I-5 Southbound - On the I-5 southbound off-ramp to SR 529 (MP 198) there is a disabled vehicle blocking the ramp. Fire Assistance has arrived on the scene. Last Updated: 7/21/2019 9:58 PM More Info
At milepost 198
HIGHEST IMPACT
SR 167 Southbound - Brush Fire on SR 167 southbound at milepost 4.9 near 18th St NW beginning at 9:34 pm on July 21, 2019 until further notice. The right lane is blocked. Last Updated: 7/21/2019 9:36 PM More Info
At milepost 5
HIGH IMPACT
SR 28 Both Directions - SR 28 between Ephrata and Soap Lake (MP 44 to 53)- Monday through Thursday, from 7 a.m. to 7 p.m., expect delays up to 20 minutes with flaggers, lane shifts and alternating one-way traffic between Martin Road and the south end of Ephrata, and between the north end of Ephrata and Soap Lake where the contractor is chip sealing. **travel with care** Last Updated: 7/19/2019 10:34 PM More Info
From milepost 44 to milepost 53
HIGH IMPACT
SR 902 Both Directions - Construction on I-90 at the Medical Lake/SR 902 intersection in both directions at milepost 272.8 near SR 902 beginning at 10:48 am on June 24, 2019 until further notice. Crews will be constructing three new roundabouts and a parallel bridge over I-90. The roundabouts will be built at both the east and westbound ramp terminals to I-90 and at Geiger Blvd. and SR 902. Last Updated: 7/18/2019 7:51 AM More Info
From milepost 12 to milepost 13
HIGH IMPACT
SR 7 Both Directions - Starting July 22, SR 7 will close each day from 6 a.m. to 9 p.m. Monday through Thursday between milepost 23 and 24. During the closure, drivers will detour through Eatonville using SR 161 and Alder Cutoff Road East. Crews will re-open SR 7 at night and during early morning hours. On Fridays, travelers using SR 7 may see alternating one-way traffic from 6 a.m. to noon. No work is allowed from noon Friday to 6 a.m. Monday. Last Updated: 7/17/2019 2:06 PM More Info
From milepost 23 to milepost 25
HIGH IMPACT
US 2 Both Directions - Construction on US 2 both directions from milepost 292.9 near SR 395 to milepost 295.7 near Farwell Rd beginning at 7:00 am on July 8, 2019, until further notice. Crews will be repaving this section of US 2 from the Division Wye to Farwell Road. Paving will occur at night starting at 7 p.m. during weekdays. Last Updated: 7/9/2019 8:55 AM More Info
From milepost 293 to milepost 296
HIGH IMPACT
SR 506 Both Directions - Beginning at 7 a.m. on Tuesday, June 18, until further notice: Both directions of SR 506, between Telegraph Road and the end of the Lacamas Creek Bridge, will be fully closed, for bridge replacement work.
Note: During construction, travelers will follow a signed detour using South Military Road and SR 505. The bridge closure and detour will remain in place until construction of the new bridge is complete. Last Updated: 6/14/2019 4:59 PM More Info
From milepost 8 to milepost 8
HIGH IMPACT
SR 162 Both Directions - The SR 162 Spiketon Creek Bridge has been permanently closed due to recently discovered pier settlement. A detour is in effect using Mundy Loss Road, SR 410 and SR 165. View our next steps for a path towards replacement. Last Updated: 1/7/2019 1:33 PM More Info
At milepost 20
MODERATE IMPACT
US 12 Eastbound - Collision blocking on US 12 eastbound near milepost 127 near Bevin Lake Road beginning at 10:12 pm on July 21, 2019 until further notice. Last Updated: 7/21/2019 10:14 PM More Info
At milepost 127
MODERATE IMPACT
I-90 Westbound - I-90 westbound milepost 110 near Ellendburg to milepost 52 near the summit of Snoqualmie pass: Heavy weekend traffic is causing backups and up to 30 minutes of added travel time. An estimated time for the backups to clear out is not determined. Last Updated: 7/21/2019 1:33 PM More Info
From milepost 110 to milepost 52
MODERATE IMPACT
I-90 Westbound - Advance Notice: I-90 westbound Ryegrass Rest Area milepost 126, 16 miles east of Ellensburg will be closed Monday July 22 at 1 a.m. to Tuesday July 23 at 1 a.m. for a paving project. Last Updated: 7/21/2019 9:22 AM More Info
