crew will be alternating traffic through the work zone. at 6:43 am on September 30, 2020 until further notice.
  • Maintenance on SR 14 both directions at milepost 123.The crew will be alternating traffic through the work zone beginning at 7:48 am on September 30, 2020 until further notice.
  • Construction on SR 14 both directions at milepost 46 near Nelson Creek Road to milepost 47,near wind river road/Carson junction.Traffic is being alternated through one lane,use caution and follow flaggers,directions beginning at 8:07 am on September 30, 2020 until further notice.
  • SR-240 milepost 33 Richland vicinity: Access to Duportail Rd to and from SR 240 is closed 24 hours a day, seven days a week for roadway construction improvements. Detours are in place. Expect SR 240 in both directions at Duportail Rd intersection to have a single lane closure and speed reduction.
  • I-82 eastbound milepost 33, Fair Ave and the I-82 on ramp, Yakima: Monday through Friday from 3 a.m. to 7 p.m. over the next few weeks, the work zone on Fair Ave. will be limited to a single lane at times and drivers may experience minor delays. The intersection of the I-82 Exit 33A off ramp and Fair Avenue will be flagger controlled between the hours of 3 a.m. and 3 p.m. Monday through Friday, drivers may experience minor delays.
  • US-12 both directions milepost 175 to 185 Junction of US-12 and SR-410: Monday Sept 28 to Thursday Oct 1, between 7 a.m. and 4:30 p.m. travelers should expect single lane pilot car controlled traffic control with 10 minute delays for pavement sealing and preservation work.
Special Events
  • None reported