HIGH IMPACT
US 97 Both Directions - On US 97 between milepost 159 and 160 (Swauk campground), Beginning Monday at 6 a.m., traffic is reduced to a single lane with a temporary signal to move traffic through the work zone while the contractor pours concrete for the bridge structure. This traffic control will be in place 24/7 until midday Thursday to allow the concrete to set properly. A reduced speed of 35 m.p.h. is in placeand 10 ft. width restriction for NB traffic, and a 11 ft. width restriction for SB traffic remain in place. Last Updated: 6/18/2021 1:37 PM More Info
From milepost 159 to milepost 161
HIGH IMPACT
US 2 Both Directions - On US 2 between milepost 58 and 79 (Stevens Pass), Monday through Thursday from 6 a.m. to 5 p.m., travelers can expect flagger controlled traffic with delays of 30 minutes where a contractor is removing hazard trees. Last Updated: 6/18/2021 1:20 PM More Info
From milepost 59 to milepost 78
MODERATE IMPACT
I-90 Both Directions - I-90 milepost 34 to 137, North Bend to Vantage: There are a number of work zones between North Bend and Vantage. Motorists will experience minor delays due to lane closures and other traffic revisions in place for maintenance and construction activities. Motorists are reminded to slow down and obey all traffic control devices as you enter and exit our work zones. Last Updated: 6/19/2021 8:56 AM More Info
From milepost 34 to milepost 136
MODERATE IMPACT
US 2 Both Directions - On US 2/97 near Cashmere (milepost 110), Eastbound off ramp and westbound turn lane to W. Cashmere Bridge/Goodwin Rd. will be closed. The contractor on the West Cashmere Bridge project will begin roadwork on Hay Canyon Road as early as next week. The road will be torn up and a crew will begin building a roundabout just north of Vale Road. Traffic will be shifted around the work area and travelers can expect flagger controlled traffic during working hours. Last Updated: 6/13/2021 4:18 PM More Info
From milepost 110 to milepost 110
MODERATE IMPACT
SR 971 Both Directions - On SR 971 between milepost 0 and 15 (Navarre Coulee Rd.), Monday through Thursday from 7:30 a.m. to 3:30 p.m., expect automatic flagging assistance device with pilot car and delays up to 20 minutes where the crew is cracksealing the roadway. Last Updated: 6/13/2021 4:18 PM More Info
From milepost 0 to milepost 15
MODERATE IMPACT
I-90 Both Directions - On I-90 between milepost 148-152 (George), Monday through Thursday from 6 a.m. to 6 p.m., expect lane closures and reduced speed zones where the contractor is placing shoulder rumble strips, guideposts, recessed pavement parkers and plastic traffic markings. Last Updated: 6/13/2021 4:13 PM More Info
From milepost 148 to milepost 152
MODERATE IMPACT
US 2 Both Directions - On US 2 between milepost 119 and 121 (east of Easy St. in Wenatchee), Sunday through Thursday from 6 p.m. to 6 a.m., expect single lane closures and slow downs where the contractor is completing bridge joints, putting down paint and plastic line, installing concrete curb, and adjusting monuments and catch basins. Last Updated: 6/13/2021 4:09 PM More Info
From milepost 119 to milepost 121
MODERATE IMPACT
US 2 Both Directions - On US 2 between milepost 71 and 79 (Stevens Pass), Monday through Friday from 7 a.m. to 5 p.m. expect flagger controlled traffic and delays up to 20 minutes where the contractor is installing and fog sealing new edge line rumble stripe and putting down two coats of edge line paint. Last Updated: 6/13/2021 4:08 PM More Info
From milepost 71 to milepost 79
MODERATE IMPACT
US 2 Northbound - Motorists traveling over US 2 Stevens Pass should expect up to 20 minute delays as they encounter lane shifts and occasional flagger or pilot car controlled traffic due to a paving project. The hours for this project are Mon-Thur, 6 a.m. to 6 p.m. The work zone for this project extends from milepost 62, two and a half miles west of the summit, to milepost 71 on the east side of Stevens Pass. Last Updated: 6/13/2021 4:07 PM More Info
From milepost 62 to milepost 71
MODERATE IMPACT
I-90 Eastbound - Until further notice - One right lane of eastbound I-90 between SR 900 and 150th Avenue SE will close from 7 a.m. to 2 p.m. daily on weekdays. Last Updated: 6/11/2021 12:59 PM More Info
From milepost 11 to milepost 16
MODERATE IMPACT
I-90 Westbound - Until further notice - One right lane of westbound I-90 between SR 900 and 150th Avenue SE will close from 10 a.m. to 5 p.m. daily on weekdays. Last Updated: 6/11/2021 12:56 PM More Info
From milepost 16 to milepost 12
LOW IMPACT
US 2 Both Directions - On US 2 Stevens Pass between milepost 61.9 and 70.5, a reduced speed zone of 50 m.p.h. is in place due to rough road and potholing. Travelers should remain attentive for pot holing of the road through this section of highway and always drive for conditions. Repairs to this stretch of road are planned for June when it is warm enough for hot mix treatment. Last Updated: 6/6/2021 9:14 AM More Info
From milepost 62 to milepost 71
LOW IMPACT
SR 123 Both Directions - SR-123 Cayuse Pass is open for the season Last Updated: 5/29/2021 8:55 AM More Info