Emergency alert symbol

COVID-19

For the latest COVID-19 health guidance, statistics and resources, visit Coronavirus.wa.gov.

Return to Map

HIGHEST IMPACT
I-5 Southbound - Update 10:27 PM : On I-5 southbound just south of S 272nd St (MP 146) there is a disabled vehicle partially blocking the right lane. The State Patrol has arrived on the scene. Last Updated: 4/18/2021 10:27 PM More Info
At milepost 146
HIGHEST IMPACT
SR 167 Southbound - Update 9:59 PM : On SR 167 southbound at Ellingson Rd (MP 12) there is a collision blocking the left lane. The State Patrol has arrived on the scene. Last Updated: 4/18/2021 9:59 PM More Info
At milepost 12
HIGH IMPACT
US 2 Both Directions - US-2 milepost 164 is closed 14 miles east of Waterville, just east of the Jct. of SR-172, due to a vehicle fire. An estimated time to open the highway is not determined. Last Updated: 4/18/2021 10:07 PM More Info
At milepost 164
HIGH IMPACT
SR 20 Both Directions - SR 20, the North Cascades Highway, is closed for the season in both directions between milepost 134, approximately 12 miles east of Newhalem and milepost 177 at Early Winters. Spring clearing work started April 5 and typically takes 4 to 6 weeks. Last Updated: 4/18/2021 2:18 PM More Info
From milepost 134 to milepost 177
HIGH IMPACT
I-90 Both Directions - Construction on I-90 both directions from milepost 295.7 near Harvard Rd Off Ramp to milepost 296.6 near Harvard Rd Off Ramp until further notice. Crews will be widening the Harvard Road overpass. Drivers can expect overnight closures of I-90. Last Updated: 4/16/2021 1:06 PM More Info
From milepost 296 to milepost 297
HIGH IMPACT
I-90 Both Directions - Construction on I-90 both directions at milepost 272.8 near SR 902 beginning at 8:34 am on March 24, 2021 until further notice. Various overnight closures are possible to I-90 as crews continue to work on the new overpass. Last Updated: 4/16/2021 1:03 PM More Info
At milepost 273
HIGH IMPACT
I-5 Southbound - From 12:01 a.m. Tuesday, May 4, to 12:01 a.m. Thursday, May 6, the Maytown Safety Rest Area on southbound I-5 will close around the clock to all traffic for maintenance. Last Updated: 4/15/2021 10:52 AM More Info
At milepost 94
HIGH IMPACT
I-5 Southbound - Starting 3/17, the Thorne Lane on-ramp to southbound I-5 is closed for construction until late spring. Murray Road travelers will detour north on I-5 to exit 124 at Gravelly Lake Drive, then go south on I-5. Tillicum travelers will use the Berkeley Street interchange to reach southbound I-5. Last Updated: 3/26/2021 11:48 AM More Info
From milepost 124 to milepost 124
HIGH IMPACT
SR 504 Both Directions - Beginning at dusk on Monday, Dec. 21, until further notice: The gates to the upper level of SR 504/Spirit Lake Memorial Highway, near Coldwater Lake, will be closed for the winter. Last Updated: 12/21/2020 4:06 PM More Info
At milepost 45
HIGH IMPACT
SR 302 Both Directions - This project project removes and replaces outdated culverts under SR 302 with fish passable structures, repaves 8 miles highway, and rebuilds sidewalks and ramps at the Key Center intersection of SR 302/SR 16. Work is currently on winter suspension and will resume in spring of 2021. All work will be done by fall of 2021. Last Updated: 11/25/2020 8:21 AM More Info
From milepost 11 to milepost 17
HIGH IMPACT
SR 123 Both Directions - SR-123 Cayuse Pass is closed for the season due to adverse road and weather conditions. The closure is from the Arch at the park boundary near milepost 2 to the junction of SR 123 and SR 410. Last Updated: 11/12/2020 12:49 PM More Info
From milepost 2 to milepost 17
HIGH IMPACT
SR 6 Both Directions - Beginning Oct. 5 through Sept. 13, 2021: Travelers in both directions of SR 6, near Twin Oaks Road can expect traffic switched to a 2-lane 25 mph detour bypassing the closure.  Work includes excavation for bridge piers, bridge construction and culvert removal/installation. Last Updated: 10/9/2020 10:05 AM More Info
