SR 285 Northbound - On SR 285 at milepost 4 (Wenatchee River Bridge), Saturday and Sunday only, expect the closure of the outside northbound lane with slowdowns and longer than normal travel times where a crew is performing a routine bridge inspection.
Last Updated: 4/9/2021 3:49 PM
From milepost 4 to milepost 5
More