Return to Map

HIGHEST IMPACT
I-5 Southbound - Update 3:25 AM : On I-5 southbound just north of S Forest St (MP 163) there is a collision blocking the right lane. Medical Aid, Fire Assistance, Tow Assistance, and the State Patrol have arrived on the scene. Last Updated: 10/19/2019 3:26 AM More Info
At milepost 163
HIGHEST IMPACT
I-5 Northbound - Update 3:18 AM : On I-5 northbound just north of 236th St SW (MP 178) there is a collision blocking the 2 left lanes. The State Patrol has arrived on the scene. Last Updated: 10/19/2019 3:18 AM More Info
At milepost 178
HIGHEST IMPACT
I-5 Southbound - High Impact – Friday, Oct. 18, to the morning of Monday, Oct. 21 – All lanes of the southbound I-5 mainline between Yesler Way and the I-90 Interchange will close from 11 p.m. to 8 a.m. nightly. During this time, all traffic will be shifted to the collector-distributor lanes. This work is weather-dependent. Last Updated: 10/18/2019 1:38 PM More Info
From milepost 165 to milepost 164
HIGH IMPACT
I-5 Northbound - Road work on I-5 northbound from milepost 130.7 near S 56th St to milepost 131.3 near S 48th St beginning at 9:52 pm on October 18, 2019 until about 7:00 am on October 19, 2019. Last Updated: 10/18/2019 9:54 PM More Info
From milepost 131 to milepost 132
HIGH IMPACT
SR 162 Both Directions - The SR 162 Spiketon Creek Bridge has been permanently closed due to recently discovered pier settlement. A detour is in effect using Mundy Loss Road, SR 410 and SR 165. WSDOT plans to install a temporary span and reopen the highway to travelers mid-October 2019. View our next steps for a path towards permanent bridge replacement additionally in 2022. Last Updated: 8/9/2019 1:13 PM More Info
At milepost 20
HIGH IMPACT
SR 506 Both Directions - Beginning at 7 a.m. on Tuesday, June 18, until further notice: Both directions of SR 506, between Telegraph Road and the end of the Lacamas Creek Bridge, will be fully closed, for bridge replacement work.
Note: During construction, travelers will follow a signed detour using South Military Road and SR 505. The bridge closure and detour will remain in place until construction of the new bridge is complete. Last Updated: 6/14/2019 4:59 PM More Info
From milepost 8 to milepost 8
MODERATE IMPACT
SR 500 Eastbound - Construction on SR 500 eastbound from milepost 0 near I-5 to milepost 4.4 near 4th Plain Boulevard . Mobile right lane closure in progress, use caution, beginning at 1:40 am on October 19, 2019 until further notice. Last Updated: 10/19/2019 1:41 AM More Info
From milepost 0 to milepost 5
MODERATE IMPACT
I-90 Eastbound - I-90 eastbound Exit 80 Off ramp is open, 4 miles west of Cle Elum, The off ramp will close again Monday Oct 21 at 6 AM through Monday Nov 4. The on ramp will remain closed until Monday Nov. 4, drivers wishing to go eastbound from Exit 80 will need to go through Cle Elum to Oaks Ave. on ramp at Exit 84. Ramp closures are for concrete rehabilitation of the highway and bridge deck. Last Updated: 10/19/2019 12:25 AM More Info
At milepost 80
MODERATE IMPACT
I-205 Northbound - Construction on I-205 northbound from milepost 32.2, near 78th Street to milepost 34.7, near 50th Avenue. The left lane is closed, use caution and expect delays, beginning at 10:22 pm on October 18, 2019 until further notice. Last Updated: 10/18/2019 10:23 PM More Info
From milepost 32 to milepost 35
MODERATE IMPACT
I-205 Northbound - Maintenance on I-205 northbound from milepost 28, near 10th Street Overpass to milepost 28.6, near Mill Plain Overpass. the right lane is closed, beginning at 9:59 pm on October 18, 2019 until further notice. Last Updated: 10/18/2019 10:04 PM More Info
From milepost 28 to milepost 29
MODERATE IMPACT
I-205 Northbound - Wednesday, Oct. 16 to the morning of Saturday, Oct. 19: ?Up to two lanes of northbound I-205, between SR 14/Columbia River and Northeast 134th Street, will close nightly, from 8 p.m. to 5 a.m., for concrete panel replacement work. Last Updated: 10/18/2019 10:31 AM More Info
From milepost 27 to milepost 37
MODERATE IMPACT