At milepost 126
MODERATE IMPACT
I-90 Both Directions - I-90 milepost 33 to 136 North Bend to Vantage: This week we have a number of construction and maintenance activities taking place between North Bend and Vantage during the day and at night which could cause delays due to lane closures. Please plan for added travel time and pay attention and slow down as you enter and exit our work zones. Last Updated: 7/21/2019 7:07 AM More Info
From milepost 33 to milepost 136
MODERATE IMPACT
SR 21 Both Directions - SR 21 milepost 145.62 at West Fork Sanpoil River, 17 miles south of Republic has a one-lane bridge with a 10 mile per hour speed limit until further notice. Follow traffic control in place and yield to on-coming traffic. Crews have begun construction of the new permanent bridge that will cross the West Fork Sanpoil River. Please note: this bridge will be closed and relocated at noon, July 23 and will reopen noon, July 25. Please adjust your route during this forty eight hour closure. Last Updated: 7/20/2019 12:04 PM More Info
At milepost 146
MODERATE IMPACT
SR 155 Both Directions - On SR 155 between Coulee Dam and Omak (MP 29 to 79), Monday through Thursday, 6 a.m. to 6 p.m. expect delays up to 20 minutes in a single work zone and pilot car controlled traffic where the contractor is completing electrical work and applying pavement markings. Last Updated: 7/19/2019 3:28 PM More Info
From milepost 29 to milepost 79
MODERATE IMPACT
US 2 Both Directions - On US 2 near Peshastin (MP 103.5) Monday and Tuesday only, from 8 a.m. to 3:30 p.m., expect flagger controlled traffic with delays where a maintenance crew is repairing a shoulder wash out. Last Updated: 7/19/2019 2:36 PM More Info
At milepost 103
MODERATE IMPACT
SR 520 Eastbound - Saturday, July 20, to the morning of Monday, July 22 - The right lane of eastbound SR 520 between Montlake Boulevard and Portage Bay will close from 9 p.m. to 5 a.m. Last Updated: 7/19/2019 2:34 PM More Info
From milepost 1 to milepost 1
MODERATE IMPACT
I-90 Northbound - Sunday, July 21, to the morning of Friday, July 26 – Up to three right lanes of eastbound I-90 between East Sunset Way and 468th Avenue Southeast will close from 9 p.m. to 6 a.m. nightly. This work is weather-dependent. Last Updated: 7/19/2019 2:33 PM More Info
From milepost 18 to milepost 34
MODERATE IMPACT
I-405 Southbound - Sunday, June 21, to the morning of Monday, June 22 – The southbound I-405 ramp to the westbound I-90 HOV lane will close from 8 p.m. to 5 a.m. Last Updated: 7/19/2019 2:31 PM More Info
At milepost 11
MODERATE IMPACT
SR 243 Both Directions - On SR 243 between Vernita and Vantage (MP 0 to 28), Monday and Thursday only, 6 a.m. to 6 p.m. expect delays up to 30 min. with flaggers and pilot car controlled traffic where the contractor is chip sealing. Monday through Thursday nights from 7 p.m.to 5 a.m., expect mobile slow downs where the contractor will be brooming. Please do not pass brooming operations. Last Updated: 7/19/2019 2:31 PM More Info
From milepost 0 to milepost 28
MODERATE IMPACT
I-405 Southbound - Sunday, June 21, to the morning of Monday, June 22 – The southbound I-405 ramp to westbound I-90 will close from 10 p.m. to 5 a.m. Last Updated: 7/19/2019 2:30 PM More Info
At milepost 11
MODERATE IMPACT
I-405 Northbound - Sunday, June 21, to the morning of Monday, June 22 – The northbound I-405 ramp to westbound I-90 will close from 10 p.m. to 5 a.m. Last Updated: 7/19/2019 2:29 PM More Info
At milepost 11
MODERATE IMPACT
US 97 Both Directions - At US 97 Blewett Pass at milepost 159 in both directions near Swauk Creek campground, Thursday only expect flagger controlled traffic with delays of up to 20 minutes as the contractor pours concrete for the drilled shaft construction. Traffic in both directions has been shifted to detour lanes requiring a 12 ft. width restriction and a reduced speed of 50 mph through the work zone. These restrictions will remain in place during non-working hours. Bypass lane has narrow shoulders. Last Updated: 7/19/2019 2:28 PM More Info
