South Central Washington Cameras

Alerts

As of 6/18/2019 5:40 PM
Blocking Incidents
  • Thursday, June 6: Travelers on both directions of SR 14 between Courtney Road and the entrance at the Chamberlain Lake rest area (milepost 74.0) will be alternated intermittently, through a single-lane with flaggers, from 5:30 a.m. to 8 p.m., for commercial filming.
    Note: During filming, traffic will be held for up to 10 minutes in both directions, to clear road for photography. The Chamberlain Lake Rest Area will be open during filming.
  • I-182 milepost 5 to milepost 7 westbound, there will be a right lane closure from 8:30 a.m. to 3 p.m. for bridge sweeping operations.
  • I-182 eastbound milepost 6 Columbia River Bridge: Monday June 17 and Tuesday June 18 from 8 p.m. to 4 a.m. the right lane will be closed for bridge maintenance. Wednesday June 19 and Thursday June 20 from 8 p.m. to 4 a.m. the two right lanes will be closed for bridge maintenance.
  • I-182 eastbound milepost 12 to 13.5: Wednesday June 19 from 9 a.m. to 1 p.m. there will be a right lane closure for installation of pavement markings.
    I-182 westbound milepost 3 to 3.5: Thursday June 20 from 9 a.m. to 2 p.m. there will be a right lane closure for pavement marking installation.
  • I-182 both directions milepost 5 to 13: Wednesday June 19 from 9 a.m. to 1 p.m. there will be a right lane closure from milepost 12 to milepost 13 for pavement marking operations.
  • I-82 eastbound milepost 15 to 23: Tuesday June 18 through Thursday June 20 from 7 a.m. to 3:30 p.m. there will be a right lane closure for grinding and repaving shoulder.
  • I-82 westbound milepost 30 to 31: Tuesday June 18 and Wednesday June 19 from 9 a.m. to 3:30 p.m. there will be right lane closure Tuesday and a left lane closure on Wednesday for bridge inspection.
    I-82 eastbound milepost 23: Tuesday June 18 to Thursday June 20 from 7 a.m. to 3:30 p.m. there will be a right lane closure for bridge work.
Construction Closures
  • On SR 243 between Vernita and Vantage (MP 0 to 28)- Monday through Thursday, 6 a.m. to 6 p.m., Expect delays of 20 minutes in a single work zone with flaggers and one-way piloted traffic where the contractor is paving and fog sealing.
  • Eastbound I-82 Umatilla bridge to reopen Wednesday afternoon, June 19. I-82 both directions milepost 132: The eastbound traffic is shifted across a detour onto the westbound Columbia River bridge into Oregon 24 hours a day, seven days a week. The speed limit is reduced to 40 mph through the detour. The westbound lanes are reduced to a single lane.
  • SR 22 both directions milepost 35 to 37: Drivers will encounter mobile paint striping operations during the week.
  • I-82 both directions milepost 86 to 91: single lane closures:
    Tuesday June 18, 5 a.m. to 5 p.m. and Friday June 21, 5 a.m. to 5 p.m.
    I-82 Exit 88 shoulder closures and narrow ramps Wednesday June 19 and Thursday June 20, 5 a.m. to 5 p.m.
  • I-82 eastbound milepost 37:
    June 17, 7 p.m. to 6 a.m. left lane closure.
    June 18 - 20, 7 p.m. to 6 a.m. right lane closure.
    June 21, 8 p.m. to 9 a.m. right lane closure.
    I-82 Westbound:
    June 17, 7 p.m. to 6 a.m. right lane closure.
    June 18 - 20, 7 p.m. to 6 a.m. left lane closure.
    June 21, 8 p.m. to 9 a.m. left lane closure.
  • SR-241 milepost 1: Tuesday June 18 from 8:30 a.m. to 6:30 p.m. bridge work will close SR-241 Yakima River Bridges in Mabton Tuesday June 18 from 8:30 a.m. to 6:30 p.m. A detour route will be in place via local roads.
  • Monday, June 17 to Wednesday, June 19: Travelers on both directions of SR 142, between Garrison Road and North Klickitat Street, will be alternated intermittently through a single-lane, with flaggers and a pilot car, daily from 7 a.m. to 5 p.m., for paving resurfacing work.
    Note: During resurfacing work, travelers should expect delays of up to 20 minutes.
  • I-82 Exit 69 Sunnyside Interchange Off/On Ramps:
    Monday June 17 to Friday June 21, traffic should anticipate intermittent shoulder closures and narrow ramps interchanges. Drivers will encounter mobile paint striping operations during the week.
  • I-82 both directions Exit 73 Grandview Interchange Off/On Ramp: Monday June 17 to Friday June 21, traffic should anticipate intermittent shoulder closures and narrow ramps on interchanges.
    Drivers will encounter mobile paint striping operations during the week.
  • I-82 Exit 82 Prosser Interchange Off/On Ramps: Monday June 17 to Friday June 21, traffic should anticipate intermittent shoulder closures and narrow ramps on interchanges. Drivers will encounter mobile paint striping operations during the week.
  • SR-821 both directions milepost 17 to 25: Monday June 17 through Thursday June 20 from 7:30 a.m. to 3:30 p.m. there will be pilot car operation for pavement work.
  • US-12 milepost 150 to 185: Monday to Thursday from 7 a.m. to 4 p.m. there will be short delays for maintenance activities.
Special Events
  • None reported