From milepost 46 to milepost 47
HIGH IMPACT
US 101 Both Directions - Crews are removing multiple barriers to fish under US 101 between Sequim and Port Angeles at Bagley and Siebert Creeks for improved fish passage which will require around-the-clock construction, shifted lanes and reduced speeds through fall of 2021. Any highway closures will be announced in advance. Last Updated: 10/8/2020 10:49 AM More Info
From milepost 253 to milepost 257
MODERATE IMPACT
I-90 Both Directions - I-90 both directions milepost 34 North Bend to 136 Vantage: There are a number of maintenance and construction work zones between North Bend and Vantage. Motorists will experience minor delays this week due to lane closures. Pay attention and slow down as you enter and exit our work zones. Last Updated: 4/18/2021 7:30 PM More Info
From milepost 34 to milepost 136
MODERATE IMPACT
SR 170 Both Directions - On SR 170 between milepost 0 and 3.6 (Warden), Monday from 12 p.m. to 3:30 p.m., expect flagger controlled traffic with delays where the crew is working near the city of Warden. Last Updated: 4/18/2021 4:11 PM More Info
From milepost 0 to milepost 4
MODERATE IMPACT
SR 155 Both Directions - On SR 155 between milepost 13 and 79 (Banks Lake to Omak), Monday and Tuesday, from 6 a.m. to 6 p.m., expect flagger controlled traffic with delays where the contractor is installing new sign anchors. Last Updated: 4/18/2021 4:06 PM More Info
From milepost 13 to milepost 79
MODERATE IMPACT
SR 153 Both Directions - On SR 153 between milepost 2 and 29 (Pateros to Twisp), Wednesday through Friday, from 6 a.m. to 6 p.m., expect flagger controlled traffic with delays where the contractor is installing new sign anchors. Last Updated: 4/18/2021 4:04 PM More Info
From milepost 2 to milepost 29
MODERATE IMPACT
SR 20 Both Directions - On SR 20 between milepost 177 and 192 (Early Winters to Winthop), Monday through Thursday from 6 a.m. to 4:30 p.m., expect flagger controlled traffic with pilot car and delays where the crew is working. Last Updated: 4/18/2021 4:03 PM More Info
From milepost 177 to milepost 192
MODERATE IMPACT
SR 20 Both Directions - on SR 20 between milepost 263 and 296 (Tonasket to Republic), Monday through Thursday, from 6 a.m. to 6 p.m., expect flagger controlled traffic with delays where the contractor is installing new sign anchors. Last Updated: 4/18/2021 4:00 PM More Info
From milepost 263 to milepost 296
MODERATE IMPACT
SR 17 Both Directions - On SR 17 between milepost 119-127 (Leahy Junction), Monday from 8 a.m. to 2:30 p.m., expect flagger controlled traffic with delays where the crew is taking cores samples around Leahy Junction south of Bridgeport. Last Updated: 4/18/2021 2:44 PM More Info
From milepost 119 to milepost 127
MODERATE IMPACT
SR 17 Both Directions - On Sr 17 between milepost 50 and 57 (Patton Blvd. and Kittleson Rd. in Moses Lake), Monday through Thursday from 6 a.m. to 4:30 p.m., expect left lane closures and slow downs with right lanes open for through traffic. All exits and turns will be open. Last Updated: 4/18/2021 2:39 PM More Info
From milepost 50 to milepost 57
MODERATE IMPACT
I-90 Both Directions - On I-90 between milepost 148 and 165 (George to Moses Lake), Monday through Friday from 6 a.m. to 6 p.m., expect lane closures and reduced speed where the contractor is paving at grind out locations. Last Updated: 4/18/2021 2:15 PM More Info
From milepost 148 to milepost 165
MODERATE IMPACT
SR 410 Both Directions - SR-410 Chinook Pass is closed for the season. Eastbound traffic is closed at milepost 57, Crystal Mountain Boulevard, 12 miles west of the summit. Westbound traffic is closed at milepost 74.5 Morse Creek, 5 miles east of the summit. Last Updated: 4/16/2021 9:21 PM More Info