I-5 Southbound - Friday, Oct. 18 to the morning of Saturday, Oct. 19: Up to two lanes of southbound I-5, between the Gee Creek Rest Area and Northeast 134th Avenue overnight from 10 p.m. to 7 a.m., for concrete panel replacement work. Last Updated: 10/11/2019 12:09 PM More Info
From milepost 11 to milepost 8
MODERATE IMPACT
US 101 Both Directions - Contractor crews for Olympic National Park are nearing completion of a 3-year highway rehabilitation project. 7-days a week, during overnight hours, drivers will encounter one-way alternating traffic conditions with a temporary signal through late-November or until project completion. Last Updated: 10/9/2019 4:03 PM More Info
From milepost 228 to milepost 229
MODERATE IMPACT
SR 116 Both Directions - Crews for WSDOT and NOSC are working to restore historic tidal channels and fish runs between southern Kilisut Harbor and Oak Bay by constructing a 440' concrete girder bridge along SR 116. During construction, travelers should expect weekday daytime delays as well as reduced speeds with one-way alternating traffic early August 2019 through fall 2020. Last Updated: 9/17/2019 2:30 PM More Info
At milepost 5
MODERATE IMPACT
US 97A Both Directions - On US 97A in the city of Chelan on W. Woodin Ave. (milepost 223) Monday through Thursday from 7 a.m. to 5 p.m. expect flagger controlled traffic with delays on W. Woodin Ave. where a contractor for Chelan County PUD is installing conduit. Last Updated: 9/13/2019 4:34 PM More Info
At milepost 223
MODERATE IMPACT
I-5 Northbound - Saturday, September 14, to the morning of Sunday, September 15 – Express lanes will be open all night in the northbound direction from 1:45 p.m. to 7:30 a.m. Last Updated: 9/13/2019 4:09 PM More Info
From milepost 165 to milepost 173
MODERATE IMPACT
SR 302 Both Directions - This project removes and replaces three, outdated fish barriers under SR 302 at Minter Creek with fish passable structures and repaves nearly 7 miles of highway along with ADA improvements and deck repairs for the Purdy Spit Bridge. Construction began Monday, Aug. 26 and drivers should expect daytime lane and shoulder closures through fall of 2020. Last Updated: 9/13/2019 12:02 PM More Info
From milepost 11 to milepost 17
MODERATE IMPACT
SR 14 Both Directions - Beginning Monday, Sept. 16, through the end of October: Travelers should plan for nighttime delays, as they alternate through a single-lane of SR 14 near 32nd Street, nightly from 7 p.m. until 7 a.m. Last Updated: 9/6/2019 1:46 PM More Info
At milepost 17
MODERATE IMPACT
SR 510 Both Directions - Southbound Marvin Road (SR 510) at I-5 in Lacey is reduced to one lane. Travelers are encouraged to expect delays. The changes will be in place through mid-November. Last Updated: 9/6/2019 1:23 PM More Info
At milepost 0
MODERATE IMPACT
US 101 Both Directions - This project replaces three outdated culverts that run under US 101 at Steamboat, Harlow and Fisher Creeks between Queets and Kalaloch. Drivers will encounter a temporary speed limit reduction of 25 mph and one-way alternating traffic with a temporary signal through fall of 2020. The damaged culverts will be replaced with concrete girder bridges. Last Updated: 9/4/2019 2:28 PM More Info
From milepost 147 to milepost 163
MODERATE IMPACT
SR 21 Both Directions - One lane bridge and road construction on SR 21 at milepost 145 at the San Poil River bridge beginning at 3:52 pm on June 11, 2019 until 6:00 pm November 15, 2019. Watch for slow-moving vehicles over the bridge and in the area. Last Updated: 8/23/2019 10:29 AM More Info
At milepost 145
MODERATE IMPACT
SR 107 Both Directions - Drivers will encounter one-way alternating traffic conditions with a temporary signal through fall of 2020 as crews rehabilitate the 1958 SR 107 Chehalis River Bridge outside of Montesano. Any total bridge closures will be announced in advance. Last Updated: 8/22/2019 12:39 PM More Info
From milepost 7 to milepost 8
MODERATE IMPACT
SR 6 Both Directions - Tuesday, Aug. 13 until further notice: Travelers on both directions of SR 6, between mileposts 22.60 and 22.69, will be shifted onto a temporary single-lane, bypass road. This detour allows travelers to safely bypass construction around-the-clock, and will be controlled with an automated signal.
