SR 520 Westbound - Update 9:32 AM : On SR 520 westbound just west of Montlake Blvd (MP 1) there is a collision blocking the left lane. The Incident Response Team and the State Patrol have arrived on the scene. Last Updated: 7/22/2019 9:32 AM More Info
At milepost 1
HIGHEST IMPACT
I-5 Southbound - Disabled vehicle on I-5 southbound, at milepost 134.1 near the Tacoma Dome. Beginning at 9:07 am on July 22, 2019 until further notice. The right lane is blocked. Last Updated: 7/22/2019 9:10 AM More Info
At milepost 134
HIGHEST IMPACT
I-5 Northbound - Disabled vehicle on I-5 northbound, at milepost 134.01 near E McKinley Way. Beginning at 9:00 am on July 22, 2019 until further notice. The right, center lane is blocked. Last Updated: 7/22/2019 9:02 AM More Info
At milepost 134
HIGHEST IMPACT
I-5 Southbound - Update 8:28 AM : On the I-5 southbound on-ramp from SR 530 (MP 209) there is a collision blocking the ramp. Medical Aid, Fire Assistance, the Incident Response Team, Tow Assistance, and the State Patrol have arrived on the scene. Last Updated: 7/22/2019 8:28 AM More Info
At milepost 209
HIGHEST IMPACT
US 101 Southbound - Collision on US 101 southbound, at milepost 311.0 near Canal View St. Beginning at 5:43 am on July 22, 2019 until further notice. The southbound lane is blocked. Last Updated: 7/22/2019 5:52 AM More Info
At milepost 311
HIGH IMPACT
US 101 Northbound - Road work on US 101 northbound, from milepost 295.0 near Maple Grove Rd, to milepost 283.0 near the Discovery Bay South City Limits. Beginning at 9:18 am on July 22, 2019 until about 3:00 pm. Last Updated: 7/22/2019 9:22 AM More Info
From milepost 295 to milepost 283
HIGH IMPACT
SR 3 Both Directions - Road work on SR 3, in both directions, from milepost 19.0 to milepost 20.0, near E Grapeview Loop Rd [North-End]. Beginning at 8:54 am on July 22, 2019 until about 2:00 pm. Last Updated: 7/22/2019 8:58 AM More Info
From milepost 19 to milepost 20
HIGH IMPACT
US 12 Both Directions - Road work on US 12, IN both directions, from milepost 21.0 near SR 8, to milepost 9.5 near Devonshire Rd. beginning at 8:49 am on July 22, 2019 until about 4:00 pm. Last Updated: 7/22/2019 8:53 AM More Info
From milepost 21 to milepost 10
HIGH IMPACT
US 101 Both Directions - Road work on US 101, in both directions, at milepost 175.45 near Clearwater Honor Camp Rd. Beginning at 8:32 am on July 22, 2019 until about 4:30 pm. Last Updated: 7/22/2019 8:36 AM More Info
At milepost 175
HIGH IMPACT
US 101 Both Directions - Road work on US 101, in both directions, from milepost 220.0 near Sol Duc Hot Springs Rd, to milepost 222.0. Beginning at 8:11 am on July 22, 2019 until about 7:00 pm. Motorists can expect up to thirty minute delays. Last Updated: 7/22/2019 8:18 AM More Info
From milepost 220 to milepost 222
HIGH IMPACT
US 101 Both Directions - Road work on US 101, in both directions, at milepost 146.5 near Clearwater Rd. Beginning at 8:04 am on July 22, 2019 until about 7:00 pm. Last Updated: 7/22/2019 8:08 AM More Info
At milepost 146
HIGH IMPACT
SR 302 Both Directions - Road work on SR 302, in both directions, at milepost 5.0 near the Mason/Pierce County Line. Beginning at 7:52 am on July 22, 2019 until about 4:00 pm. Last Updated: 7/22/2019 7:57 AM More Info
At milepost 5
HIGH IMPACT
SR 305 Southbound - Road work on SR 305 southbound, at milepost 0.22 near Winslow Way. Beginning at 7:44 am on July 22, 2019 until about 5:00 pm. Last Updated: 7/22/2019 7:45 AM More Info
At milepost 0
HIGH IMPACT
SR 8 Both Directions - Road work on SR 8, in both directions, at milepost 2.0 near Elma Rest Area. Beginning at 7:30 am on July 22, 2019 until about 5:00 pm. Last Updated: 7/22/2019 7:32 AM More Info
At milepost 2
HIGH IMPACT
SR 109 Both Directions - Road work on SR 109, in both directions, at milepost 3.0 near Grays Harbor Blvd. Beginning at 7:26 am on July 22, 2019 until about 6:00 pm. Last Updated: 7/22/2019 7:29 AM More Info
At milepost 3
HIGH IMPACT
SR 7 Both Directions - Road work on SR 7, in both directions, from milepost 23.65 near Pilgrim Rd E, to milepost 25.21 near La Grande South City Limits. Beginning at 6:32 am on July 22, 2019 until about 6:00 pm. A signed detour route is in place. Last Updated: 7/22/2019 6:38 AM More Info
From milepost 24 to milepost 26
HIGH IMPACT
SR 28 Both Directions - SR 28 between Ephrata and Soap Lake (MP 44 to 53)- Monday through Thursday, from 7 a.m. to 7 p.m., expect delays up to 20 minutes with flaggers, lane shifts and alternating one-way traffic between Martin Road and the south end of Ephrata, and between the north end of Ephrata and Soap Lake where the contractor is chip sealing. **travel with care** Last Updated: 7/19/2019 10:34 PM More Info