From milepost 159 to milepost 160
MODERATE IMPACT
I-90 Westbound - Sunday, June 21, to the morning of Monday, June 22 – The Richards Road on-ramp to westbound I-90 will close from 9 p.m. to 5 a.m. Last Updated: 7/19/2019 2:24 PM More Info
At milepost 10
MODERATE IMPACT
US 97 Both Directions - On US 97 beginning at the junction of SR 970 for 15 miles to Tronson Creek campground, Monday through Thursday, 6 a.m. to 8 p.m., expect one lane, flagger controlled traffic with delays up to 20 minutes in the work zone where the contractor will be paving, starting at the Mineral Springs area working north toward the summit of Blewett Pass. Last Updated: 7/19/2019 2:17 PM More Info
From milepost 150 to milepost 166
LOW IMPACT
I-5 Northbound - Thursday, July 18, to the morning of Friday, July 19 – The Olive Way on-ramp to northbound I-5 will close from 10 p.m. to 5 a.m. Last Updated: 7/18/2019 2:00 PM More Info
At milepost 166
MODERATE IMPACT
SR 231 Both Directions - SR 231 will be closed for road work, between MP 71.5 and MP 75, Town of Valley, starting on July 22, from 7:00 AM until 5:00 PM. Use other routes. Last Updated: 7/16/2019 5:46 PM More Info
From milepost 72 to milepost 76
MODERATE IMPACT
US 97 Both Directions - US 97 south of Blewett Pass at Swauk Campground (MP 159), Monday and Tuesday, 7 a.m. to 5 p.m., expect flagger controlled traffic with delays up to 20 minutes near Swauk Campground as the contractor continues drilled shaft construction. Traffic in both directions has been shifted to detour lanes requiring a 12 ft. width restriction and a reduced speed of 50 mph through the work zone. These restrictions will remain in place during non-working hours through the duration of the project. Last Updated: 7/12/2019 2:05 PM More Info
At milepost 160
MODERATE IMPACT
SR 153 Both Directions - On SR 153 near Methow (MP 11.83) Beginning July 17 through September, there will be intermittent flagger controlled traffic at all three bridges Monday through Saturday between 7 a.m. and 7 p.m. Work is still primarily under and around the bridge, so delays will be short, primarily when the crew is moving and staging equipment. Last Updated: 7/12/2019 1:52 PM More Info
From milepost 11 to milepost 22
MODERATE IMPACT
I-5 Both Directions - A Seattle Sounders soccer game that begins at 6:30 p.m. at CenturyLink Field will cause additional congestion on highways leading into Seattle, including I-5, I-90, SR 520 and SR 99. Last Updated: 7/9/2019 5:51 PM More Info
From milepost 162 to milepost 175
MODERATE IMPACT
I-5 Southbound - Beginning Monday, July 15 until further notice: A single lane on southbound I-5 between mileposts 51.43 and 52.79 will be closed around-the-clock until construction on the bridge is complete. Overnight double-lane closures will be in place from 9 p.m. to 6 a.m. nightly Monday through Friday.
Note: The speed limit has been reduced to 55 mph throughout the length of the work zone for the duration of construction. Last Updated: 7/5/2019 5:45 PM More Info
From milepost 52 to milepost 53
MODERATE IMPACT
SR 14 Both Directions - Monday, July 8 until further notice: Beginning at 7 a.m., all travelers within the intersection of SR 14 and 32nd Street will be shifted to a temporary roundabout for approximately five weeks. Last Updated: 7/5/2019 5:13 PM More Info
At milepost 17
MODERATE IMPACT
SR 20 Both Directions - Lane Closures and alternating piloted traffic, on SR 20 in both directions, from milepost 302 to milepost 342 (Republic to Barney's Jct.) for road work, from June 26, 2019 until August 15, 2019. Expect delays, lengthy at times. Last Updated: 7/4/2019 7:09 AM More Info
From milepost 302 to milepost 342
MODERATE IMPACT
Bigelow Gulch Rd Both Directions - Closure for road work in Spokane Valley on Bigelow Gulch Rd, both directions, from Argonne Rd to Forker Rd, beginning at 6:00 am on July 8, 2019 until about 6:00 am on July 22, 2019. Travelers should seek alternate routes. Last Updated: 7/3/2019 9:58 AM More Info