Note: Travelers should expect delays of up to 20 minutes, for additional intermittent, daytime single-lane closures, as needed. Last Updated: 8/9/2019 2:41 PM More Info
From milepost 23 to milepost 23
MODERATE IMPACT
SR 21 Both Directions - Construction on SR 21 both directions at milepost 145.6 near W Fork Sanpoil River until further notice. Drivers will need to be alert approaching the bridge as the temporary structure is a single lane bridge with alternating traffic. Last Updated: 7/30/2019 8:42 AM More Info
At milepost 146
MODERATE IMPACT
SR 6 Both Directions - Beginning Monday, July 26, until further notice: Travelers on both directions of SR 6, near Jones Creek just east of Pe Ell, will be shifted onto a temporary single-lane, bypass road. This detour allows travelers to safely bypass construction around-the-clock, and will be controlled with an automated signal.
Note: Travelers should expect delays of up to 20 minutes, for additional intermittent, daytime single-lane closures, as needed. Last Updated: 7/26/2019 1:29 PM More Info
From milepost 31 to milepost 32
MODERATE IMPACT
I-5 Southbound - Beginning Monday, July 15 until further notice: A single lane on southbound I-5 between mileposts 51.43 and 52.79 will be closed around-the-clock until construction on the bridge is complete. Overnight double-lane closures will be in place from 9 p.m. to 6 a.m. nightly Monday through Friday.
Note: The speed limit has been reduced to 55 mph throughout the length of the work zone for the duration of construction. Last Updated: 7/5/2019 5:45 PM More Info
From milepost 52 to milepost 53
MODERATE IMPACT
SR 14 Both Directions - Monday, July 8 until further notice: Beginning at 7 a.m., all travelers within the intersection of SR 14 and 32nd Street will be shifted to a temporary roundabout for approximately five weeks. Last Updated: 7/5/2019 5:13 PM More Info
At milepost 17
MODERATE IMPACT
SR 409 Both Directions - Beginning Friday, March 22, 2019, until further notice: Traffic will alternate through a single lane, around-the-clock, for bridge painting and deck replacement work. For everyone’s safety, the speed limit across the bridge is 25 mph. Please slow down and give crews room to work. Last Updated: 3/29/2019 11:55 AM More Info
At milepost 3
LOW IMPACT
I-82 Eastbound - I-82 eastbound milepost 31 Yakima: Wednesday Oct. 23 expect single lane closures during night time hours. Last Updated: 10/19/2019 1:40 AM More Info
At milepost 31
LOW IMPACT
US 395 Both Directions - US-395 northbound milepost 19 Pasco: Monday Oct 21 during night time hours the Sylvester Street off ramp will be closed. Last Updated: 10/19/2019 1:19 AM More Info
At milepost 19
LOW IMPACT
I-182 Eastbound - I-182 eastbound milepost 13 Pasco: Monday Oct. 21 during night time hours the on ramp from 4th Street will be closed.