From milepost 57 to milepost 75
MODERATE IMPACT
SR 520 Eastbound - Monday, April 19, to the morning of Friday, April 23 – The Montlake Boulevard on-ramp to eastbound SR 520 will close from 8 p.m. to 6 a.m. nightly. Last Updated: 4/16/2021 10:50 AM More Info
At milepost 1
MODERATE IMPACT
SR 520 Both Directions - Monday, April 19, to the morning of Friday, April 23 – A single lane of SR 520 in each direction at Montlake Boulevard will close from 9 p.m. to 5 a.m. nightly. Last Updated: 4/16/2021 10:49 AM More Info
At milepost 1
MODERATE IMPACT
SR 520 Eastbound - Wednesday, April 21, to the morning of Friday, April 23 – The eastbound SR 520 off-ramp to West Lake Sammamish Parkway will close from 9 p.m. to 6 a.m. nightly. Last Updated: 4/16/2021 10:48 AM More Info
At milepost 12
MODERATE IMPACT
SR 520 Eastbound - Monday, April 19, to the morning of Thursday, April 22 – The 51st Street on-ramp to eastbound SR 520 will close from 9 p.m. to 6 a.m. nightly. Last Updated: 4/16/2021 10:46 AM More Info
At milepost 11
MODERATE IMPACT
SR 520 Eastbound - Monday, April 19, to the morning of Thursday, April 22 – The eastbound SR 520 off-ramp to 51st Street will close from 9 p.m. to 6 a.m. nightly. Last Updated: 4/16/2021 10:45 AM More Info
At milepost 11
MODERATE IMPACT
SR 520 Eastbound - Monday, April 19, to the morning of Saturday, April 24 – Lanes on eastbound SR 520 between 148th Avenue and 40th Street will shifted from 10 p.m. to 5 a.m. nightly with a signed detour. Last Updated: 4/16/2021 10:41 AM More Info
From milepost 9 to milepost 11
MODERATE IMPACT
SR 520 Eastbound - Monday, April 19, to the morning of Saturday, April 24 – The 148th Avenue on-ramp to eastbound SR 520 will close from 10 p.m. to 5 a.m. nightly. Last Updated: 4/16/2021 10:40 AM More Info
At milepost 9
MODERATE IMPACT
SR 520 Eastbound - Monday, April 19, to the morning of Saturday, April 24 – The eastbound SR 520 off-ramp to 40th Street will close from 10 p.m. to 5 a.m. nightly on week nights. Last Updated: 4/16/2021 10:38 AM More Info
At milepost 10
MODERATE IMPACT
I-90 Westbound - Until further notice - One right lane of westbound I-90 between SR 900 and 150th Avenue SE will close from 10 a.m. to 5 p.m. daily on weekdays. Last Updated: 4/16/2021 10:36 AM More Info
From milepost 12 to milepost 16
MODERATE IMPACT
I-90 Eastbound - Monday, April 19, to the morning of Thursday, April 22 – The eastbound I-90 HOV off-ramp to Bellevue Way will close from 9 p.m. to 5 a.m. nightly. Last Updated: 4/16/2021 10:17 AM More Info
At milepost 9
MODERATE IMPACT
I-90 Eastbound - Monday, April 19, to the morning of Thursday, April 22 – The eastbound I-90 off-ramp to Bellevue Way will close from 9 p.m. to 5 a.m. nightly. Last Updated: 4/16/2021 10:16 AM More Info
At milepost 9
MODERATE IMPACT
I-90 Westbound - Monday, April 19, to the morning of Thursday, April 22 – The Bellevue Way SE HOV on-ramp to westbound I-90 will close from 6 a.m. to 3 p.m. daily and 9 p.m. to 6 a.m. nightly. Last Updated: 4/16/2021 10:15 AM More Info
At milepost 9
MODERATE IMPACT
I-90 Both Directions - Tuesday, April 20, to the morning of Thursday, April 22 – Two lanes in each direction of I-90 at Rainier Avenue will close from 9 p.m. to 5 a.m. Last Updated: 4/16/2021 10:14 AM More Info
At milepost 3
MODERATE IMPACT
I-90 Westbound - Monday, April 19, to the evening of Wednesday, April 21 – A single lane of westbound I-90 east of North Bend will close from 6 a.m. to 6 p.m. daily. Last Updated: 4/16/2021 10:12 AM More Info
At milepost 34
MODERATE IMPACT
I-90 Both Directions - Construction on I-90 both directions at milepost 276.3 near Geiger Rd beginning at 7:00 am on April 12, 2021 until further notice.