MODERATE IMPACT
Little Spokane Dr Both Directions - Spokane County: Spokane County will have Little Spokane Dr closed between Little Spokane Lane to Shady Slope for installing sewer lines. Expect delays, use other routes. Last Updated: 6/30/2019 8:58 AM More Info

MODERATE IMPACT
I-5 Southbound - SB I-5 Traffic Shift in Fife: SB I-5 drivers exiting at Bay Street/SR 167 need to stay in the right lane at Port of Tacoma Road to reach exit 135; Port of Tacoma Road drivers headed to SB I-5 will follow a temporary collector/distributor lane across the old SB I-5 bridge to rejoin mainline; SB I-5 travelers going to Tacoma’s city center, SR 16 or Olympia will use three left lanes at Port of Tacoma Road to reach their destinations. Last Updated: 6/29/2019 7:00 AM More Info
From milepost 136 to milepost 137
MODERATE IMPACT
US 195 Both Directions - Construction on US 195 both directions from milepost 62.3 near SR 271 Off-Ramp to milepost 69.9 near Plaza Rd On Ramp beginning at 7:00 pm on May 20, 2019 until further notice. Construction will be 24 hrs a day. Expect possible single lane closures and pilot car operations. Last Updated: 6/18/2019 3:01 PM More Info
From milepost 62 to milepost 70
MODERATE IMPACT
SR 107 Both Directions - Drivers will encounter one-way alternating traffic with a temporary signal through fall 2020 as Rognlin's Inc. crews for WSDOT rehabilitate the 58-year-old SR 107 Chehalis River Bridge south of Montesano. Last Updated: 5/29/2019 3:52 PM More Info
From milepost 7 to milepost 8
MODERATE IMPACT
SR 109 Both Directions - A private developer for the Quinault Tribe is making improvements to local streets on and off SR 109 near the Hogan’s Corner QMART convenience store. Drivers will encounter occasional lane and shoulder closures during weekday daytime hours through late September 2019. Work includes intersection improvements, new turn lanes and utility relocation. Last Updated: 5/17/2019 9:16 AM More Info
From milepost 16 to milepost 17
MODERATE IMPACT
US 195 Both Directions - Construction on US 195 both directions at milepost 94.9 near Thorp Rd beginning at 7:00 am on May 13, 2019, until further notice. Last Updated: 5/10/2019 3:09 PM More Info
At milepost 95
MODERATE IMPACT
US 2 Eastbound - ON US2/97 east of the Odabashian Bridge-the Cascade Avenue exit is closed for construction of the 35th St. extension until July. There is a signed detour. Last Updated: 4/26/2019 4:35 PM More Info
At milepost 121
MODERATE IMPACT
SR 290 Both Directions - The Hamilton/SR 290 westbound on-ramp to I-90 is closed for construction to continue bridge deck repair until further notice. Last Updated: 4/2/2019 7:45 AM More Info
From milepost 0 to milepost 1
MODERATE IMPACT
SR 409 Both Directions - Beginning Friday, March 22, 2019, until further notice: Traffic will alternate through a single lane, around-the-clock, for bridge painting and deck replacement work. For everyone’s safety, the speed limit across the bridge is 25 mph. Please slow down and give crews room to work. Last Updated: 3/29/2019 11:55 AM More Info
At milepost 3
LOW IMPACT
SR 500 Both Directions - Thursday, July 18 to the morning of Monday, July 22: Travelers on both directions of SR 500 near Thurston Way, will be alternated through a single-lane, intermittently, under the overpass, nightly from 9 p.m. to 5 a.m., for utility work. Last Updated: 7/19/2019 2:05 PM More Info
At milepost 4
LOW IMPACT
Maple/Ash St Northbound - The City of Spokane will have lane closures on Maple and Ash Streets between Francis Ave. and Cedar Street for grinding and paving. Expect delays. Last Updated: 7/15/2019 8:28 AM More Info