From milepost 44 to milepost 53
HIGH IMPACT
SR 902 Both Directions - Construction on I-90 at the Medical Lake/SR 902 intersection in both directions at milepost 272.8 near SR 902 beginning at 10:48 am on June 24, 2019 until further notice. Crews will be constructing three new roundabouts and a parallel bridge over I-90. The roundabouts will be built at both the east and westbound ramp terminals to I-90 and at Geiger Blvd. and SR 902. Last Updated: 7/18/2019 7:51 AM More Info
From milepost 12 to milepost 13
HIGH IMPACT
US 2 Both Directions - Construction on US 2 both directions from milepost 292.9 near SR 395 to milepost 295.7 near Farwell Rd beginning at 7:00 am on July 8, 2019, until further notice. Crews will be repaving this section of US 2 from the Division Wye to Farwell Road. Paving will occur at night starting at 7 p.m. during weekdays. Last Updated: 7/9/2019 8:55 AM More Info
From milepost 293 to milepost 296
HIGH IMPACT
SR 506 Both Directions - Beginning at 7 a.m. on Tuesday, June 18, until further notice: Both directions of SR 506, between Telegraph Road and the end of the Lacamas Creek Bridge, will be fully closed, for bridge replacement work.
Note: During construction, travelers will follow a signed detour using South Military Road and SR 505. The bridge closure and detour will remain in place until construction of the new bridge is complete. Last Updated: 6/14/2019 4:59 PM More Info
From milepost 8 to milepost 8
HIGH IMPACT
SR 162 Both Directions - The SR 162 Spiketon Creek Bridge has been permanently closed due to recently discovered pier settlement. A detour is in effect using Mundy Loss Road, SR 410 and SR 165. View our next steps for a path towards replacement. Last Updated: 1/7/2019 1:33 PM More Info
At milepost 20
MODERATE IMPACT
SR 529 Southbound - On SR 529 southbound at Snohomish River Bridge (MP 4) the right lane is closed due to maintenance. Last Updated: 7/22/2019 9:21 AM More Info
At milepost 4
MODERATE IMPACT
SR 548 Both Directions - Eastbound & westbound traffic is alternating on SR 548 just west of Portal Way (MP 1) due to maintenance. Last Updated: 7/22/2019 9:18 AM More Info
At milepost 1
MODERATE IMPACT
I-90 Westbound - The I-90 westbound HOV on-ramp from Isl Crest Way (MP 7) is closed due to roadwork. Last Updated: 7/22/2019 9:00 AM More Info
At milepost 7
MODERATE IMPACT
I-90 Eastbound - The I-90 eastbound HOV off-ramp to Isl Crest Way (MP 7) is closed due to roadwork. Last Updated: 7/22/2019 8:59 AM More Info
At milepost 7
MODERATE IMPACT
SR 503 Both Directions - Maintenance on SR 503 both directions, from milepost 31 near Speelyai Creek to milepost 44 near Merwin Village Road, has mobile lane closures for raised pavement marker installation, beginning at 8:36 am on July 22, 2019 until further notice. Use caution in the area and move over for flashing lights. Last Updated: 7/22/2019 8:40 AM More Info
From milepost 31 to milepost 44
MODERATE IMPACT
US 97 Both Directions - Maintenance on US 97 both directions from milepost 32 near Chain Up Area to milepost 33.5 near Yakima County Line, traffic will be alternated in one lane. Expect Delays, use caution, and follow the flaggers' instructions beginning at 8:00 am on July 22, 2019 until further notice. Last Updated: 7/22/2019 8:06 AM More Info
From milepost 32 to milepost 34
MODERATE IMPACT
US 2 Northbound - Lane Closure for road work on US 2 northbound between milepost 304 and 306, Colbert, beginning at 8:00 am on July 22, 2019 until about 4:00 PM. Expect delays. Last Updated: 7/22/2019 8:05 AM More Info
From milepost 304 to milepost 306
MODERATE IMPACT
SR 122 Both Directions - Construction on SR 122 both directions from milepost 5 near Harmony Resort to milepost 7 near Jerrells Road, traffic will be alternated in one lane, use caution, and follow flaggers' instructions. Beginning at 7:51 am on July 22, 2019 until further notice. Last Updated: 7/22/2019 8:01 AM More Info
From milepost 5 to milepost 7
MODERATE IMPACT
SR 503 Both Directions - Construction on SR 503 both directions from milepost 45 near Old Lewis River Road to milepost 47 near Hansen Road, traffic will be alternated through a single lane, use caution and follow flaggers' directions. Beginning at 7:47 am on July 22, 2019 until further notice. Last Updated: 7/22/2019 7:57 AM More Info
From milepost 45 to milepost 47
MODERATE IMPACT
SR 28 Eastbound - Maintenance on SR 28, four miles west of Quincy, from milepost 23 to 24, Monday July 22, 2019. Eastbound motorists will experience lane shift, with right lane closure, where crews are repairing guardrail. Last Updated: 7/22/2019 7:29 AM More Info
