Vancouver Traffic and Cameras

Traveler Notice

Travel times between Oregon and Washington
Know before you go: Check travel time information for trips in the Portland/Vancouver area.

Vancouver Alerts

As of 9/21/2019 2:04 AM
Blocking Incidents
  • Closure on I-205 northbound Exit 30. The exit ramp to westbound SR 500 is closed, use alternate route, beginning at 8:17 pm on September 20, 2019 until further notice.
  • Closure on SR 500 westbound at milepost 5. The ramp to southbound I-205 is closed, use alternate route, beginning at 8:31 pm on September 20, 2019 until further notice.
  • Closure on SR 500 westbound at milepost 3.8, Thurston Way. The ramp from Thurston to westbound SR500 is closed. Use alternate route, beginning at 9:54 pm on September 20, 2019 until further notice.
Construction Closures
  • Construction on I-205 northbound from milepost 33.5 near 69th Avenue to milepost 34.1, near St Johns Rd. The left lane is close, use caution, beginning at 8:53 pm on September 20, 2019 until further notice.
  • Sunday, Sept. 15 to the morning of Saturday, Sept. 21: ?Up to two lanes of northbound I-205, between SR 14/Columbia River and the I-5/I-205 split, will close nightly, from 9 p.m. to 6 a.m., for concrete panel replacement work.
  • Friday, Sept. 20 to the morning of Saturday, Sept. 21:
    Up to two lanes of southbound I-5, between the on-ramp to SR 502 and the on-ramp to southbound I-205, will close overnight, from 9:30 p.m. to 8 a.m., for concrete panel replacement work.
  • Friday, Sept. 20 to the morning of Saturday, Sept. 21: Up to two lanes of westbound SR 500, between Gher Road and Thurston Way, will close overnight, from 8 p.m. to 9 a.m., for pavement repair work.
  • Friday, Sept. 20 to the morning of Saturday, Sept. 21: The following on- and off-ramps will be closed overnight from 8 p.m. to 9 a.m., for paving work:
    The on-ramp from Gher Road to westbound SR 500
    The westbound SR 500 off-ramp to the I-205 northbound on-ramp
    The northbound I-205 off-ramp to westbound SR 500
    The westbound SR 500 off-ramp to the I-205 southbound on-ramp
    The southbound I-205 off-ramp to westbound SR 500
    The westbound SR 500 off-ramp to Thurston Way
  • Construction on SR 500 westbound from milepost 4 near I-205 to milepost 3.8 near Thurston Way. The right lane is closed, use caution, beginning at 8:36 pm on September 20, 2019 until further notice.
  • Construction on I-205 northbound from milepost 36 near Salmon Creek to milepost 36.7 near Exit 36 / 134th Street. The right lane is closed, use caution, beginning at 9:20 pm on September 20, 2019 until further notice.
  • Construction on I-5 southbound from milepost 12.2, near Carty Road Overpass to milepost 9.3, near 179th Street. Two left lanes are closed, use caution beginning at 12:22 am on September 21, 2019 until further notice.
  • The northbound I-205 on-ramps from westbound SR 500 and eastbound Fourth Plain Boulevard will close overnight, from 10 p.m. to 7 a.m., for traffic loop repair work.
Special Events
  • None reported