Work begins on three new roundabouts at the I-90 Geiger/Grove Road interchange starting Monday, April 12. On Wednesday, April 14, the westbound I-90 loop on-ramp will permanently close. A detour on northbound Grove to WB I-90 will be in place along with drivers exiting WB I-90 needing access to southbound Grove Rd. Last Updated: 4/9/2021 1:26 PM More Info
At milepost 276
MODERATE IMPACT
I-90 Both Directions - Construction on I-90 both directions from milepost 250.0 near MP Marker 250 to milepost 270.0 near MP Marker 270 beginning at 7:00 am on April 12, 2021 until further notice. Last Updated: 4/9/2021 1:16 PM More Info
From milepost 250 to milepost 270
MODERATE IMPACT
SR 99 Northbound - Wednesday, April 14 to the morning of Wednesday, April 21– The northbound SR 99 off-ramp to Marginal Way will close from 8 p.m. to 5 a.m. nightly. Last Updated: 4/9/2021 10:52 AM More Info
At milepost 27
MODERATE IMPACT
US 101 Both Directions - Each weeknight from 8 p.m. to 7 a.m. the following morning, construction crews will reduce the highway near Morse Creek to one lane with flaggers through early fall 2021. Crews aim to improve safety along the corridor through construction of a raised landscaped median, reduced speed limit and other proven traffic calming measures. No work is scheduled during daytime hours or on weekends. Last Updated: 4/8/2021 9:27 AM More Info
From milepost 252 to milepost 263
MODERATE IMPACT
US 101 Both Directions - Travelers will encounter one-way alternating traffic following several feet of roadway settlement near Cosi Hill. This is the second major landslide discovered due to natural disaster. Crews continue to monitor conditions while a contract to repair the hillside is prepared. Construction could begin early summer 2021 and last through fall of 2022. Any road closures will be announced in advance. Last Updated: 4/8/2021 9:25 AM More Info
At milepost 79
MODERATE IMPACT
US 12 Both Directions - Utility crews for Grays Harbor PUD will replace power poles near Porter Creek Road beginning Tuesday, April 20 through Thursday, April 22 from 8 a.m. to 4:30 p.m. each day. Crews will alternate travelers through the work zone with flaggers. Expect delays. Last Updated: 4/8/2021 8:14 AM More Info
From milepost 26 to milepost 29
MODERATE IMPACT
SR 520 Both Directions - Flammable cargo is prohibited on SR 520 eastbound & westbound from Montlake Blvd (MP 1) to 84th Ave NE (MP 5). Last Updated: 4/7/2021 9:48 AM More Info
From milepost 1 to milepost 5
MODERATE IMPACT
SR 112 Both Directions - SR 112 near Jim Creek is closed until further notice due to six separate slides that occurred beginning in December of 2020. WSDOT is currently preparing a contract for competitive bids through extensive environmental reviews. Construction could begin in early May. During the closure, travelers will continue to detour via US 101 and SR 113. More details about reopening online . Last Updated: 4/1/2021 9:56 AM More Info
From milepost 32 to milepost 37
MODERATE IMPACT
US 2 Both Directions - On US 2/97 near Cashmere (milepost 110), Eastbound off ramp and westbound turn lane to W. Cashmere Bridge/Goodwin Rd. will be closed. The contractor on the West Cashmere Bridge project will begin roadwork on Hay Canyon Road as early as next week. The road will be torn up and a crew will begin building a roundabout just north of Vale Road. Traffic will be shifted around the work area and travelers can expect flagger controlled traffic during working hours. Last Updated: 3/26/2021 3:56 PM More Info