I-182 Eastbound milepost 14 Pasco: Tuesday Oct 22 during night time hours there will be a right lane closure. The off ramp will remain open. Last Updated: 10/19/2019 1:16 AM More Info
From milepost 13 to milepost 14
LOW IMPACT
SR 397 Both Directions - SR 397 milepost 17 N. Gum Street Kennewick: Monday Oct. 21 to Friday Oct. 25 from 8 a.m. to 3 p.m. there will be flagged traffic control. Last Updated: 10/19/2019 12:40 AM More Info
At milepost 17
LOW IMPACT
US 395 Both Directions - US-395, 13 miles north of Pasco, milepost 36 to milepost 45 near the SR-17 Jct.: Monday Oct. 21 through Friday Oct. 25 from 7 a.m. to 5 p.m. both north and southbound there will be lane closures with reduced speeds for median work. Last Updated: 10/19/2019 12:30 AM More Info
From milepost 36 to milepost 46
LOW IMPACT
Geiger Bv Both Directions - Spokane County: Geiger Road improvments, curbs, drywells, signing, signals. Road closed from Hayford Road to Thomas Mallen Road. Use other routes, expect delays to SR 902. Last Updated: 10/6/2019 4:10 PM More Info

LOW IMPACT
SR 17 Both Directions - On SR 17 in Moses Lake (milepost 51 - 54), Monday - Friday from 6 a.m. to 6 p.m. expect shoulder closures and lane closures on SR 17 at intersections between the I-90 eastbound off ramp to Broadway Ave. where the contractor is installing electrical conduit and foundations for the new “Prepare To Stop When Flashing” alert systems. Last Updated: 10/4/2019 4:35 PM More Info
From milepost 51 to milepost 54
LOW IMPACT
Five Mile Both Directions - City of Spokane will have Five Mile Road closed from Lincoln to Strong Road Starting Monday, June 17,2019 through mid-November, for road work. Use other routes and expect delays. Last Updated: 9/2/2019 2:16 PM More Info

LOW IMPACT
Sprague Both Directions - City of Spokane has Sprague Ave Closed between Scott and Grant Streets for road work. Use other routes and expect delays through mid-November 2019. Last Updated: 9/2/2019 2:10 PM More Info

LOW IMPACT
I-5 Northbound - Monday, September 2 – Express lanes will be open in the northbound direction from 1:45 to 11:00 p.m. Last Updated: 8/30/2019 2:06 PM More Info
From milepost 165 to milepost 173
LOW IMPACT
I-5 Southbound - Monday, September 2 – Express lanes will be open in the southbound direction from 8 a.m. to 1:30 p.m. Last Updated: 8/30/2019 2:05 PM More Info
From milepost 173 to milepost 166
LOW IMPACT
SR 6 Both Directions - Beginning Tuesday, Aug. 13, until further notice: Travelers on both directions of SR 6 near Salmon Creek will be shifted to use a temporary detour road along SR 6, as work to replace an undersized culvert with a larger box culvert continues. During the work, travelers will pass through the area, around-the-clock, via an automated signal. The speed limit will be reduced to 25-mph, throughout the work zone. Travelers should expect delays of up to 20 minutes, and may encounter lane closures. Last Updated: 8/14/2019 9:11 AM More Info
From milepost 28 to milepost 29
LOW IMPACT
Post Both Directions - City of Spokane, the Post Street Bridge is closed to vehicular traffic starting immediately, through Spring of 2020. Use other routes. Last Updated: 6/30/2019 9:25 AM More Info

LOWEST IMPACT
I-182 Eastbound - I-182 eastbound milepost 13 to milepost 14 Pasco: Monday Oct. 21 from 9 a.m. to 3:30 p.m. there will be a left lane closure for guardrail repair. Last Updated: 10/19/2019 1:30 AM More Info
From milepost 13 to milepost 14
LOWEST IMPACT
US 12 Both Directions - US-12 milepost 292 Pasco: Thursday Oct. 17 and Friday Oct. 19 from 6:30 a.m. to 5:30 p.m. there will be a single lane closures. Last Updated: 10/19/2019 1:25 AM More Info
At milepost 292
LOWEST IMPACT
US 395 Both Directions - US-395 milepost 23 Pasco: Thursday Oct. 17 and Friday Oct. 19 from 6:30 a.m. to 5:30 p.m. there will be a single lane closures. Last Updated: 10/19/2019 1:22 AM More Info
At milepost 23
LOWEST IMPACT
I-82 Westbound - I-82 westbound milepost 132 near the Oregon State Line: Monday Oct. 21 from 12 noon to 4 p.m. there will be a right lane closure for concrete jersey repair. Last Updated: 10/19/2019 12:42 AM More Info
At milepost 132
LOWEST IMPACT
US 395 Both Directions - Construction on US 395 Spur - NSC both directions at the Freya Roundabouts Monday - Friday 6:00 am to 4:30 pm. Roadway users should be alert for occasional traffic control. Last Updated: 8/2/2018 12:51 PM More Info
At milepost 164