From milepost 23 to milepost 24
MODERATE IMPACT
SR 542 Both Directions - Eastbound & westbound traffic is alternating on SR 542 just west of Cedarville Rd (MP 9) due to roadwork. Last Updated: 7/22/2019 7:16 AM More Info
At milepost 9
MODERATE IMPACT
SR 231 Both Directions - SR 231 is closed for road work, between MP 72 and MP 75, Town of Valley, starting on July 22, from 7:00 AM until 5:00 PM. Use signed detour in place, Bulldog Creek to US 395. Expect delays. Last Updated: 7/22/2019 7:16 AM More Info
From milepost 72 to milepost 76
MODERATE IMPACT
SR 525 Both Directions - On SR 525 northbound & southbound from 3rd St (MP 8) to Smugglers Cove Rd (MP 26) there is a slow-moving maintenance operation affecting all lanes. Last Updated: 7/22/2019 7:12 AM More Info
From milepost 8 to milepost 26
MODERATE IMPACT
SR 14 Both Directions - Construction on SR 14 both directions at milepost 47 near Wind River Road / Carson Junction, traffic will be alternated in one lane. Use caution, and follow flagger's direction. Beginning at 6:58 am on July 22, 2019 until further notice. Last Updated: 7/22/2019 7:04 AM More Info
From milepost 47 to milepost 48
MODERATE IMPACT
SR 6 Both Directions - Construction on SR 6 both directions at milepost 22.6 near Rock Creek. Traffic being alternated. Use caution and follow flagger's instructions. Beginning at 6:14 am on July 22, 2019 until further notice. Last Updated: 7/22/2019 6:21 AM More Info
At milepost 23
MODERATE IMPACT
SR 26 Both Directions - Road work with alternating lane closures with pilot car control on SR 26 between the Whitman/Adams county line and Penwawa road, MP 97 to MP 123, beginning at 5:38 am on July 22, 2019 until 8 pm. Expect delays. Last Updated: 7/22/2019 5:43 AM More Info
At milepost 113
MODERATE IMPACT
US 195 Southbound - Right Lane Closure on US 195 SB at MP 95.5 near 16th Ave, City of Spokane, beginning at 4:12 am on July 22, 2019 until 4 pm. Expect minor delays Last Updated: 7/22/2019 4:13 AM More Info
At milepost 96
MODERATE IMPACT
I-90 Westbound - Advance Notice: I-90 westbound Ryegrass Rest Area milepost 126, 16 miles east of Ellensburg will be closed Tuesday July 23 at 1 a.m. to Wednesday July 24 at 1 a.m. for a paving project. Last Updated: 7/22/2019 2:19 AM More Info
At milepost 126
MODERATE IMPACT
I-90 Westbound - I-90 westbound milepost 110 near Ellendburg to milepost 52 near the summit of Snoqualmie pass: Heavy weekend traffic is causing backups and up to 30 minutes of added travel time. An estimated time for the backups to clear out is not determined. Last Updated: 7/21/2019 1:33 PM More Info
From milepost 110 to milepost 52
MODERATE IMPACT
I-90 Both Directions - I-90 milepost 33 to 136 North Bend to Vantage: This week we have a number of construction and maintenance activities taking place between North Bend and Vantage during the day and at night which could cause delays due to lane closures. Please plan for added travel time and pay attention and slow down as you enter and exit our work zones. Last Updated: 7/21/2019 7:07 AM More Info
From milepost 33 to milepost 136
MODERATE IMPACT
SR 21 Both Directions - SR 21 milepost 145.62 at West Fork Sanpoil River, 17 miles south of Republic has a one-lane bridge with a 10 mile per hour speed limit until further notice. Follow traffic control in place and yield to on-coming traffic. Crews have begun construction of the new permanent bridge that will cross the West Fork Sanpoil River. Please note: this bridge will be closed and relocated at noon, July 23 and will reopen noon, July 25. Please adjust your route during this forty eight hour closure. Last Updated: 7/20/2019 12:04 PM More Info
At milepost 146
MODERATE IMPACT
SR 155 Both Directions - On SR 155 between Coulee Dam and Omak (MP 29 to 79), Monday through Thursday, 6 a.m. to 6 p.m. expect delays up to 20 minutes in a single work zone and pilot car controlled traffic where the contractor is completing electrical work and applying pavement markings. Last Updated: 7/19/2019 3:28 PM More Info
From milepost 29 to milepost 79
MODERATE IMPACT
US 2 Both Directions - On US 2 near Peshastin (MP 103.5) Monday and Tuesday only, from 8 a.m. to 3:30 p.m., expect flagger controlled traffic with delays where a maintenance crew is repairing a shoulder wash out. Last Updated: 7/19/2019 2:36 PM More Info
At milepost 103
LOW IMPACT
I-90 Northbound - Sunday, July 21, to the morning of Friday, July 26 – Up to three right lanes of eastbound I-90 between East Sunset Way and 468th Avenue Southeast will close from 9 p.m. to 6 a.m. nightly. This work is weather-dependent. Last Updated: 7/19/2019 2:33 PM More Info