From milepost 110 to milepost 110
MODERATE IMPACT
SR 520 Eastbound - Monday, March 22, to the morning of Saturday, April 10 - The eastbound SR 520 off-ramp to 40th Street will close from 10 p.m. to 5 a.m. nightly on week nights. Last Updated: 3/19/2021 3:18 PM More Info
At milepost 10
MODERATE IMPACT
SR 290 Both Directions - Lane Closures for construction on SR 290 both directions at milepost 12.5 at Barker Rd, Spokane Valley, the Eastbound Exit to Wellesley Ave will also be closed, beginning at 10:49 am on March 17, 2021 until about August, 2021. Use other routes and expect long delays at times. Last Updated: 3/17/2021 12:40 PM More Info
At milepost 12
MODERATE IMPACT
US 195 Southbound - Right Lane Closure on US 195 SB at MP 81.5 near Cornwall Road for Bridge work near Spangle, expect slight delays, Maximum bridge weight 105,500 legal loads only, no over legal axle weights.beginning at 6:53 am on May 29, 2020 until further notice. Last Updated: 2/23/2021 7:18 AM More Info
At milepost 81
MODERATE IMPACT
I-5 Northbound - Beginning Monday, Jan. 4, until further notice: All freight trucks will encounter a traffic shift to use the center lane on northbound I-5 along the Lewis River Bridge, between mileposts 19.36 and 20.0, just south of Woodland.
Note: All travelers should slow down through the area and freight traffic should watch for advanced signs advising them when to shift to use the center lane. Last Updated: 12/30/2020 1:35 PM More Info
From milepost 19 to milepost 20
MODERATE IMPACT
SR 107 Both Directions - Alternating one-way traffic controlled by a temporary signal is in place around-the-clock through spring 2021 on the SR 107 Chehalis River Bridge near Montesano. Construction crews are rehabilitating the bridge. Last Updated: 12/21/2020 8:32 AM More Info
At milepost 7
MODERATE IMPACT
US 101 Both Directions - Crews are replacing three outdated culverts that run under US 101 at Steamboat Creek, Harlow Creek and Fisher Creek between Queets and Kalaloch. The culverts will be replaced with concrete girder bridges and are expected to open up nearly nine miles of potential fish habitat for salmon and resident fish. Work is expected to wrap up at all three sites fall of 2021. Travelers will encounter one-way alternating with a temporary signal around-the-clock. Last Updated: 11/25/2020 8:22 AM More Info
From milepost 146 to milepost 162
MODERATE IMPACT
SR 290 Both Directions - SR 290 closed for bridge replacement starting near MP 0.5 at the Spokane River, City of Spokane, EB 290 is closed at Hamilton Street, WB 290 is closed at Iron Court, commercial vehicles are diverted to Freya Street, all other traffic can use Mission Street, beginning at 6:18 am on June 3, 2020 until further notice. Follow signed detour route and expect delays. Last Updated: 6/3/2020 8:04 AM More Info
From milepost 1 to milepost 2
MODERATE IMPACT
Wellesley Both Directions - The City of Spokane: Starting Wednesday, Nov. 20, contractor crews working for the Washington State Department of Transportation will begin constructing the North Spokane Corridor (NSC) Wellesley Avenue interchange. During this time, Wellesley Avenue between Market Street and Freya Street will be closed to pedestrian, bicycle and vehicular traffic. The closure and interchange work will last until the end of 2022. Please use alternate routes. Last Updated: 11/12/2019 8:53 AM More Info

LOW IMPACT
Salnave Rd Both Directions - Spokane County will have lane closures for road work starting on