LOW IMPACT
Five Mile Both Directions - The City of Spokane will have Five Mile Road closed from Lincoln to Strong Road Starting Monday, June 17,2019 through mid-November, for road work. Use other routes and expect delays. Last Updated: 7/15/2019 8:26 AM More Info

LOW IMPACT
I-90 Both Directions - On I-90 in Moses Lake (milepost 175.5 to 176.1) Wednesday and Thursday, 7 a.m. to 4 p.m., expect right lane closures and reduced speed zone of 55 mph through work zone where crews are repairing concrete on bridge slab edges. Speed limit returns to 70 mph during non-working hours, including weekends. Last Updated: 7/12/2019 1:23 PM More Info
From milepost 175 to milepost 176
LOW IMPACT
I-90 Both Directions - Schragg rest area on I-90 at MP 198 is open in both directions with portable toilets but no water available, about 22 miles west of Ritzville. beginning at 11:25 am on July 12, 2019 until further notice. Last Updated: 7/12/2019 11:42 AM More Info
At milepost 198
LOW IMPACT
Sprague Both Directions - The City of Spokane has Sprague Ave Closed between Scott and Grant Streets for road work. Use other routes and expect delays through mid-November 2019. Last Updated: 6/30/2019 9:27 AM More Info

LOW IMPACT
Post Both Directions - City of Spokane, the Post Street Bridge is closed to vehicular traffic starting immediately, through Spring of 2020. Use other routes. Last Updated: 6/30/2019 9:25 AM More Info

LOW IMPACT
Euclid Both Directions - The City of Spokane will have Euclid Ave closed between Ralph and Market Street for water and sewer installation. Use other routes, expect delays. Last Updated: 6/30/2019 9:22 AM More Info

LOW IMPACT
Stoneman Rd Both Directions - Spokane County: Stoneman Road will be closed from Parksmith Drive to Argonne Road for shoulder and ditch work and then chip sealing. This work is expected to last through July 24, 2019 Expect delays. Last Updated: 6/30/2019 9:11 AM More Info

LOW IMPACT
Bigelow Gulch Rd Both Directions - Spokane County: Construction work adding culverts, guardrail and paving. The speed limit has been reduced to 35 MPH. There will be lane restrictions. Expect delays during construction work. Last Updated: 6/30/2019 9:01 AM More Info

LOW IMPACT
Geiger Bv Both Directions - Spokane County will have Geiger Blvd closed between Hayford Rd and Thomas Mallen Rd for right of way improvements. Use other routes until August 2, 2019. Last Updated: 6/30/2019 8:57 AM More Info

LOW IMPACT
Aero Rd Both Directions - Spokane County: Aero Rd lane restrictions at Westbow for Round-a-bout construction, until about August 31st, 2019. The South leg of the round about will be closed starting June 3rd. Detours in place, expect delays. Use other routes. Last Updated: 6/30/2019 8:54 AM More Info

LOW IMPACT
Lincoln Northbound - City of Spokane will have Lincoln Street closed between Main Ave and Spokane Falls Boulevard for road work. Motorists should use other routes and expect delays. Last Updated: 6/11/2019 2:27 PM More Info

LOWEST IMPACT
SR 21 Both Directions - Construction on SR 21 both directions at both Keller Ferry Landing sites beginning at 7:30 am on April 17, 2019, until further notice. Crews will begin construction on new the new terminal and pontoon replacement. Ferry operation will not be impacted at this time. Last Updated: 4/16/2019 2:58 PM More Info
From milepost 107 to milepost 107
LOWEST IMPACT
US 395 Both Directions - Construction on US 395 Spur - NSC both directions at the Freya Roundabouts Monday - Friday 6:00 am to 4:30 pm. Roadway users should be alert for occasional traffic control. Last Updated: 8/2/2018 12:51 PM More Info
At milepost 164