From milepost 18 to milepost 34
MODERATE IMPACT
SR 243 Both Directions - On SR 243 between Vernita and Vantage (MP 0 to 28), Monday and Thursday only, 6 a.m. to 6 p.m. expect delays up to 30 min. with flaggers and pilot car controlled traffic where the contractor is chip sealing. Monday through Thursday nights from 7 p.m.to 5 a.m., expect mobile slow downs where the contractor will be brooming. Please do not pass brooming operations. Last Updated: 7/19/2019 2:31 PM More Info
From milepost 0 to milepost 28
MODERATE IMPACT
US 97 Both Directions - At US 97 Blewett Pass at milepost 159 in both directions near Swauk Creek campground, Thursday only expect flagger controlled traffic with delays of up to 20 minutes as the contractor pours concrete for the drilled shaft construction. Traffic in both directions has been shifted to detour lanes requiring a 12 ft. width restriction and a reduced speed of 50 mph through the work zone. These restrictions will remain in place during non-working hours. Bypass lane has narrow shoulders. Last Updated: 7/19/2019 2:28 PM More Info
From milepost 159 to milepost 160
MODERATE IMPACT
US 97 Both Directions - On US 97 beginning at the junction of SR 970 for 15 miles to Tronson Creek campground, Monday through Thursday, 6 a.m. to 8 p.m., expect one lane, flagger controlled traffic with delays up to 20 minutes in the work zone where the contractor will be paving, starting at the Mineral Springs area working north toward the summit of Blewett Pass. Last Updated: 7/19/2019 2:17 PM More Info
From milepost 150 to milepost 166
LOW IMPACT
I-5 Northbound - Thursday, July 18, to the morning of Friday, July 19 – The Olive Way on-ramp to northbound I-5 will close from 10 p.m. to 5 a.m. Last Updated: 7/18/2019 2:00 PM More Info
At milepost 166
MODERATE IMPACT
US 97 Both Directions - US 97 south of Blewett Pass at Swauk Campground (MP 159), Monday and Tuesday, 7 a.m. to 5 p.m., expect flagger controlled traffic with delays up to 20 minutes near Swauk Campground as the contractor continues drilled shaft construction. Traffic in both directions has been shifted to detour lanes requiring a 12 ft. width restriction and a reduced speed of 50 mph through the work zone. These restrictions will remain in place during non-working hours through the duration of the project. Last Updated: 7/12/2019 2:05 PM More Info
At milepost 160
MODERATE IMPACT
SR 153 Both Directions - On SR 153 near Methow (MP 11.83) Beginning July 17 through September, there will be intermittent flagger controlled traffic at all three bridges Monday through Saturday between 7 a.m. and 7 p.m. Work is still primarily under and around the bridge, so delays will be short, primarily when the crew is moving and staging equipment. Last Updated: 7/12/2019 1:52 PM More Info
From milepost 11 to milepost 22
MODERATE IMPACT
I-5 Both Directions - A Seattle Mariners baseball game that begins at 7:10 p.m. at T-Mobile Park will cause additional congestion on highways leading into Seattle, including I-5, I-90, SR 520 and SR 99. Last Updated: 7/9/2019 6:06 PM More Info
From milepost 162 to milepost 175
MODERATE IMPACT
I-5 Southbound - Beginning Monday, July 15 until further notice: A single lane on southbound I-5 between mileposts 51.43 and 52.79 will be closed around-the-clock until construction on the bridge is complete. Overnight double-lane closures will be in place from 9 p.m. to 6 a.m. nightly Monday through Friday.
Note: The speed limit has been reduced to 55 mph throughout the length of the work zone for the duration of construction. Last Updated: 7/5/2019 5:45 PM More Info
From milepost 52 to milepost 53
MODERATE IMPACT
SR 14 Both Directions - Monday, July 8 until further notice: Beginning at 7 a.m., all travelers within the intersection of SR 14 and 32nd Street will be shifted to a temporary roundabout for approximately five weeks. Last Updated: 7/5/2019 5:13 PM More Info
At milepost 17
MODERATE IMPACT
SR 20 Both Directions - Lane Closures and alternating piloted traffic, on SR 20 in both directions, from milepost 302 to milepost 342 (Republic to Barney's Jct.) for road work, from June 26, 2019 until August 15, 2019. Expect delays, lengthy at times. Last Updated: 7/4/2019 7:09 AM More Info
From milepost 302 to milepost 342
MODERATE IMPACT
Bigelow Gulch Rd Both Directions - Closure for road work in Spokane Valley on Bigelow Gulch Rd, both directions, from Argonne Rd to Forker Rd, beginning at 6:00 am on July 8, 2019 until about 6:00 am on July 22, 2019. Travelers should seek alternate routes. Last Updated: 7/3/2019 9:58 AM More Info

