Southeast Washington Cameras

Alerts

As of 3/25/2019 8:51 PM
Blocking Incidents
  • I-182 milepost 6 to milepost 7 – Tuesday, March 26, through Friday, March 29, between 10 a.m. and 2 p.m., there will be a single lane closure in both directions for survey work. Intermittent shoulder closures will also be in place.
  • I-82 eastbound milepost 127 to 129: Monday March 26 from 8 a.m. to 4 p.m. there will be a right lane closure for guardrail repair.
  • US-12 eastbound milepost 294: Tuesday March 26 through Wednesday March 27 from 7 a.m. to 4 p.m. there will be a westbound right lane closure. Thursday March 28 from 7 a.m. to 4 p.m. there will be a westbound left lane closure for bridge washing.
Construction Closures
  • I-82 milepost 132 Columbia River Bridge near Plymouth: Eastbound traffic is shifted to the westbound Columbia River bridge into Oregon. The speed limit is reduced to 40 mph. Westbound traffic is reduced to a single lane.
  • On SR 28 7 a.m. to 9 p.m. in Ephrata Monday through Friday : expect shoulder and sidewalk closures in Ephrata at temporarily closed intersections for saw-cutting. Curb ramp and sidewalk removal work begins north to south.
Special Events
  • None reported