Northwest Washington Travel Alerts

Travel Alerts
HIGH IMPACT
I-5
I-5 Northbound - Monday, Sept. 23, to the morning of Friday, Sept. 27 - Crews will close two lanes of northbound I-5 between SR 530 and SR 534 nightly from 7:30 p.m. to 5 a.m. for joint sealing and spall repair.
Last Updated: 9/19/2019 4:04 PM
From milepost 209 to milepost 221 More
HIGH IMPACT
I-5
I-5 Southbound - Saturday, Sept. 21, to the morning of Friday, Sept. 27 - Crews will close two lanes of southbound I-5 between SR 534 and SR 530 nightly from 7:30 p.m. to 5 a.m. for concrete grinding, spall repair and joint sealing work.
Last Updated: 9/19/2019 4:03 PM
From milepost 221 to milepost 209 More
HIGH IMPACT
I-5
I-5 Northbound - Monday, Sept. 23, to the morning of Tuesday, Sept. 24 - Crews will close the on-ramp from Lake Samish Road to northbound I-5 and the right lane of northbound I-5 from 9 p.m. to 4 a.m. for guardrail repair. Crews will set up a signed detour using Old Highway 99 during this work.
Last Updated: 9/19/2019 4:00 PM
At milepost 241 More
MODERATE IMPACT
SR 520
SR 520 Both Directions - Monday, Sept. 23, to the morning of Friday, Sept. 27 – The eastbound SR 520 off-ramp to 40th Street will close from 10 p.m. to 5 a.m. nightly.
Last Updated: 9/19/2019 5:13 PM
At milepost 10 More
MODERATE IMPACT
SR 520
SR 520 Both Directions - Monday, Sept. 23, to the morning of Friday, Sept. 27 – The left lanes in both directions of SR 520 between 148th Avenue Northeast and Northeast 40th Street will close from 10 p.m. to 5 a.m. nightly.
Last Updated: 9/19/2019 5:12 PM
From milepost 9 to milepost 11 More
MODERATE IMPACT
I-5
I-5 Both Directions - Monday, Sept. 23, through the morning of Friday, Sept. 27 - Crews could close I-5 on- and-off ramps between SR 534 and SR 530 nightly from 7:30 p.m. to 5 a.m. for striping work.
Last Updated: 9/19/2019 4:07 PM
From milepost 221 to milepost 209 More
MODERATE IMPACT
I-5
I-5 Both Directions - Monday, Sept. 23, through Friday, Sept. 27 - Crews will close one lane of northbound and southbound I-5 daily between SR 534 and SR 530 for joint sealing and shoulder work.
Last Updated: 9/19/2019 4:06 PM
From milepost 221 to milepost 209 More
MODERATE IMPACT
SR 116
SR 116 Both Directions - Crews for WSDOT and NOSC are working to restore historic tidal channels and fish runs between southern Kilisut Harbor and Oak Bay by constructing a 440' concrete girder bridge along SR 116. During construction, travelers should expect weekday daytime delays as well as reduced speeds with one-way alternating traffic early August 2019 through fall 2020.
Last Updated: 9/17/2019 2:30 PM
At milepost 5 More
Zoom to North Central Seattle
North Central
Western
Alerts Legend

Zoom in on the map to view more routes.
If you do not see the route you are looking for,
no problems have been reported.

Interstate:
I-5 
US Highways:
State Highways:
Countywide:
No Travel Alerts have been reported at this time.