MODERATE IMPACT
Little Spokane Dr Both Directions - Spokane County: Spokane County will have Little Spokane Dr closed between Little Spokane Lane to Shady Slope for installing sewer lines. Expect delays, use other routes. Last Updated: 6/30/2019 8:58 AM More Info

MODERATE IMPACT
I-5 Southbound - SB I-5 Traffic Shift in Fife: SB I-5 drivers exiting at Bay Street/SR 167 need to stay in the right lane at Port of Tacoma Road to reach exit 135; Port of Tacoma Road drivers headed to SB I-5 will follow a temporary collector/distributor lane across the old SB I-5 bridge to rejoin mainline; SB I-5 travelers going to Tacoma’s city center, SR 16 or Olympia will use three left lanes at Port of Tacoma Road to reach their destinations. Last Updated: 6/29/2019 7:00 AM More Info
From milepost 136 to milepost 137
MODERATE IMPACT
US 195 Both Directions - Construction on US 195 both directions from milepost 62.3 near SR 271 Off-Ramp to milepost 69.9 near Plaza Rd On Ramp beginning at 7:00 pm on May 20, 2019 until further notice. Construction will be 24 hrs a day. Expect possible single lane closures and pilot car operations. Last Updated: 6/18/2019 3:01 PM More Info
From milepost 62 to milepost 70
MODERATE IMPACT
SR 107 Both Directions - Drivers will encounter one-way alternating traffic with a temporary signal through fall 2020 as Rognlin's Inc. crews for WSDOT rehabilitate the 58-year-old SR 107 Chehalis River Bridge south of Montesano. Last Updated: 5/29/2019 3:52 PM More Info
From milepost 7 to milepost 8
MODERATE IMPACT
SR 109 Both Directions - A private developer for the Quinault Tribe is making improvements to local streets on and off SR 109 near the Hogan’s Corner QMART convenience store. Drivers will encounter occasional lane and shoulder closures during weekday daytime hours through late September 2019. Work includes intersection improvements, new turn lanes and utility relocation. Last Updated: 5/17/2019 9:16 AM More Info
From milepost 16 to milepost 17
MODERATE IMPACT
US 195 Both Directions - Construction on US 195 both directions at milepost 94.9 near Thorp Rd beginning at 7:00 am on May 13, 2019, until further notice. Last Updated: 5/10/2019 3:09 PM More Info
At milepost 95
MODERATE IMPACT
US 2 Eastbound - ON US2/97 east of the Odabashian Bridge-the Cascade Avenue exit is closed for construction of the 35th St. extension until July. There is a signed detour. Last Updated: 4/26/2019 4:35 PM More Info
At milepost 121
MODERATE IMPACT
SR 290 Both Directions - The Hamilton/SR 290 westbound on-ramp to I-90 is closed for construction to continue bridge deck repair until further notice. Last Updated: 4/2/2019 7:45 AM More Info
From milepost 0 to milepost 1
MODERATE IMPACT
SR 409 Both Directions - Beginning Friday, March 22, 2019, until further notice: Traffic will alternate through a single lane, around-the-clock, for bridge painting and deck replacement work. For everyone’s safety, the speed limit across the bridge is 25 mph. Please slow down and give crews room to work. Last Updated: 3/29/2019 11:55 AM More Info
At milepost 3
LOW IMPACT
Aero Rd Both Directions - Spokane County: Aero Rd lane restrictions at Westbow for Round-a-bout construction, until about August 31st, 2019. Westbow is closed to NE traffic at the intersection. Access to Westbow/Hallett from Aero to Thomas Mallen via detour. Aero Road South of the intersection CLOSED to through traffic. Detours in place, expect delays. Use other routes. Last Updated: 7/22/2019 9:34 AM More Info