April 20, 2021 on Salnave Rd. between Dover Rd and Granite Lake Rd. Expect delays. Last Updated: 4/18/2021 3:35 PM More Info

LOW IMPACT
Mill Rd Both Directions - Spokane County will have lane closures for road work starting on April 20, 2021 on Mill Road between Waikki Rd. and Hasting Rd. Expect delays. Last Updated: 4/18/2021 3:32 PM More Info

LOW IMPACT
Melville Rd Northbound - Spokane County will have lane closures for road work, on Melville Rd between Spotted Rd and Hayford Rd. Expect delays. Last Updated: 4/18/2021 3:29 PM More Info

LOW IMPACT
US 2 Both Directions - On US 2 between milepost 105 and 107 (east of Don Senn Memorial Interchange), Monday and Tuesday, from 8 a.m. to 3 p.m., be attentive for shoulder closures where the crew is performing vegetation control beside the highway. Last Updated: 4/18/2021 2:28 PM More Info
From milepost 105 to milepost 107
LOW IMPACT
US 97 Both Directions - On US 97 between milepost 159 and 160 (Swauk campground), Traffic has been shifted to divided lanes around the work zone in the middle of the lanes. A reduced speed of 35 m.p.h. will be in place, as well as a 10 ft. width restriction for northbound traffic, and a 11 ft. width restriction for southbound traffic. Reduced speed zone and width restrictions remain in place 24/7. Last Updated: 4/18/2021 2:15 PM More Info
From milepost 159 to milepost 161
LOW IMPACT
US 2 Both Directions - On US 2 Stevens Pass between milepost 61.9 and 70.5, a reduced speed zone of 50 m.p.h. is in place due to rough road and potholing. Travelers should remain attentive for pot holing of the road through this section of highway and always drive for conditions. Repairs to this stretch of road are planned for June when it is warm enough for hot mix treatment. Last Updated: 4/18/2021 2:14 PM More Info
From milepost 62 to milepost 71
LOW IMPACT
US 2 Both Directions - On US 2 at milepost 100 (intersection of 9th St. in Leavenworth), Monday through Friday from 7 a.m. to 5 p.m., expect curb and sidewalk closures at one corner of the intersection where a contractor is upgrading failing curb ramps and installing new crossing push buttons. The contractor will complete work at one corner of the intersection then move to the next. Last Updated: 4/18/2021 2:13 PM More Info
At milepost 100
LOW IMPACT
Geiger Bv Both Directions - Spokane County will have lane restrictions on Geiger Blvd between Thomas Mallen Road and Electric Ave (Spokane City Limits) for road work starting on August 17th to about June 30, 2021. Thomas Mallen Road is open. Electric Ave. is open. Geiger Road is Closed at Grove Road. Local businesses are open, please use extreme caution when travelling inside the work zone. Use other routes and expect delays. Last Updated: 4/18/2021 11:04 AM More Info

LOW IMPACT
Assembly Rd Both Directions - Spokane County: A contractor will have single lane closures with flaggers for utility work. Expect delays until about April 29, 2021. Last Updated: 4/18/2021 11:00 AM More Info

LOW IMPACT
US 12 Both Directions - US 12 milepost 308 both directions, near Wallula Jct: Monday April 19 to Thursday April 22 from 7 a.m. to 4:30 p.m. each day, there will be flagged traffic control with short delays for the installing of new Permanent Traffic Recorders. This work is weather dependent. Last Updated: 4/16/2021 11:40 PM More Info
At milepost 308
LOW IMPACT
I-82 Westbound - I-82 westbound milepost 36, near Union Gap: The right lane is blocked due to a collision. Last Updated: 4/16/2021 10:48 PM More Info
