SR 104 Both Directions - Travelers who use the SR 104 Hood Canal Bridge are encouraged to plan additional time. Beginning March 1, crews will conduct an in-depth inspection of the bridge that requires opening the draw span multiple times. During the draw span openings, the bridge is closed to all traffic. The inspections are scheduled from 9 a.m. to 3 p.m. Monday through Friday, March 1-5 and again 9 a.m. to 3 p.m. Monday through Friday, March 8-12.
Last Updated: 2/23/2021 1:17 PM
From milepost 14 to milepost 16
More