LOW IMPACT
Wellesley Both Directions - City of Spokane: Grinding and paving starts today July 22, 2019 on Wellesley from Nevada to Pittsburg Streets. Expect delays. Last Updated: 7/22/2019 9:07 AM More Info

LOW IMPACT
Euclid Both Directions - The City of Spokane will have Euclid Ave closed between Ralph and Market Street for water and sewer installation. This closure is expected to go through the end of July. Use other routes, expect delays. Last Updated: 7/22/2019 8:46 AM More Info

LOW IMPACT
Five Mile Both Directions - The City of Spokane will have Five Mile Road closed from Lincoln to Strong Road Starting Monday, June 17,2019 through mid-November, for road work. Use other routes and expect delays. Last Updated: 7/22/2019 8:43 AM More Info

LOW IMPACT
Maple/Ash St Northbound - The City of Spokane will have lane closures on Maple and Ash Streets between Francis Ave. and Cedar Street for grinding and paving. Expect delays. Last Updated: 7/22/2019 8:41 AM More Info

LOW IMPACT
Sprague Both Directions - City of Spokane: Sprague Ave is closed between Scott and Grant Streets for road work. Sprague Ave Rebuild Phase 2 is schedule through mid-November. Expect delays. Last Updated: 7/22/2019 8:38 AM More Info

