Return to Map

HIGH IMPACT
SR 28 Both Directions - SR 28 between Ephrata and Soap Lake (MP 44 to 53)- Sunday through Friday 7 a.m. to 7 p.m., expect lane shifts and alternating one-way traffic with delays up to 20 minutes within the city limits of Ephrata for milling and paving activities. Last Updated: 6/21/2019 2:33 PM More Info
From milepost 44 to milepost 53
MODERATE IMPACT
US 195 Both Directions - Construction on US 195 both directions from milepost 62.3 near SR 271 Off-Ramp to milepost 69.9 near Plaza Rd On Ramp beginning at 7:00 pm on May 20, 2019 until further notice. Construction will be 24 hrs a day. Expect possible single lane closures and pilot car operations. Last Updated: 6/18/2019 3:01 PM More Info
From milepost 62 to milepost 70
MODERATE IMPACT
I-90 Both Directions - I-90 milepost 175.5 to 176.1 (Moses Lake east of Blue Heron Park), Monday through Thursday, 7 a.m. to 4 p.m. there will be a 55 mph reduced speed zone and lane closures where the bridge maintenance crew is working on and around the bridge. Last Updated: 6/12/2019 7:57 AM More Info
From milepost 176 to milepost 177
MODERATE IMPACT
I-90 Both Directions - Construction on I-90 both directions from milepost 206.9 near SR 21 to milepost 220.1 near Ritzville beginning at 7:48 am on April 15, 2019, until further notice. Last Updated: 4/15/2019 7:52 AM More Info
From milepost 207 to milepost 221
LOWEST IMPACT
I-82 Both Directions - I-82 Columbia River Bridge Eastbound Deck Replacemen: The eastbound traffic is back to the eastbound Columbia River Bridge. The westbound lanes are reduced to a single lane. The speed limit is reduced to 40 mph. Last Updated: 6/24/2019 2:22 AM More Info
At milepost 132
LOWEST IMPACT
US 12 Both Directions - Pomeroy to East Alpowa Vicinity - Pavement Sealing: US 12 MP 405 to MP 419:
Monday through Friday from 7 a.m. to 5 p.m. There will be single lane piloted traffic control. Last Updated: 6/24/2019 12:22 AM More Info
From milepost 404 to milepost 418
LOWEST IMPACT
US 12 Both Directions - Nine Mile Hill to Frenchtown Vic. - Turnback Improvements:
US 12 MP 321 to MP 320. Monday, June 24 through Friday, June 28 from 7 a.m. to 5 p.m. flagging for possible lane closures for permanent striping, rumble strips and guideposts.
MP 321-MP 323: Monday, June 24 through Friday, June 28 from 7 a.m. to 5 p.m. single lane temporary signal control in place for 24 hours for removing guardrail and bridge rail. Last Updated: 6/23/2019 9:19 PM More Info
From milepost 318 to milepost 324
LOWEST IMPACT
I-182 Both Directions - I-182 MP 3: Monday, June 24 from 9 a.m. to 3 p.m. there will be a right lane closure for pavement markings. Last Updated: 6/23/2019 7:37 AM More Info
At milepost 3
LOWEST IMPACT
I-82 Both Directions - I-82 MP 93 to MP 95: Monday June 24 from 8 a.m. to 1 p.m. there will be a right lane closures for guardrail repairs. Last Updated: 6/23/2019 7:37 AM More Info
From milepost 93 to milepost 95