At milepost 36
LOW IMPACT
I-82 Both Directions - I-82 milepost 19, 11 miles north of Yakima: Monday April 19 westbound and Tuesday April 20 eastbound, from 8 a.m. to 3 p.m. there will be a single right lane closure. Last Updated: 4/16/2021 10:35 PM More Info
At milepost 19
LOW IMPACT
I-82 Eastbound - I-82 milepost 40 eastbound, east of Union Gap: Wednesday April 21 and Thursday April 22 from 8 a.m. to 3 p.m. there will be a single lane closure, for bridge deck repair. Last Updated: 4/16/2021 10:31 PM More Info
At milepost 40
LOW IMPACT
SR 823 Both Directions - SR 823 milepost 2 to 5, Selah: Monday April 19 through Friday April 23, from 7 a.m. to 7 p.m. there will be single lane flagger or pilot car directed traffic, for pavement repair. Minimal Delays are anticipated. There is a 10 ft. width restriction through the work zone. Last Updated: 4/16/2021 10:28 PM More Info
From milepost 2 to milepost 5
LOW IMPACT
SR 821 Both Directions - SR 821 milepost 5 to 12 Yakima River Canyon: Monday April 19 to Thursday April 22 between 6:30 a.m. to 3:30 p.m., there will be flagged traffic control with a pilot car, and short delays for ditching operations. Last Updated: 4/16/2021 10:18 PM More Info
From milepost 5 to milepost 12
LOW IMPACT
SR 501 Both Directions - Beginning at 7 a.m., Sunday, April 18 through 5 p.m., travelers on SR 501 between Old Lower River Road and milepost 10.13, will be directed through the area with flaggers, for the Spring Classic Duathlon, Half Marathon. Last Updated: 4/16/2021 10:34 AM More Info
From milepost 4 to milepost 11
LOW IMPACT
I-90 Both Directions - Five new ramp meters are set to turn on the week of April 12. The start date for each ramp meter will be staggered and are as follows:

Tuesday, April 13 - Walnut & Monroe Street to eastbound I-90
Wednesday, April 14 - Division/Browne Street to eastbound I-90
Thursday, April 15 - SR 290/Hamilton Street to eastbound I-90
Wednesday, April 21 - Division/Browne Street to westbound I-90 Last Updated: 4/9/2021 1:32 PM More Info
From milepost 280 to milepost 283
LOW IMPACT
SR 261 Both Directions - Construction on SR 261 both directions from milepost 57.7 near Leisle Rd to milepost 57.9 near MP Marker 58 until further notice. A temporary detour road has been built around the construction zone where crews are replacing a drainage stucture. Last Updated: 3/23/2021 4:21 PM More Info
From milepost 58 to milepost 58
LOWEST IMPACT
SR 17 Both Directions - On SR 17 between milepost 43 and 48 (south of Moses Lake) Monday through Friday, from 7:30 a.m. to 5 p.m., be attentive for shoulder closures on both sides of the highway. Last Updated: 4/18/2021 2:32 PM More Info
From milepost 43 to milepost 48
LOWEST IMPACT
SR 224 Both Directions - SR 224 milepost 5, near West Richland: Monday, April 19 and Tuesday, April 20, between 7 a.m. and 5 p.m., expect a single lane closure with flaggers through the work zone, drivers may experience minor delays. Last Updated: 4/16/2021 11:43 PM More Info
At milepost 5
LOWEST IMPACT
SR 520 Eastbound - Friday, April 16, to the morning of Monday, April 19 - The Lake Washington Boulevard on-ramp to eastbound SR 520 will close from 6 p.m. Friday to 6 a.m. Monday. Last Updated: 4/16/2021 10:49 AM More Info
At milepost 2
LOWEST IMPACT
US 2 Both Directions - On US 2 at milepost 58 (east of Skykomish), the Iron Goat safety rest area is closed for the season as of Nov. 5, 2020. Last Updated: 4/5/2021 3:21 PM More Info
At milepost 58