LOW IMPACT
SR 14 Both Directions - Monday, July 22 to Friday, July 26: Travelers on both directions of SR 14, near Wind River Road, will be alternated through a single-lane, intermittently, with flaggers, daily, from 7 a.m. to 6 p.m., throughout the work zone, for roundabout construction work.
Note: Travelers should use caution and reduce speeds through the works zone, and expect delays of up to 20-minutes. Last Updated: 7/19/2019 2:22 PM More Info
From milepost 47 to milepost 50
LOW IMPACT
SR 14 Both Directions - Monday, July 22 to Friday, July 26: Travelers on both directions of SR 14, between Wind River Road and Old Hatchery Road, will be alternated, intermittently through a single-lane, daily from 6 a.m. to 6 p.m., for railroad bridge replacement work. Last Updated: 7/19/2019 2:18 PM More Info
From milepost 47 to milepost 50
LOW IMPACT
SR 6 Both Directions - Monday, July 22 to Friday, July 26: Travelers on both directions of SR 6 between mileposts 22.60 and 22.69 will alternate intermittently through a single lane with flaggers, daily from 6 a.m. to 4:30 p.m., for culvert replacement work. Last Updated: 7/19/2019 2:16 PM More Info
From milepost 23 to milepost 23
LOW IMPACT
SR 506 Both Directions - Monday, July 22 to Friday, July 26: Travelers on both directions of SR 506, between Lacamas Creek and Frontage Road, will be alternated through a single-lane with flaggers, daily from 8 a.m., to 2 p.m., for power pole replacement work. Last Updated: 7/19/2019 2:14 PM More Info
From milepost 8 to milepost 10
LOW IMPACT
SR 505 Both Directions - Monday, July 22 to Friday, July 26: Travelers on both directions of SR 505, between South Military Road and Knowles Road, will be alternated through a single-lane with flaggers, daily from 8 a.m. to 2 p.m., for power pole replacement work. Last Updated: 7/19/2019 2:13 PM More Info
From milepost 2 to milepost 3
LOW IMPACT
I-5 Northbound - Monday, July 22 to Thursday, July 25: Single-lane and shoulder closures are possible on northbound I-5 between the Interstate bridge and milepost 2.5, daily from 7 a.m. to 6 p.m., for ITS communication installation work along the shoulders. Last Updated: 7/19/2019 2:03 PM More Info
From milepost 0 to milepost 3
LOW IMPACT
I-90 Both Directions - On I-90 in Moses Lake (milepost 175.5 to 176.1) Wednesday and Thursday, 7 a.m. to 4 p.m., expect right lane closures and reduced speed zone of 55 mph through work zone where crews are repairing concrete on bridge slab edges. Speed limit returns to 70 mph during non-working hours, including weekends. Last Updated: 7/12/2019 1:23 PM More Info
From milepost 175 to milepost 176
LOW IMPACT
I-90 Both Directions - Schragg rest area on I-90 at MP 198 is open in both directions with portable toilets but no water available, about 22 miles west of Ritzville. beginning at 11:25 am on July 12, 2019 until further notice. Last Updated: 7/12/2019 11:42 AM More Info
At milepost 198
LOW IMPACT
Sprague Both Directions - The City of Spokane has Sprague Ave Closed between Scott and Grant Streets for road work. Use other routes and expect delays through mid-November 2019. Last Updated: 6/30/2019 9:27 AM More Info

LOW IMPACT
Post Both Directions - City of Spokane, the Post Street Bridge is closed to vehicular traffic starting immediately, through Spring of 2020. Use other routes. Last Updated: 6/30/2019 9:25 AM More Info

LOW IMPACT
Stoneman Rd Both Directions - Spokane County: Stoneman Road will be closed from Parksmith Drive to Argonne Road for shoulder and ditch work and then chip sealing. This work is expected to last through July 24, 2019 Expect delays. Last Updated: 6/30/2019 9:11 AM More Info

LOW IMPACT
Bigelow Gulch Rd Both Directions - Spokane County: Construction work adding culverts, guardrail and paving. The speed limit has been reduced to 35 MPH. There will be lane restrictions. Expect delays during construction work. Last Updated: 6/30/2019 9:01 AM More Info

LOW IMPACT
Geiger Bv Both Directions - Spokane County will have Geiger Blvd closed between Hayford Rd and Thomas Mallen Rd for right of way improvements. Use other routes until August 2, 2019. Last Updated: 6/30/2019 8:57 AM More Info

LOW IMPACT
Lincoln Northbound - City of Spokane will have Lincoln Street closed between Main Ave and Spokane Falls Boulevard for road work. Motorists should use other routes and expect delays. Last Updated: 6/11/2019 2:27 PM More Info

LOWEST IMPACT
Arthur Both Directions - The City of Spokane will have Arthur Street closed between 3rd and 2nd Avenues for storm water piping, through mid-July. Expect delays. Last Updated: 7/22/2019 9:04 AM More Info

