Southeast Washington Cameras

Alerts

As of 5/21/2019 5:30 AM
Blocking Incidents
  • US-395 southbound milepost 18 to milepost 19: Wednesday May 22 from 9 a.m. to 12 p.m. there will be a right lane closure for sign inspection.
  • I-182 eastbound milepost 13 to milepost 14: Wednesday May 22 from 11 a.m. to 2 p.m. there will be a right lane closure for sign inspection.
Construction Closures
  • Construction on I-90 both directions from milepost 206.9 near SR 21 to milepost 220.1 near Ritzville beginning at 7:48 am on April 15, 2019, until further notice.
  • Construction on US 195 both directions from milepost 62.3 near SR 271 Off-Ramp to milepost 69.9 near Plaza Rd On Ramp beginning at 7:00 pm on May 20, 2019 until further notice. Construction will be night work, Mon-Fri 7:00 pm to 5:00 am.
  • I-82 milepost 132 Columbia River Bridge near Plymouth: Eastbound traffic is shifted to the westbound Columbia River bridge into Oregon. The speed limit is reduced to 40 mph. Westbound traffic is reduced to a single lane.
  • US-12 milepost 404 to 418: Pomeroy to East Alpowa Vicinity: Monday through Thursday, May 23 from 7 a.m. to 5 p.m. and Friday May 24 from 7 a.m. to noon expect single lane piloted traffic control.
  • I-82 milepost 132: Single lane closures Monday May 20 through Thursday May 23, 6 a.m. to 6 p.m.
  • I-182 milepost 3: Wednesday, May 22 through Thursday, May 23 from 8 pm to 12 am Midnight, work will be taking place on the truck apron at the Queensgate Roundabout. Traffic Control will be in place, expect possible delays.
  • US-395 northbound milepost 29 to milepost 38: Wednesday May 22 and Thursday May 23 from 8 a.m. to 3:30 p.m. there will be a right lane closure for pavement sealing.
Special Events
  • None reported