LOWEST IMPACT
High Both Directions - City of Spokane: On Thursday, July 25th, High Drive will be closed from Grand to Hatch Streets, for road work. Expect delays. Last Updated: 7/22/2019 8:56 AM More Info

LOWEST IMPACT
SR 22 Both Directions - SR-22 milepost 1: Monday July 22 from 7 a.m. to 3 p.m. there will be single lane traffic for bridge repairs. Last Updated: 7/22/2019 3:13 AM More Info
At milepost 1
LOWEST IMPACT
I-82 Both Directions - North 1st Street to I-82 Eastbound Ramp Closure:
Monday July 22 through Saturday July 27 the on ramp from North 1st Street to I-82 eastbound will be closed. Last Updated: 7/22/2019 3:12 AM More Info
At milepost 31
LOWEST IMPACT
US 12 Both Directions - White Pass Vicinity Major Drainage Phase 2
Monday July 22 through Friday July 26, 7 a.m. to 5 p.m. MP 153- Drivers should anticipate alternating one way traffic with up to 20 minute delays. Last Updated: 7/22/2019 3:08 AM More Info
From milepost 140 to milepost 160
LOWEST IMPACT
I-82 Both Directions - I-82 South Union Gap Interchange – Construct Ramps
I-82 Eastbound:
Day Work – July 22 & July 24: Shadow Vehicle Left Lane
Night Work – July 23(7 P.M. – 6 A.M.): Left Lane Closure.
I-82 Westbound:
Night Work – July 22 and July 23 (7 P.M. – 6 A.M.): Left Lane Closure.
Exit 38 Westbound Off-Ramp:
Day Work – July 23 – July 25: Flagging Operation Last Updated: 7/22/2019 3:01 AM More Info
At milepost 37
LOWEST IMPACT
US 12 Both Directions - Nine Mile Hill to Frenchtown Vic – Turnback Improvements.
Single lane, temporary signal control in place for 24 hours to replace guardrail over Touchet River Bridge. Last Updated: 7/22/2019 2:58 AM More Info
From milepost 318 to milepost 324
LOWEST IMPACT
I-90 Both Directions - I-90 and I-82 Ellensburg to Vantage Paving
Traffic should anticipate delays with added travel times in both directions.
Multiple Lane Closures Sunday July 21, 12 a.m. through Thursday July 25 at 9 a.m., milepost 122 to milepost 130
I-90 Westbound Lane Closures: 6 a.m. to 6 p.m.
I-90 Eastbound Lane Closures: 6 a.m. to 6 p.m.
Multiple Lane Closures Sunday July 21, 12 a.m. through Thursday July 25 at 9 a.m. milepost 130 to milepost 122 Last Updated: 7/22/2019 2:56 AM More Info
At milepost 130
LOWEST IMPACT
I-82 Both Directions - I-82 milepost 132 at the SR-14 interchange: Tuesday July 23 and Wednesday July 24 from 7 a.m. to 5 p.m. there will be lane closures for pavement sensors repair work. Last Updated: 7/22/2019 2:33 AM More Info
At milepost 132
LOWEST IMPACT
SR 129 Both Directions - SR 129 Buford Creek Barrier Fish Passage Project 9418
Monday, July 22 through Saturday, July 27, work will take place during the daytime from 7 a.m. to 5 p.m., single lane closures will be in effect with flagger controlled traffic. Last Updated: 7/22/2019 2:31 AM More Info
At milepost 1
LOWEST IMPACT
SR 6 Both Directions - Monday, July 22 to Friday, July 26: Shoulder closures will be in place daily from 7 a.m. to 3:30 p.m. on SR 6 near Jones Creek just east of Pe Ell, between mileposts 30.98 and 31.14, for culvert replacement work. Last Updated: 7/19/2019 2:12 PM More Info
At milepost 31
LOWEST IMPACT
SR 21 Both Directions - Construction on SR 21 both directions at both Keller Ferry Landing sites beginning at 7:30 am on April 17, 2019, until further notice. Crews will begin construction on new the new terminal and pontoon replacement. Ferry operation will not be impacted at this time. Last Updated: 4/16/2019 2:58 PM More Info
From milepost 107 to milepost 107
LOWEST IMPACT
US 395 Both Directions - Construction on US 395 Spur - NSC both directions at the Freya Roundabouts Monday - Friday 6:00 am to 4:30 pm. Roadway users should be alert for occasional traffic control. Last Updated: 8/2/2018 12:51 PM More Info
At milepost 164